952 resultados para Performance Rating System


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Federal Highway Administration, Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This Thesis reports on the principles and usefulness of Performance Rating as developed by the writer over a number of years. In Part one a brief analysis is made of the Quality scene and its development up to the present. The need is exposed for Performance Rating as a tool for all areas of management*. At the same time a system of Quality Control is described which the writer has further developed under the title of 'Operator Control'. This system is based on the integration of all Quality control functions with the creative functions required for Quality achievement. The discussions are mainly focussed on the general philosophy of Quality, its creation and control and that part of Operator Control which affects Performance Rating. Whereas it is shown that the combination of Operator Control and Performance Rating is both economically and technically advantageous, Performance Rating can also usefully be applied under inspection control conditions. Part two describes the principles of Area Performance Rating. *The need for, and the advantages of, Performance Rating are particularly demonstrated in Case study No.1. From this a summation expression is derived which gives the key for grouping of areas with similar Performance Rating (P). A model is devised on which the theory is demonstrated. Relevant case studies, carried out in practice in factories are quoted in Part two, Chapter 4, one written by the Quality manager of that particular factory. Particular stress is laid in the final conclusions on management's function in the Quality field and how greatly this function is eased and improved through the introduction of Area Performance Rating.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The leaders` organizations of several different sectors have as characteristic to measure their own performance in a systematic way. However, this concept is still unusual in agricultural enterprises, including the mechanization sector. Mechanization has an important role on the production costs and to know its performance is a key factor for the agricultural enterprise success. This work was generated by the importance that measurement of performance has for the management and the mechanization impact on the production costs. Its aim is to propose an integrated performance measurement system to give support to agricultural management. The methodology was divided in two steps: adjustment of a conceptual model based on Balanced Score Card - BSC; application of the model in a study case at sugar cane mill. The adjustment and the application of the conceptual model allowed to obtain the performance index in a systematic way, that are associated to: costs and deadline ( traditionally used); control and improvement on the quality of operations and support process; environmental preservation; safety; health; employees satisfaction; development of information systems. The adjusted model helped the development of the performance measurement system for the mechanized management systems and the index allows an integrated view of the enterprise, related to its strategic objectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A foliar rating system was developed to assess the progress of Fusarium wilt ( Panama disease) caused by Fusarium oxysporum f. sp. cubense in seven banana cultivars differing in their resistance to race 1 of the pathogen. Plantlets were transplanted into unamended soil naturally infested with the pathogen, soil amended with urea and soil amended with aged chicken manure. A corm invasion score was also developed to assess the accuracy of the foliar symptom score as an indicator of cultivar resistance. On the basis of foliar symptom scores alone, the response of five of the seven cultivars in the chicken manure treatment corresponded to their known field response. However, the response of the other two cultivars, both susceptible to the pathogen in the field, fell into two categories. One had a high foliar symptom score and a correspondingly high corm invasion score, whereas the other had a low foliar symptom score and a high corm invasion score. Breeders need to be aware of the two categories of susceptible response, if inferior breeding material is to be rejected early on in a breeding program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In any business it is very important to measure the performance and it helps to select key information to make better decisions on time. This research focuses on the design and implementation of a performance measurement system in a Portuguese medium size firm operating in the specialized health care transformation vehicles industry. From the evidence that outputs from Auto Ribeiro’s current information system is misaligned with the company’s objectives and strategy, this research tries to solve this business problem through the development of a Balanced Scorecard analysis, although there are some issues, which deserve further development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

County engineers in Iowa face the dual problems of rapidly escalating costs and a decreasing rate of growth of revenues. Various priority systems are in use, ranking projects for inclusion in road improvement programs, but they generally have weaknesses when used to compare one project with another in a different location. The sufficiency rating system has proven to be a useful tool in developing a priority list of projects for primary road systems, but there are none currently in use for secondary road systems. The research reported here was undertaken to develop a sufficiency rating system which could be used for secondary roads in Iowa and to produce the necessary forms and instructions to aid county engineering personnel in their efforts to complete the ratings for roads within their county.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The goal of this study is to develop a usable sufficiency rating system for secondary roads. There are several assumptions that have been made at the outset. These are: 1. County engineers currently use at least a limited set of decision criteria to make decisions regarding project priorities. 2. Some degree of consensus exists among the county engineers in terms of which are the most important criteria and that there is some agreement on their relative importance. Accordingly, a questionnaire was developed which could be used as a survey tool. The results of the survey were used to develop a final list of weighted rating elements which were used as part of the proposed sufficiency rating system. State and local jurisdictions from other states were also surveyed to determine the status of the use of sufficiency rating systems for secondary roads outside of Iowa and to gather some applicable data.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis was produced for the Technology Marketing unit at the Nokia Research Center. Technology marketing was a new function at Nokia Research Center, and needed an established framework with the capacity to take into account multiple aspects for measuring the team performance. Technology marketing functions had existed in other parts of Nokia, yet no single method had been agreed upon for measuring their performance. The purpose of this study was to develop a performance measurement system for Nokia Research Center Technology Marketing. The target was that Nokia Research Center Technology Marketing had a framework for separate metrics; including benchmarking for starting level and target values in the future planning (numeric values were kept confidential within the company). As a result of this research, the Balanced Scorecard model of Kaplan and Norton, was chosen for the performance measurement system for Nokia Research Center Technology Marketing. This research selected the indicators, which were utilized in the chosen performance measurement system. Furthermore, performance measurement system was defined to guide the Head of Marketing in managing Nokia Research Center Technology Marketing team. During the research process the team mission, vision, strategy and critical success factors were outlined.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this study is to create measurement system that is capable to measure performance in basic industry’s service centers. First it is examined what is performance and how it can be measured. The study also introduces commonly known measurement frameworks. After theory the study investigates how companies in the field of basic industry measure their operations in practise. The investigation is done examining three case examples and by analyzing survey results from basic industry companies. On the survey results focus is on what meters and measurement systems companies use. It is also viewed what measurement problems companies have faced. In the applied part of the study harmonized performance measurement system is created. The framework of the measurement system is introduced and measurement system for the target company is created. The target company felt that the harmonized performance measurement system has good potential and continues to develop it further.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main objective of this research is creating a performance measurement system for accounting services of a large paper industry company. In this thesis there are compared different performance measurement system and then selected two systems, which are presented and compared more detailed. Performance Prism system is the used framework in this research. Performance Prism using success maps to determining objectives. Model‟s target areas are divided into five groups: stakeholder satisfaction, stakeholder contribution, strategy, processes and capabilities. The measurement system creation began by identifying stakeholders and defining their objectives. Based on the objectives are created success map. Measures are created based on the objectives and success map. Then is defined needed data for measures. In the final measurement system, there are total just over 40 measures. Each measure is defined specific target level and ownership. Number of measures is fairly large, but this is the first version of the measurement system, so the amount is acceptable.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of the study is to determine general features of the supply chain performance management system, to assess the current state of performance management in the case company mills and to make proposals for improvement – how the future state of performance management system would look like. The study covers four phases which consist of theory and case company parts. Theoretical review gives understanding about performance management and measurement. Current state analysis assesses the current state of performance management in the mills. Results and proposals for improvement are derived from current state analysis and finally the conclusions with answers to research questions are presented. Supply chain performance management system consists of five areas: perfor-mance measurement and metrics, action plans, performance tracking, performance dialogue and rewards, consequences and actions. The result of the study revealed that all mills were quite average level in performance management and there is a room for improvement. Created performance improvement matrix served as a tool in assessing current performance management and could work also as a tool in the future in mapping the current state after transformation process. Limited harmonization was revealed as there were different ways to work and manage performance in the mills. Lots of good ideas existed though actions are needed to make a progress. There is also need to harmonize KPI structure.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This Master’s Thesis studies performance management system and its benefits, risks and costs. Objective of the thesis is to describe and evaluate currently used supply chain performance management system (SCPMS) in a Finnish paper mill and its interfaces with its business unit’s SCPMS. As a result, the host company has improvement road map for improving its SCPMS. Used SCPMS in the host company and its interfaces to business unit’s SCPMS are described based on interviews held in the host company and the business unit. Evaluation of the host company’s SCPMS is based on literature study. For improvement road map, three areas in need of improvements are chosen. The study shows the need of high level top management commitment in successful performance management system implementation and usage, especially when the system is deployed to lower levels in the organization.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The performance measurement produces information about the operation of the business process. On the basis of this information performance of the company can be followed and improved. Balanced performance measurement system can monitor performance of several perspectives and business processes can be led according to company strategy. Major part of the costs of a company is originated from purchased goods or services are an output of the buying process emphasising the importance of a reliable performance measurement of purchasing process. In the study, theory of balanced performance measurement is orientated and framework of purchasing process performance measurement system is designed. The designed balanced performance measurement system of purchasing process is tested in case company paying attention to the available data and to other environmental enablers. The balanced purchasing performance measurement system is tested and improved during the test period and attention is paid to the definition and scaling of objectives. Found development initiatives are carried out especially in the scaling of indicators. Finally results of the study are evaluated, conclusions and additional research areas proposed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis examines how content marketing is used in B2B customer acquisition and how content marketing performance measurement system is built and utilized in this context. Literature related to performance measurement, branding and buyer behavior is examined in the theoretical part in order to identify the elements influence on content marketing performance measurement design and usage. Qualitative case study is chosen in order to gain deep understanding of the phenomenon studied. The case company is a Finnish software vendor, which operates in B2B markets and has practiced content marketing for approximately two years. The in-depth interviews were conducted with three employees from marketing department. According to findings content marketing performance measurement system’s infrastructure is based on target market’s decision making processes, company’s own customer acquisition process, marketing automation tool and analytics solutions. The main roles of content marketing performance measurement system are measuring performance, strategy management and learning and improvement. Content marketing objectives in the context of customer acquisition are enhancing brand awareness, influencing brand attitude and lead generation. Both non-financial and financial outcomes are assessed by single phase specific metrics, phase specific overall KPIs and ratings related to lead’s involvement.