30 resultados para Balanced Scorecard implementation, management control systems
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Finance from the NOVA – School of Business and Economics
Resumo:
RESUMO - O título do presente trabalho de projeto é: “Balanced Scorecard como metodologia utilizada no planeamento estratégico de um Laboratório de Patologia Clínica”. Atualmente a qualidade dos serviços prestados na área da saúde constitui uma questão que preocupa todos os stakeholders envolvidos. Neste âmbito, a escolha desta temática prende-se com a necessidade urgente de mudança no sentido de melhorar a performance do Laboratório de Patologia Clínica. Melhorar a qualidade dos serviços prestados garantindo a eficiência e sustentabilidade do serviço constitui a grande máxima de qualquer organização. Os objetivos deste trabalho de projeto são, entre outros: analisar as implicações da avaliação da qualidade de gestão utilizando o Balanced Scorecard como metodologia; destacar a importância do uso desta metodologia num Laboratório de Patologia Clínica no que diz respeito à melhoria da qualidade, da efetividade e da eficiência e apresentar uma proposta de aplicação desta metodologia a um serviço de Patologia Clínica. A filosofia do Balanced Scorecard assenta em 4 perspetivas, financeira, dos clientes, dos processos internos e a perspetiva crescimento e aprendizagem, que funcionam de forma integrada permitindo uma avaliação da qualidade de gestão. Em cada uma destas perspetivas são definidos objetivos e indicadores que têm de funcionar de forma integrada estabelecendo relações causa-efeito entre elas. Qualquer falha decorrente de objetivos não atingidos numa das perspetivas origina o desequilíbrio de todo o sistema desencadeando desvios no percurso estratégico, no cumprimento da missão e da visão da organização. A metodologia utilizada consiste essencialmente na recolha de dados resultantes da entrevista, pesquisa bibliográfica e análise documental do serviço de Patologia Clínica, que contribuíram para a elaboração de uma proposta de implementação. A aplicação de um sistema de medição da qualidade é essencial e a metodologia Balanced Scorecard pode constituir uma ferramenta fundamental neste sentido, facilitando a gestão de organizações de saúde.
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Informática
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Finance from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
Traditional approaches to evaluate performance in hotels, have mainly used financial measures. Building on Speckbacher et al. (2003), this Work Project aims to design and propose a Balanced Scorecard Type II as a performance measurement/management system for the hospitality industry based on data collected at the Luxury Brand Hotels of Pestana Group. The main contribution is to better align the vision, strategy and financial and non-financial performance measures in this category of hotels, in particular those of Pestana Group, and by doing so, lead their managers to focus on what is really critical and, consequently improve the overall performance.
Resumo:
Directed internship
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para a obtenção do grau de Mestre em Ordenamento do Território e Planeamento Ambiental
Resumo:
Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial
Resumo:
Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores
Resumo:
The way in which electricity networks operate is going through a period of significant change. Renewable generation technologies are having a growing presence and increasing penetrations of generation that are being connected at distribution level. Unfortunately, a renewable energy source is most of the time intermittent and needs to be forecasted. Current trends in Smart grids foresee the accommodation of a variety of distributed generation sources including intermittent renewable sources. It is also expected that smart grids will include demand management resources, widespread communications and control technologies required to use demand response are needed to help the maintenance in supply-demand balance in electricity systems. Consequently, smart household appliances with controllable loads will be likely a common presence in our homes. Thus, new control techniques are requested to manage the loads and achieve all the potential energy present in intermittent energy sources. This thesis is focused on the development of a demand side management control method in a distributed network, aiming the creation of greater flexibility in demand and better ease the integration of renewable technologies. In particular, this work presents a novel multi-agent model-based predictive control method to manage distributed energy systems from the demand side, in presence of limited energy sources with fluctuating output and with energy storage in house-hold or car batteries. Specifically, here is presented a solution for thermal comfort which manages a limited shared energy resource via a demand side management perspective, using an integrated approach which also involves a power price auction and an appliance loads allocation scheme. The control is applied individually to a set of Thermal Control Areas, demand units, where the objective is to minimize the energy usage and not exceed the limited and shared energy resource, while simultaneously indoor temperatures are maintained within a comfort frame. Thermal Control Areas are overall thermodynamically connected in the distributed environment and also coupled by energy related constraints. The energy split is performed based on a fixed sequential order established from a previous completed auction wherein the bids are made by each Thermal Control Area, acting as demand side management agents, based on the daily energy price. The developed solutions are explained with algorithms and are applied to different scenarios, being the results explanatory of the benefits of the proposed approaches.
Resumo:
This paper tackles the broad issue of TQM implementation in SMEs. It includes a review of two models aimed at improving organisational performance, the EFQM Excellence Model and the Balanced Scorecard, which have been widely used in large organisations. Both models are examined as to their suitability and applicability to small and medium sized enterprises. The findings indicate that SMEs can benefit from the adoption of an integrated approach that combines both models if some critical factors are considered in the implementation process. A theoretical framework is proposed, which considers such integration and leads to a gradual implementation of TQM principles and methods in SMEs.
Resumo:
RESUMO - A consciência de uma necessidade clara em rentabilizar a capacidade instalada e os meios tecnológicos e humanos disponíveis no Bloco Operatório e face ao imperativo de um cabal desempenho e de uma adequada efectividade nestes serviços levou-nos à realização deste estudo. Objectivos: O trabalho de projecto centrou-se em quatro objectivos concretos: Elaboração de uma grelha de observação de Modelos de Gestão de Bloco Operatório; Observação de seis Modelos de Gestão de Blocos Operatórios em experiências nacionais e in-loco, de acordo com a grelha de observação; Avaliação da qualidade gestionária na amostra seleccionada à luz dos modelos existentes; Criação de uma grelha de indicadores para a monitorização e avaliação do Bloco Operatório. Metodologia: Na elaboração da grelha de observação dos Blocos Operatórios recorremos a um grupo de peritos, à bibliografia disponível e à informação recolhida em entrevistas. Aplicámos a grelha de observação aos seis Blocos Operatórios e analisámos as informações referentes a cada modelo com a finalidade de encontrar os pontos-chave que mais se destacavam em cada um deles. Para a elaboração da grelha de indicadores de monitorização do Bloco Operatório realizámos uma reunião recorrendo à técnica de grupo nominal para encontrar o nível de consenso entre os peritos. Resultados: Criámos uma grelha de observação de Modelos de Gestão de Bloco Operatório que permite comparar as características de gestão. Esta grelha foi aplicada a seis Blocos Operatórios o que permitiu destacar como elementos principais e de diferenciação: o sistema de incentivos implementado; o sistema informático, de comunicação entre os serviços e de débito directo dos gastos; a existência de uma equipa de gestão de Bloco Operatório e de Gestão de Risco; a importância de um planeamento cirúrgico semanal e da existência de um regulamento do Bloco Operatório. Desenhámos um painel de indicadores para uma monitorização do Bloco Operatório, de onde destacamos: tempo médio de paragem por razões técnicas, tempo médio de paragem por razões operacionais, tempo médio por equipa e tempo médio por procedimento. Considerações finais: Os Blocos Operatórios devem ponderar a existência das componentes mais importantes dos Modelos, bem como recolher exaustivamente indicadores de monitorização. A investigação futura deverá debruçar-se sobre a relação entre os indicadores de monitorização e os Modelos de Gestão, recorrendo à técnicas de benchmarking. -------------------ABSTRACT - This study was driven by the need to optimise available capacity, technology and human resources in the Operating Room and to address the corresponding goals of adequate performance and effectiveness. Objectives: This project focuses on four specific objectives: development of an observation grid of operating room management models; in-loco observation and documentation of six national operating room, according to the grid; assess the quality of management in the selected sample relative to existing management models; create a set of indicators for monitoring and evaluating operating rooms. Methodology: The design of the observation grid was based on experts’ consultation, a literature survey and information gathered in various interviews. The observation grid was applied to six operating rooms and the information for each management model was analysed in order to find its key characteristics. We used the Nominal Group Technique in order to develop a set of indicators for monitoring and evaluating operating rooms. Results: An observation grid was created for operating rooms management models, which allowed comparing management characteristics. This grid was applied to six operating rooms allowing disentangle its main features and differentiating characteristics: implementation of incentive systems; IT systems including information flow between services; inventory and expense management; existence of a management team and effective risk management; importance of weekly planning and regulations. We designed a set control indicators, whose major characteristics are the following: the average down time due to technical reasons, the average down time due to operational reasons, the average time per team and the average time per procedure. Final Conclusions: Operating rooms should consider the most relevant characteristics of management models and collect exhaustive information on control indicators. Future research should be devoted to assessing the operating room performance according to management models, using control indicators and benchmarking techniques.