911 resultados para agile project management method


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of the Master’s Thesis is to study the best practices to virtual project management from the project manager’ point of view. The best practices are divided according to a five-phase virtual project life cycle model. Each phase include concrete suggestions for actions. Research’s theoretical background is wide because of the broad subject matter. In the theoretical part topics such as virtual working, virtual project management challenges are examined and some concrete actions to tackle these challenges are introduced. Thesis’ approach is constructive, where a known problem is solved piece by piece after creating a pre-understanding of the topic. Existing research work is utilized when creating a model for virtual project team management. The basis of the model comes from various best practices read from literature and from the interviews conducted on experienced virtual project managers in the case organization. As a result the model combines both previous research and the organizations empirical experience. As an output of the thesis a model for virtual project team management is developed, which can be used as a guideline by the virtual project managers in their work. The model includes actions and practices what can be used to overcome the challenges of virtual project management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Validation and verification operations encounter various challenges in product development process. Requirements for increasing the development cycle pace set new requests for component development process. Verification and validation usually represent the largest activities, up to 40 50 % of R&D resources utilized. This research studies validation and verification as part of case company's component development process. The target is to define framework that can be used in improvement of the validation and verification capability evaluation and development in display module development projects. Validation and verification definition and background is studied in this research. Additionally, theories such as project management, system, organisational learning and causality is studied. Framework and key findings of this research are presented. Feedback system according of the framework is defined and implemented to the case company. This research is divided to the theory and empirical parts. Theory part is conducted in literature review. Empirical part is done in case study. Constructive methode and design research methode are used in this research A framework for capability evaluation and development was defined and developed as result of this research. Key findings of this study were that double loop learning approach with validation and verification V+ model enables defining a feedback reporting solution. Additional results, some minor changes in validation and verification process were proposed. There are a few concerns expressed on the results on validity and reliability of this study. The most important one was the selected research method and the selected model itself. The final state can be normative, the researcher may set study results before the actual study and in the initial state, the researcher may describe expectations for the study. Finally reliability of this study, and validity of this work are studied.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Vanhemmat keskoslasten kivun lievittäjinä Tutkimuksen tarkoituksena oli kehittää uusi kivunlievitysmenetelmä, Vanhempien käsikapalo, keskoslasten kivunhoitoon vastasyntyneiden teho-osastolla. Vanhempien käsikapalon tehokkuutta verrattiin kahdessa satunnaistetussa kontrolloidussa crossover-tutkimusasetelmassa ei-lääkkeelliseen näyttöön perustuvaan hoitoon (P.O. glukoosiliuos), lääkkeelliseen menetelmään (I.V. oksikodoni) ja lumeeseen (P.O. vesi) tai kontrolli hoitoon kantapääpiston ja hengitysteiden imemisen aikana. Lisäksi mitattiin kivunhoidon lyhytaikaisia sivuvaikutuksia (hapetuksen- ja pulssinlasku) ja pidempiaikaisia vaikutuksia uneen. Tutkittujen lasten ikä oli 28 raskausviikkoa (n = 20) ja 28 1/7 (n = 20). Toimenpidekipua arvioitiin Premature Infant Pain Profile (PIPP) -kipumittarilla. Interventioiden jälkeen unen rakenne analysoitiin 13 tunnin polysomnografia-rekisteröinneistä. Viimeisessä vaiheessa haastateltiin äitejä (n = 23), jotka olivat käyttäneet vanhempien käsikapaloa 2–4 viikkoa vastasyntyneiden teho-osastolla, strukturoidulla the Clinical Interview for Parents of High-Risk Infants -haastattelulla, johon oli lisätty kysymyksiä lapsen kivunhoidosta. Kantapääpiston aikana PIPP–pisteet olivat merkitsevästi matalampia P.O. glukoosiliuoksella (ka 4,85 ± 1,73, p ≤ 0,001) ja vanhempien käsikapalolla (ka 5,20 ± 1,70, p = 0,004) verrattuna lumeeseen (ka 7,05 ± 2,16). Hengitysteiden imemisen yhteydessä PIPP–pisteet olivat matalampia P.O. glukoosiliuoksella (ka 11,05 ± 2,31, p = 0,014) ja vanhempien käsikapalolla (ka 11,25 ± 2,47, p = 0,034) verrattuna lumeeseen (ka 12,40 ± 2,06). Oksikodonin teho oli verrattavissa lumeeseen kummankin toimenpiteen aikana. P.O. glukoosiliuoksen (21,3 %) ja lumeen (12,5 %) annosteluun liittyi merkittävästi enemmän lyhytaikaisia sivuvaikutuksia verrattuna oksikodoniin (5 %) tai vanhempien käsikapaloon (5 %). Oksikodoni muutti keskoslasten unen rakennetta vähentämällä merkittävästi aktiivisen unen määrää verrattuna muihin hoitoihin. Vanhemmat suhtautuivat positiivisesti käsikapalon käyttöön. Äitien osallistuminen kivunhoitoon voitiin jaotella kolmeen eri tyylin, jotka selittyivät äidin kiintymyksen tunteilla ja lapsen tehohoitoon liittyvällä stressillä. Vanhempien käsikapalo on suositeltavampi lyhyen toimenpidekivun lievittäjä kuin P.O. glukoosiliuos tai I.V. oksikodoni, kun tehokkuus, turvallisuus ja perhe otetaan huomioon.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Yritysten toimintaympäristöjen muuttuminen, organisaatioiden rajojen hämärtyminen ja aineettoman pääoman merkityksen korostuminen vaikeuttavat sekä onnistuneen strategian luontia, että sen toteuttamista. Strategisten mittausjärjestelmien avulla pyritään kehittämään ja varmistamaan strategian toteutuminen liiketoiminnassa. Parhaimmillaan hyvä mittaristo kertoo mitkä ovat yrityksen strategiset tavoitteet ja mihin yritys tulevaisuudessa haluaa panostaa. Suorituskyvyn mittaamisessa on perinteisesti keskitytty taloudellisiin mittareihin. Taloudelliset luvut ovat usein menneeseen viittaavia seuraustekijöitä, ei tulevaisuuteen katsovia mittareita. Tämän tutkimuksen tavoitteena oli projektiliiketoimintaa harjoittavan yrityksen projektinhallintaprosessin suorituskykymittariston kehittäminen. Tavoitteena oli rakentaa projektinhallintaprosessille tasapainoinen suorituskykymittaristo, joka ottaa huomioon myös aineettoman pääoman. Tutkimuksen tutkimusote oli toimintaanalyyttinen, jonka lisäksi tutkimus sisältää konstruktiivisen ja kvalitatiivisen tutkimusotteen piirteitä. Tutkimuksen tuloksia arvioitaessa havaitaan, että valitut mittarit ovat kiinteästi sidoksissa projektinhallintaprosessin kriittisiin menestystekijöihin. Kriittiset menestystekijät puolestaan valittiin tunnistetuista menestystekijöistä, jotka määriteltiin yrityksen strategiaan ja visioon perustuen. Mittariston tasapainoisuus näkyy aineettoman ja aineellisen pääoman mittareiden välillä kattaen samalla tasapainon ennakoivien ja seurausmittareiden kesken. Haasteellisinta oli projektinhallintaprosessin aineettoman pääoman mittaaminen, jota ei aikaisemmin ole mitattu. Aineettoman pääoman mittaaminen tasapainoisen mittariston viitekehyksessä on mahdollista, mutta vaatii organisaation ymmärryksen miksi aineetonta pääomaa mitataan ja miten se vaikuttaa kokonaisvaltaiseen suorituskykyyn.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to develop a suitable project control procedure for a target company that can be used in engineering, procurement, and construction or con-struction management contracts. This procedure contains suitable project control software and a model for the use of the software in practice. This study is divided into two main sections. Theoretical part deals with project management, focusing on cost and time dimensions in projects. Empirical part deals with the development of the project control procedure for the target compa-ny. This development takes place in two parts. In the first part, semi-structured interviews are used to find out the company’s employees’ demands and desires for the project control software which will then be used in the developed procedure. These demands and desires are compared to available software in the market and the most suitable one will be chosen. Interview results show that important factors are cost tracking, integration with other software, English language availability, references, helpdesk, and no need for regular updates. The most suitable one is CMPro5 cost control software. The chosen software is used in a pilot project, where its functions and use are analyzed. Project control procedure which will be used in the future is developed based on these procedures. The five steps in developed procedure include employment of a cost engineer, whose task is to maintain the procedure in the target company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis discusses adaption of new project management tool at ABB Oy Motors and Generators business unit, Synchronous Machines profit centre. Thesis studies project modeling in general and buries in the Gate Model used at ABB Synchronous Machines. It is essential to understand Gate Model because this new project management tool, called Project Master Document, is created on the base of the existing project model. Thesis also analyzes goals and structure of Project Master Document in order to ease implementation of this new tool. Project Master Document aims to improved customer order fulfillment by clearing order handover interface. Office process, especially responsibilities and target dates, become also clearer after Master Document implementation. The document is built to be frame for whole order fulfillment process including check points for each gate of project model and updated memos from all project meetings. Furthermore, project progress will be clearly stated by status markings and visualized with colors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Työn tavoitteena on selvittää, miten suomalainen rakennusyritys saa implementoitua projektihallinnan apuvälineistönsä Venäjälle. Lisäksi työn aikana laaditaan perusrakenne apuvälineistölle. Apuvälineistön avulla varmistetaan yhdenmukainen toiminta yrityksen projekteissa Venäjällä, sekä hallitaan näihin kohdistuvia riskejä. Työn toteutusmenetelmänä on konstruktiivinen tutkimusote, jossa lopputulos pohjautuu aikaisempaan teoriaan ja empiirisiin löydöksiin. Haastattelujen avulla rakennetaan näkemys apuvälineistölle ja apuvälineiden sisällölle asetettavista vaateista. Työssä esitetyt ratkaisut pohjautuvat teoriaan, haastatteluihin ja yrityksen sisäiseen materiaaliin. Rakennusprojektit ovat toteutustavaltaan yhtäläisiä maasta riippumatta, jonka vuoksi Suomessa käytössä oleva apuvälineistön rakenne toimii myös Venäjällä. Yksittäisten apuvälineiden eroavuudet johtuvat pääasiassa lainsäädännön sekä toimintatapojen eroavuudesta. Työn pohjalta havaittiin implementoinnin onnistumisen vaativan kolmen elementin toteutumisen. Nämä ovat toimivat apuvälineet, laadukas johtaminen sekä apuvälineistön käyttöönottosuunnitelman mukainen toiminta. Työn konstruktio kulminoituu käyttöönottosuunnitelmaan, mikä koostuu kolmesta mekanismista. Mekanismeilla huomioidaan apuvälineiden sovittamisen, apuvälineistön käyttöönoton sekä muutosjohtamisen vaateet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this thesis was to form an understanding about the common gaps in learning from projects, as well as possible approaches to bridging them. In the research focus were the questions on how project teams create knowledge, which fac- tors affect the capture and re-use of this knowledge and how organizations can best capture and utilize this project-based knowledge. The method used was qualitative metasummary, a literature-based research method that has previously been mainly applied in the domains of nursing and health care research. The focus was laid on firms conducting knowledge-intensive business in some form of matrix organization. The research produced a theoretical model of knowledge creation in projects as well as a typology of factors affecting transfer of project-based knowledge. These include experience, culture and leadership, planning and controlling, relationships, project review and documentation. From these factors, suggestions could be derived as to how organizations should conduct projects in order not to lose what has been learned.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Process management refers to improving the key functions of a company. The main functions of the case company - project management, procurement, finance, and human resource - use their own separate systems. The case company is in the process of changing its software. Different functions will use the same system in the future. This software change causes changes in some of the company’s processes. Project cash flow forecasting process is one of the changing processes. Cash flow forecasting ensures the sufficiency of money and prepares for possible changes in the future. This will help to ensure the company’s viability. The purpose of the research is to describe a new project cash flow forecasting process. In addition, the aim is to analyze the impacts of the process change, with regard to the project control department’s workload and resources through the process measurement, and how the impacts take the department’s future operations into account. The research is based on process management. Processes, their descriptions, and the way the process management uses the information, are discussed in the theory part of this research. The theory part is based on literature and articles. Project cash flow and forecasting-related benefits are also discussed. After this, the project cash flow forecasting as-is and to-be processes are described by utilizing information, obtained from the theoretical part, as well as the know-how of the project control department’s personnel. Written descriptions and cross-functional flowcharts are used for descriptions. Process measurement is based on interviews with the personnel – mainly cost controllers and department managers. The process change and the integration of two processes will allow work time for other things, for example, analysis of costs. In addition to the quality of the cash flow information will improve compared to the as-is process. Analyzing the department’s other main processes, department’s roles, and their responsibilities should be checked and redesigned. This way, there will be an opportunity to achieve the best possible efficiency and cost savings.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The case company in this study is a large industrial engineering company whose business is largely based on delivering a wide-range of engineering projects. The aim of this study is to create and develop a fairly simple Excel-based tool for the sales department. The tool’s main function is to estimate and visualize the profitability of various small projects. The study also aims to find out other possible and more long-term solutions for tackling the problem in the future. The study is highly constructive and descriptive as it focuses on the development task and in the creation of a new operating model. The developed tool focuses on estimating the profitability of the small orders of the selected project portfolio currently on the bidding-phase (prospects) and will help the case company in the monthly reporting of sales figures. The tool will analyse the profitability of a certain project by calculating its fixed and variable costs, then further the gross margin and operating profit. The bidding phase of small project is a phase that has not been covered fully by the existing tools within the case company. The project portfolio tool can be taken into use immediately within the case company and it will provide fairly accurate estimate of the profitability figures of the recently sold small projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research studied the project performance measurement from the perspective of strategic management. The objective was to find a generic model for project performance measurement that emphasizes strategy and decision making. Research followed the guidelines of a constructive research methodology. As a result, the study suggests a model that measures projects with multiple meters during and after projects. Measurement after the project is suggested to be linked to the strategic performance measures of a company. The measurement should be conducted with centralized project portfolio management e.g. using the project management office in the organization. Metrics, after the project, measure the project’s actual benefit realization. During the project, the metrics are universal and they measure the accomplished objectives relation to costs, schedule and internal resource usage. Outcomes of these measures should be forecasted by using qualitative or stochastic methods. Solid theoretical background for the model was found from the literature that covers the subjects of performance measurement, projects and uncertainty. The study states that the model can be implemented in companies. This statement is supported by empirical evidence from a single case study. The gathering of empiric evidence about the actual usefulness of the model in companies is left to be done by the evaluative research in the future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tässä tutkimuksessa selvitettiin, miten suorituskyvyn johtamista ja mittaamista käytännössä toteutettiin suuressa tutkimus- ja tuotekehitystoimintaa Suomessa harjoittavassa elintarvikealan yrityksessä. Tutkimuksessa kartoitettiin tärkeimpiä suorituskykyyn vaikuttavia tekijöitä suorituskyvyn johtamisen ja mittaamisen näkökulmasta. Tutkimuksen tavoitteena oli saada kooste suosituksista tutkimus- ja tuotekehitystoiminnan suorituskyvyn johtamisen ja mittaamisen kehittämiseksi. Tutkimuksen laajuus rajattiin neljään case-yritykseen. Tutkimuksessa tehtiin empiirinen puolistrukturoitu kyselytutkimus, strukturoidut haastattelut sekä tulosten arviointi. Tutkimusote oli lähinnä toiminta-analyyttinen, koska tutkimuksessa käsiteltiin organisaation toimintaa, johtamista, ongelmanratkaisua, päätöksentekoprosesseja sekä kehitys- ja muutosprosesseja. Tutkimustulosten perusteella suorituskyvyn johtamista ja mittaamista case-yrityksissä toteutettiin BSC:n yleisten näkökulmien mukaisesti. Tutkimus- ja tuotekehitystoiminnan mittauksen tavoitteet poikkesivat toisistaan niiden toiminnan luonteesta johtuen. Tutkimustoiminnassa suorituskyvyn mittauksen tavoitteet painottuivat lähinnä innovatiivisuuteen, oppimiseen ja motivointiin. Tuotekehitystoiminnassa mittauksen tavoitteet olivat enemmän diagnostisia. Tuotekehitystoiminnassa tavoitteena olivat projektien seurantaan, toiminnan tulostenarviointiin, talouteen sekä koordinaatioon ja kommunikointiin liittyvät tekijät. Tutkimustulosten perusteella puutteita havaittiin suorituskyvyn viestinnän riittävyydessä ja vaikuttavuudessa, mittaustiedon hyödynnettävyydessä, aineettoman pääoman mittauksessa, projektien arviointikriteerien viestinnässä, prosessien selkeydessä ja toimivuudessa, projektiosaamisessa, suorituskyvyn mittauksessa, vaikutusmahdollisuuksissa, johtamisessa ja esimiestyössä.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Ce rapport de recherche porte sur une étude s’intéressant au transfert des connaissances tacites chez les gestionnaires, c’est-à-dire le partage de ces connaissances et leur utilisation informelle, durant une situation de coordination dans un service municipal. La thèse est articulée autour des questions suivantes : Quelles sont les situations de coordination vécues par les gestionnaires municipaux? Quelles sont les sources de connaissances tacites partagées et utilisées? Quelles sont les relations de connaissances mobilisées de façon informelle lors du transfert des connaissances tacites? Quels sont les facteurs encourageant ou inhibant le transfert informel des connaissances tacites? À partir d’un modèle basé sur une approche situationnelle (Taylor, 1989 et 1991), nous avons revu la documentation touchant nos questions de recherche. Nous avons défini notamment la récursivité des connaissances et le réseau de connaissances, de même que présenté le modèle de la conversion des connaissances (Nonaka, 1994) et celui de l’actualisation de soi (St-Arnaud, 1996). Nous avons questionné 22 répondants à l’aide d’instruments de mesure qui combinent les techniques de l’incident critique, de l’entrevue cognitive et réflexive, le questionnement sur les réseaux organisationnels et l’observation participante. Tels des filets, ces instruments ont permis de traquer et d’obtenir des données d’une grande richesse sur les connaissances tacites et les comportements informels durant le transfert de connaissances en situation de coordination. Ces données ont été analysées selon une approche méthodologique essentiellement qualitative combinant l’analyse de contenu, la schématisation heuristique et l’analyse des réseaux sociaux. Nos résultats montrent que la complexité d’une situation de coordination conditionne le choix des mécanismes de coordination. De plus, les sources de connaissances sont, du point de vue individuel, le gestionnaire et ses artefacts, de même que son réseau personnel avec ses propres artefacts. Du point de vue collectif, ces sources sont réifiées dans le réseau de connaissances. Les connaissances clés d’une situation de coordination sont celles sur le réseau organisationnel, le contexte, les expériences en gestion et en situation complexe de coordination, la capacité de communiquer, de négocier, d’innover et celle d’attirer l’attention. Individuellement, les gestionnaires privilégient l’actualisation de soi, l’autoformation et la formation contextualisée et, collectivement, la coprésence dans l’action, le réseautage et l’accompagnement. Cette étude fournit un modèle valide du transfert contextualisé des connaissances qui est un cas de coordination complexe d’activités en gestion des connaissances. Ce transfert est concomitant à d’autres situations de coordination. La nature tacite des connaissances prévaut, de même que le mode informel, les médias personnels et les mécanismes d’ajustement mutuel. Les connaissances tacites sont principalement transférées au début des processus de gestion de projet et continuellement durant la rétroaction et le suivi des résultats. Quant aux connaissances explicites, les gestionnaires les utilisent principalement comme un symbole à la fin des processus de gestion de projet. Parmi les personnes et les groupes de personnes d’une situation de transfert contextualisé des connaissances, 10 % jouent des rôles clés, soit ceux d’experts et d’intermédiaires de personnes et d’artefacts. Les personnes en périphérie possèdent un potentiel de structuration, c’est-à-dire de connexité, pour assurer la continuité du réseau de connaissances organisationnel. Notre étude a élargi le modèle général de la complexité d’une situation (Bystrom, 1999; Choo, 2006; Taylor, 1986 et 1991), la théorie de la coordination (Malone et Crowston, 1994), le modèle de la conversion des connaissances (Nonaka, 1994), celui de l’actualisation de soi (St-Arnaud, 1996) et la théorie des réseaux de connaissances (Monge et Contractor, 2003). Notre modèle réaffirme la concomitance de ces modèles généraux selon une approche constructiviste (Giddens, 1987) où la dualité du structurel et la compétence des acteurs sont confirmées et enrichies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

En la actualidad y de acuerdo al informe del Sistema Nacional de Instituciones de Educación Superior (SNIES) la deserción estudiantil en la Educación Superior está en el 52%. Cada Institución de Educación Superior (IES) realiza esfuerzos por retener y sostener en el tiempo a los estudiantes académicamente viables; estos esfuerzos están divididos en diferentes frentes: Académico, Financiero, Psicológico y Cultural. Desde la estructura administrativa se busca responder a esta necesidad, y para ello, con el fin de contrarrestar el retiro o abandono de los estudiantes de pregrado y posgrado en la Universidad del Rosario, identificado mediante la aplicación de la metodología propuesta por La Estrategia de los Cuatro Círculos y el Método MEYEP, ante cuyas conclusiones y recomendaciones se procedió a realizar un proyecto que pretende conformar una Unidad de Gestión Integral de Apoyo al Estudiante (UGIAE). Unidad que constituye una iniciativa por integrar los esfuerzos en un organismo que responda a las necesidades de los estudiantes y cuya directriz se enmarque en el contexto del Plan Integral de Desarrollo – PID – de la Universidad. La finalidad de la UGIAE es facilitar a los estudiantes académicamente viables de la Universidad del Rosario, la culminación de sus estudios; para lo cual se pretende el mejor aprovechamiento de las competencias humanas, el trabajo en equipo, y la transdisciplinariedad que canalice los esfuerzos colectivos; para este efecto se desarrolla un modelo de simulación en Stella en el que convergen y se aplican las recomendaciones finales del presente documento.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

En un mundo hiperconectado, dinámico y cargado de incertidumbre como el actual, los métodos y modelos analíticos convencionales están mostrando sus limitaciones. Las organizaciones requieren, por tanto, herramientas útiles que empleen tecnología de información y modelos de simulación computacional como mecanismos para la toma de decisiones y la resolución de problemas. Una de las más recientes, potentes y prometedoras es el modelamiento y la simulación basados en agentes (MSBA). Muchas organizaciones, incluidas empresas consultoras, emplean esta técnica para comprender fenómenos, hacer evaluación de estrategias y resolver problemas de diversa índole. Pese a ello, no existe (hasta donde conocemos) un estado situacional acerca del MSBA y su aplicación a la investigación organizacional. Cabe anotar, además, que por su novedad no es un tema suficientemente difundido y trabajado en Latinoamérica. En consecuencia, este proyecto pretende elaborar un estado situacional sobre el MSBA y su impacto sobre la investigación organizacional.