868 resultados para Project management Computer programs


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The challenges posed by global climate change are motivating the investigation of strategies that can reduce the life cycle greenhouse gas (GHG) emissions of products and processes. While new construction materials and technologies have received significant attention, there has been limited emphasis on understanding how construction processes can be best managed to reduce GHG emissions. Unexpected disruptive events tend to adversely impact construction costs and delay project completion. They also tend to increase project GHG emissions. The objective of this paper is to investigate ways in which project GHG emissions can be reduced by appropriate management of disruptive events. First, an empirical analysis of construction data from a specific highway construction project is used to illustrate the impact of unexpected schedule delays in increasing project GHG emissions. Next, a simulation based methodology is described to assess the effectiveness of alternative project management strategies in reducing GHG emissions. The contribution of this paper is that it explicitly considers projects emissions, in addition to cost and project duration, in developing project management strategies. Practical application of the method discussed in this paper will help construction firms reduce their project emissions through strategic project management, and without significant investment in new technology. In effect, this paper lays the foundation for best practices in construction management that will optimize project cost and duration, while minimizing GHG emissions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this online course is to ensure new nursing graduate students know how to use computer technologies required to complete academic and research activities. Powerful computers, high speed internet, digitalized resources and databases are widely available in educational institutes. New renovation and updates are being released at faster pace than ever. All these developments are necessary for a student to utilize computer programs and synthesize large amount of data in a limited time for any given academic research project. [See PDF for complete abstract]

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reports a learning experience related to the acquisition of project management competences. Students from three different universities and backgrounds, cooperate in a common project that drives the learning-teaching process. Previous related works on this initiative have already evaluated the goodness of this multidisciplinary, project-based learning approach in the context of a new educative paradigm. Yet the innovative experience has allowed the authors to define a rubric in order to measure specific competences in project management. The study shows the rubric’s main aspects as well as competence acquisition evaluation alternatives, based in the metrics defined. Key indicators and specific reports obtained from data base fields in the web tool will support this work. As a result, new competences can be assessed, such ones like teamwork, problem solving, communication and leadership. Final goal is to provide an overall competence map to the students at the same time they improve their skills.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A high productivity rate in Engineering is related to an efficient management of the flow of the large quantities of information and associated decision making activities that are consubstantial to the Engineering processes both in design and production contexts. Dealing with such problems from an integrated point of view and mimicking real scenarios is not given much attention in Engineering degrees. In the context of Engineering Education, there are a number of courses designed for developing specific competencies, as required by the academic curricula, but not that many in which integration competencies are the main target. In this paper, a course devoted to that aim is discussed. The course is taught in a Marine Engineering degree but the philosophy could be used in any Engineering field. All the lessons are given in a computer room in which every student can use each all the treated software applications. The first part of the course is dedicated to Project Management: the students acquire skills in defining, using Ms-PROJECT, the work breakdown structure (WBS), and the organization breakdown structure (OBS) in Engineering projects, through a series of examples of increasing complexity, ending up with the case of vessel construction. The second part of the course is dedicated to the use of a database manager, Ms-ACCESS, for managing production related information. A series of increasing complexity examples is treated ending up with the management of the pipe database of a real vessel. This database consists of a few thousand of pipes, for which a production timing frame is defined, which connects this part of the course with the first one. Finally, the third part of the course is devoted to the work with FORAN, an Engineering Production package of widespread use in the shipbuilding industry. With this package, the frames and plates where all the outfitting will be carried out are defined through cooperative work by the studens, working simultaneously in the same 3D model. In the paper, specific details about the learning process are given. Surveys have been posed to the students in order to get feed-back from their experience as well as to assess their satisfaction with the learning process. Results from these surveys are discussed in the paper

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The European Commission established Mid-term evaluation for the period 2007-2013 on Rural Development Programs as part of a continuous evaluation system. Mid-term evaluations are important for the Commission because they help measuring the success of a program, as well as giving advice and pointing out good practices for the current and consecutive programming periods. One of the main elements used to achieve these objectives is the impact indicators estimation of the program. This paper will focus on how impact indicators estimation is done for just the environmental indicators. To do this the 88 Mid-term evaluations of Rural Development Programs for 2007-2013 period, were analyzed. This study shows how far the actual methodologies to obtain impact indicators? values are from what the European Commission expects when demanding this task to be done.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Contract W-7405-ENG.36 with the U.S. Atomic Energy Commission."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Because organizations are making large investments in Information systems (IS), efficient IS project management has been found critical to success. This study examines how the use of incentives can improve the project success. Agency theory is used to: identify motivational factors of project success, help the IS owners to understand to what extent management incentives can improve IS development and implementation (ISD/I). The outcomes will help practitioners and researchers to build on theoretical model of project management elements which lead to project success. Given the principal-agent nature of most significant scale of IS development, insights that will allow for greater alignment of the agent’s goals with those of the principal through incentive contracts, will serve to make ISD/I both more efficient and more effective, leading to more successful IS projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Time, cost and quality achievements on large-scale construction projects are uncertain because of technological constraints, involvement of many stakeholders, long durations, large capital requirements and improper scope definitions. Projects that are exposed to such an uncertain environment can effectively be managed with the application of risk management throughout the project life cycle. Risk is by nature subjective. However, managing risk subjectively poses the danger of non-achievement of project goals. Moreover, risk analysis of the overall project also poses the danger of developing inappropriate responses. This article demonstrates a quantitative approach to construction risk management through an analytic hierarchy process (AHP) and decision tree analysis. The entire project is classified to form a few work packages. With the involvement of project stakeholders, risky work packages are identified. As all the risk factors are identified, their effects are quantified by determining probability (using AHP) and severity (guess estimate). Various alternative responses are generated, listing the cost implications of mitigating the quantified risks. The expected monetary values are derived for each alternative in a decision tree framework and subsequent probability analysis helps to make the right decision in managing risks. In this article, the entire methodology is explained by using a case application of a cross-country petroleum pipeline project in India. The case study demonstrates the project management effectiveness of using AHP and DTA.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A selecção do tema e consequente trabalho de que emerge o titulo desta dissertação decorreu do facto de se ter tomado conhecimento da necessidade que os membros do projecto FCOMP-01-0124-FEDER-007360 - Inquirir da Honra: Comissários do Santo Oficio e das Ordens Militares em Portugal (1570 - 1773) tiveram para satisfazer alguns objectivos em particular relacionados com a Genealogia da rede de Comissários. O sistema de trabalho manual que até aqui era utilizado, continha uma quantidade considerável de informação complexa, descrevendo ao pormenor as características não só dos indivíduos, mas também do que estava associado ao mesmo, incluindo quem e como se relacionava com as demais figuras. O principal objectivo consistiu assim em responder à pergunta: "Como será possível efectuar uma gestão de toda a informação genealógica recolhida no papel e permitir a sua análise no computador, recorrendo a tecnologias que, por um lado sejam eficientes, e por outro, fáceis de aprender pelos utilizadores?". Para conseguir responder à questão, foi necessário conhecer em primeira mão, o universo da Genealogia e a forma como opera, para que posteriormente, se desenhasse e moldasse toda uma aplicação às necessidades do utilizador. No entanto, a aplicação não se centra apenas em permitir ao utilizador efectuar uma gestão, recorrendo a um sistema de gestão de bases de dados MySQL e permitir a análise genealógica "tradicional" em programas como o Personal Ancestral File. Pretende-se sobretudo, que o utilizador faça uso e responda às perguntas "do presente" esperando que a própria aplicação sirva de motivação para novas perguntas, com a integração da tecnologia XML e do Sistema de Informação Geográfico, Google Earth, permitindo assim a análise de informação genealógica no mapa-mundo. ABSTRACT: The choice of this essay's work subject is set on the need to accomplish determinate goals related with the Genealogy of the network lnquisition Commissioners on behalf of the project FCOMP-01-0124-FEDER-007360 members - Inquirir da Honra: Comissários do Santo Ofício e das Ordens Militares em Portugal (1570 - 1773)- To Inquire Honor: Inquisition Commissioners and the Military Orders in Portugal. The manual work system used till now presented a considerable amount of complex information, describing in detail characteristics not only of individuals but also of what is associated to it, including whoandhow. The main goal aimed at thus responding to: «How could it be possible to select and examine all the genealogical data registered on paper and allow it to be analyzed on computer, by means of technology that on one hand are efficient and on other hand easy to learn by its users? ». ln order to get to the answer to that matter, it was necessary to acknowledge firstly the Genealogy's universe so afterwards it could be possible to outline and shape an entire application to user needs. Nevertheless, the application does not only focus on allowing the user to carry out the system’s management, using MySQL database management system and allowing the "traditional" genealogical management in programs such as the Personal Ancestral File. Above all the user should get involved with it and answer the key questions of 'the present’ hoping that the application serves by itself as motivation to arouse new questions with the integration of XML technology and Geographic Information System, Google Earth, thus allowing the analysis of genealogical information worldwide.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Knowledge has been recognised as an important organisational asset that increases in value when shared; the opposite to other organisational assets which decrease in value during their exploitation. Effective knowledge transfer in organisations helps to achieve and maintain competitive advantage and ultimately organisational success. So far, the research on knowledge transfer has focused on traditional (functional) organisations. Only recently has attention been directed towards knowledge transfer in projects. Existing research on project learning has recognised the need for knowledge transfer within and across projects in project-based organisations (PBOs). Most projects can provide valuable new knowledge from unexpected actions, approaches or problems experienced during the project phases. The aim of this paper is to demonstrate the impact of unique projects characteristics on knowledge transfer in PBO. This is accomplished through review of the literature and a series of interviews with senior project practitioners. The interviews complement the findings from the literature. Knowledge transfer in projects occurs by social communication and transfer of lessons learned where project management offices (PMOs) and project managers play significant roles in enhancing knowledge transfer and communication within the PBO and across projects. They act as connectors between projects and the PBO ‘hub’. Moreover, some project management processes naturally facilitate knowledge transfer across projects. On the other hand, PBOs face communication challenges due to unique and temporary characteristics of projects. The distance between projects and the lack or weakness of formal links across projects, create communication problems that impede knowledge transfer across projects. The main contribution of this paper is to demonstrate that both social communication and explicit informational channels play important role in inter-project knowledge transfer. Interviews also revealed the important role organisational culture play in knowledge transfer in PBOs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.