924 resultados para change project


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Reviews

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose - The purpose of this paper is to document the outcome of a global three-year long supply chain improvement initiative at a multi-national producer of branded sporting goods that is transforming from a holding structure to an integrated company. The case company is comprised of seven internationally well-known sport brands, which form a diverse set of independent sub-cases, on which the same supply chain metrics and change project approach was applied to improve supply chain performance. Design/methodology/approach - By using in-depth case study and statistical analysis the paper analyzes across the brands how supply chain complexity (SKU count), supply chain type (make or buy) and seasonality affect completeness and punctuality of deliveries, and inventory as the change project progresses. Findings - Results show that reduction in supply chain complexity improves delivery performance, but has no impact on inventory. Supply chain type has no impact on service level, but brands with in-house production are better in improving inventory than those with outsourced production. Non-seasonal business units improve service faster than seasonal ones, yet there is no impact on inventory. Research limitations/implications - The longitudinal data used for the analysis is biased with the general business trend, yet the rich data from different cases and three-years of data collection enables generalizations to a certain level. Practical implications - The in-depth case study serves as an example for other companies on how to initiate a supply chain improvement project across business units with tangible results. Originality/value - The seven sub-cases with their different characteristics on which the same improvement initiative was applied sets a unique ground for longitudinal analysis to study supply chain complexity, type and seasonality.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Tutkimuksen tavoitteena on identifioida yleisimmät toimintolaskennan implementointiin liittyvät ongelmat ja muutosprojektin onnistumiseen vaikuttavat tekijät. Tavoitteena on myös saada kokonaisvaltainen kuva siitä, miksi laskentatoimen muutokset ovat vaikeita implementoida ja miten ihmisten käyttäytyminen vaikuttaa muutosprosessin onnistumiseen. Sekä laskentatoimen että muutosjohtamisen teorioita tarkastellaan laaja-alaisen kuvan saamiseksi siitä, miten ihmisiin ja heidän käyttäytymiseensä liittyvät tekijät vaikuttavat muutosprojektin onnistumiseen tai epäonnistumiseen. Tutkielma käyttää empiirisiä tutkimustuloksia pohjana aiheen tarkastelulle. Tutkielma tarjoaa ehdotuksia tulevaisuuden tutkimukselle liittyen laskentatoimen muutoksen kriittisiin tekijöihin. Kiinnostavimpia alueita tulevaisuuden tutkimukselle on pohtia tarkemmin, miten työntekijöiden oletukset johtajien motiiveista muutoksen takana vaikuttavat muutosvastarintaan sekä miten organisaation rakenne ja muutosvastarintavaikuttavat muutoksen institutionaalistamiseen.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The objective of this study and paper was to find out how the strategic change management readiness in organizations can be evaluated. Based on theory and prior CMP model, the framework of strategic change management and issues related to it was constructed. Additionally a synthesis of the most important phases and interventions in strategic change process and project was created. These phases were starting point, planning, implementation and evaluation and securing phases. Qualitative approach was utilized in the empirical part of the study due to the need for in-depth information about the topics surveyed through semi-structured interview. There were 18 responders from the top management of large Finnish companies. In this study interventions, strengths and weaknesses during the various phases of strategic change projects were revealed. Additionally the interviewees’ opinion on the importance of each of the interventions in strategic change project success was asked. According to this study, the most important phases recognized through researching theoretical literature, prior CMP model and empirical information in starting point phase were analysis of current and desired state and need for change accompanied with guiding coalition formulation. In planning phase the most important interventions were project organization formulation, action plan creation, analysis of prior and current strategic change projects and organizational structure analysis. In the change project implementation phase the interventions of importance were launch, quick wins, sense of urgency creation, change resistance management and change communications. In the final evaluation and securing phase project evaluation was the most important intervention. Based on the results a tool for creating change management readiness profile was created.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This report forms part of a larger research programme on 'Reinterpreting the Urban-Rural Continuum', which conceptualises and investigates current knowledge and research gaps concerning 'the role that ecosystems services play in the livelihoods of the poor in regions undergoing rapid change'. The report aims to conduct a baseline appraisal of water-dependant ecosystem services, the roles they play within desakota livelihood systems and their potential sensitivity to climate change. The appraisal is conducted at three spatial scales: global, regional (four consortia areas), and meso scale (case studies within the four regions). At all three scales of analysis water resources form the interweaving theme because water provides a vital provisioning service for people, supports all other ecosystem processes and because water resources are forecast to be severely affected under climate change scenarios. This report, combined with an Endnote library of over 1100 scientific papers, provides an annotated bibliography of water-dependant ecosystem services, the roles they play within desakota livelihood systems and their potential sensitivity to climate change. After an introductory, section, Section 2 of the report defines water-related ecosystem services and how these are affected by human activities. Current knowledge and research gaps are then explored in relation to global scale climate and related hydrological changes (e.g. floods, droughts, flow regimes) (section 3). The report then discusses the impacts of climate changes on the ESPA regions, emphasising potential responses of biomes to the combined effects of climate change and human activities (particularly land use and management), and how these effects coupled with water store and flow regime manipulation by humans may affect the functioning of catchments and their ecosystem services (section 4). Finally, at the meso-scale, case studies are presented from within the ESPA regions to illustrate the close coupling of human activities and catchment performance in the context of environmental change (section 5). At the end of each section, research needs are identified and justified. These research needs are then amalgamated in section 6.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The global marketplace is rapidly intensifying. Longer product sales lives, greater profit margins or simply survival, is dependent on management¿s ability to create and lead change. Project Management has become an important competency, combined with other business practices to adapt to the trend of changing conditions. Critical Chain is a relatively new project methodology, elaborated by Eliyahu Goldratt in order to complete projects faster, make more efficient use of resources and securing the project deliverables. The methodology is based on the assumption that traditional project techniques such as CPM and PERT, do not recognize critical human behavior. The methodology claims that many project failures are a direct result of how safety is built into the task delivery times, and then wasted by human behavior such as Student Syndrome, Parkinson Law and Multitasking. However, there has been little or no previous research regarding this topic in the Argentine marketplace. This study intended to investigate to what extent the human behavior concepts of critical chain project management are present, by performing in-depth interviews with Argentine project stakeholders. It appears that the four human behavior concepts are present in Argentina and that the majority of Argentine companies are yet to apply project management techniques.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Increasingly managers in the public sector are being required to manage change, but many of the models of change which are available to them have been developed from private sector experience. There is a need to understand more about how the change process unfolds in the public sector. A case study of change in one local authority over the period 1974-87 is provided. The events surrounding housing decentralisation and the introduction of community development are considered in detail. To understand these events a twofold model of change is proposed: a short wave model which explains a change project or event; and a long wave model which considers how these projects or events might be linked together to provide a picture of an organisation over a longer period. The short wave model identifies multiple triggers of change and signals the importance of mediators in recognising these triggers. The extent to which new ideas are implemented and the pace of their adoption is influenced by the balance of power within the organisation and the political tactics which are used. Broad phases in the change process can be identified, but there is not a simple linear passage through these. The long wave model considers the way in which continuity and change feed off one another. It suggests that periods of relative stability may be interspersed with more radical transformations as the dominant paradigm guiding the organisation shifts. However, such paradigmatic shifts in local government may be less obvious than in the private sector due to the diverse nature of the former.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Työn tavoitteena oli kuvata Ama-Prom Oy:n erään tuoteryhmän tilaustoimitusketjun nykyprosessi ja etsiä menetelmiä, kuinka prosessi tehostetaan. Prosessin tehokkuutta tutkittiin asiakastyytyväisyyskyselyn avulla, haastattelemalla prosessissa työskenteleviä henkilöitä ja tutkimalla prosessin läpimenoaikaa. Kun nykyprosessi saatiin määriteltyä, selvitettiin kuinka kyseisestä prosessista voitaisiin karsia ylimääräistä työtä pois. Haastattelujen avulla ja seinätaulutekniikaa hyväksikäyttäen etsittiin nykyprosessista ongelmakohdat ja muodostettiin tilaus- toimitusketjulle tavoitemalli. Tavoiteprosessiin pääsemiseksi on Ama-Prom Oy:ssa tapahduttava työmenetelmienmuutos. Muutoksen aikaansaamiseksi luotiin muutokselle läpivientimalli. Läpivientimallin pohjalta määriteltiin projekti, jossa määrättiin toimenpiteet uusiin työmenetelmiin pääsemiseksi. Työssä käsiteltiin teoriapuolella prosessiajattelun teoriaa ja ajan merkitystä toimitusketjuissa. Prosessijohtamisen jälkeen käsiteltiin muutoksenhallintaa ja muutosjohtamista. Synteesiosassa tarkasteltiin Ama-Prom Oy muutoksen tarvettaja ja tarjottiin menetelmäehdotuksia, joilla tilaus- toimitusprosessia voidaan tehostaa. Lopuksi määriteltiin muutosprojekti menetelmien muuttamiseksi.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Tämän tapaustutkimuksen päätavoitteina on luoda toimintolaskentamalli kohdeyritykselle ja testata toimintolaskennan soveltuvuutta pilottiprojektilla, joka toteutetaan vain pienelle osalle tuotteista. Toimintolaskentaprojektin tavoitteena on tarkentaa tuotteiden kustannuslaskentaa ja näin tukea yrityksen päätöksentekoa tuotehallinnan päätöksissä. Tutkimuksen tuloksena pilottiprojekti on vahvistanut ennakkokäsityksiä laskentakohteina olleiden tuotteiden osalta. Implementointiprosesseilla on sekä inhimillisiä että teknisiä ongelmia. Resurssikustannusten kohdistaminen asetettiin projektin tärkeimmäksi tekniseksi ongelmaksi. Pilottiprojekti keskittyy lähinnä laskennan tekniseen toteutukseen, mutta kattavampi muutosprojekti vaatii muutosjohtajuutta ja keskittymistä inhimillisiin tekijöihin. Pilottivaiheessa tärkein inhimillinen ongelma on saavuttaa johdon tuki ja osallistuminen projektiin. Toimintolaskentaprojekti onnistui kohdeyrityksessä hyvin ja johdon tuki onnistuttiin saavuttamaan. Tutkimuksen tuloksena nähdään toimintolas-kennan hyödyttävän tuotehallintaa ja tutkimuksen seurauksena toimintolaskentaprojektia jatketaan kattamaan koko tuotevalikoima. Yrityksessä havaittiin laskentaprojektin aikana myös toiminnan kehityskohteita, jotka vaativat tarkempaa tarkastelua toimintoanalyysin avulla.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Uuden tietojärjestelmän hankinta on paitsi tekninen myös sosiaalinen muutos. Tieteelliset teoriat sekä tutkimukset osoittavat, että uuden tietojärjestelmän onnistunut käyttöönotto edellyttää sosioteknistä systeemiajattelua muutoksen läpivientiin. Tämän tutkimuksen tavoitteena oli osallistua yhteiskunnalliseen keskusteluun muutosjohtamisen tärkeydestä otettaessa käyttöön uutta teknologiaa sekä tutkia Case-yrityksen ERP-projektin muutosjohtamisen onnistumista. Tutkimuksen konteksti koostuu sosioteknisestä muutoksesta, jossa muutosjohtaminen nousee keskiöön. Tutkimuksessa kartoitettiin uuden ERP-järjestelmän käyttöönoton onnistumisen kannalta keskeiset muutosjohtamisen elementit: muutostarve, projektitiimi, visio ja tavoitteet, viestintä, koulutus, osallistaminen, sitouttaminen, johdon ja projektiryhmän tuki sekä muutoksen arviointi ja vakiinnuttaminen. Tutkimuksen empiirisessä osassa arvioitiin Case-yrityksen ERP-projektin muutosjohtamista henkilöstön näkökulmasta. Tutkimus toteutettiin laadullisena tapaustutkimuksena, jossa pääasiallisena aineistonkeruumenetelmänä käytettiin sähköistä puolistrukturoitua kyselylomaketta. Tulosten analysoinnin perusteella Case-yrityksen ERP-järjestelmän käyttöönotto sujui tyydyttävästi.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

La construcción es una de las industrias que mayores accidentes laborales genera, en esta investigación se realizó un análisis retrospectivo para determinar si existe alguna relación entre la ocurrencia de accidentes y la fecha de entrega de una meta, debido al incremento en la cantidad de trabajo expresado por la cantidad de días y horas extras trabajados, se cuenta con información de la accidentalidad de cinco empresas constructoras de un gran proyecto vial en Colombia en los años de 2012 y 2013. Se analizó la información correspondiente a la nómina de las mismas empresas, con el valor de la nómina mensual, el valor de las incapacidades mensuales y la cantidad de trabajadores por cada empresa en cada periodo. El manejo de los datos se hizo con EXCEL y el análisis estadístico con STATA 11.1, se usó la correlación de Spearman para encontrar la relación entre la cantidad de accidentes acumulados y: la cantidad acumulada de días trabajados en cada mes, la cantidad acumulada de horas extras trabajadas mensualmente y el costo acumulado en porcentaje de la nómina mensual, encontrándose en todos los casos una relación lineal. Por otra parte, se realizó una prueba binomial para establecer la relación de la fecha de entrega de la meta con la accidentalidad 30 días antes y después, encontrando que la accidentalidad aumenta en la proximidad previa a la entrega de la meta