932 resultados para Optimum operations
Resumo:
Purpose The purpose of this paper is to provide a case study of two organisations working in evacuation centres which overcame challenges to develop a constructive relationship, resulting in improved outcomes for disaster-affected people. A wide range of services for disaster-affected communities are provided as part of emergency sheltering. Collaboration between agencies providing services is essential, but sometimes challenging. Design/methodology/approach A wide range of services for disaster-affected communities are provided as part of emergency sheltering. Collaboration between agencies providing services is essential, but sometimes challenging. The purpose of this paper is to provide a case study of two organisations working in evacuation centres which overcame challenges to develop a constructive relationship, resulting in improved outcomes for disaster-affected people. Findings The Preferred Sheltering Practices provides an ongoing anchor for Australian Red Cross and Environmental Health Australia (EHA) (Queensland) Inc.’s relationship and has led to other tangible benefits such as involvement in each other’s events and trainings. The relationship has become embedded in each organisation’s day-to-day business ensuring the relationship’s sustainability beyond individual staff movements. Originality/value This case study provides an example of how collaboration can be achieved between two organisations with seemingly different mandates to improve the response for disaster-affected communities.
Resumo:
This paper proposes a new multi-resource multi-stage scheduling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints have been considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times of equipment; equipment-assignment-dependent operation times of blocks; distances between each pair of blocks; due windows of blocks; material properties of blocks; swell factors of blocks; and slope requirements of blocks. It is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level. The model also provides an intelligent decision support tool to account for the availability and usage of equipment units for drilling, blasting and excavating stages.
Resumo:
Clear-fell harvest of forest concerns many wildlife biologists because of loss of vital resources such as roosts or nests, and effects on population viability. However, actual impact has not been quantified. Using New Zealand long-tailed bats (Chalinolobus tuberculatus) as a model species we investigated impacts of clear-fell logging on bats in plantation forest. C. tuberculatus roost within the oldest stands in plantation forest so it was likely roost availability would decrease as harvest operations occurred. We predicted that post-harvest: (1) roosting range sizes would be smaller, (2) fewer roosts would be used, and (3) colony size would be smaller. We captured and radiotracked C. tuberculatus to day-roosts in Kinleith Forest, an exotic plantation forest, over three southern hemisphere summers (Season 1 October 2006–March 2007; Season 2 November 2007–March 2008; and Season 3 November 2008–March 2009). Individual roosting ranges (100% MCPs) post harvest were smaller than those in areas that had not been harvested, and declined in area during the 3 years. Following harvest, bats used fewer roosts than those in areas that had not been harvested. Over 3 years 20.7% of known roosts were lost: 14.5% due to forestry operations and 6.2% due to natural tree fall. Median colony size was 4.0 bats (IQR = 2.0–8.0) and declined during the study, probably because of locally high levels of roost loss. Post harvest colonies were smaller than colonies in areas that had not been harvested. Together, these results suggest the impact of clear-fell harvest on long-tailed bat populations is negative.
Resumo:
This chapter discussed the various modes of operation of the Doubly Fed Induction Generator (DFIG) based wind farm system. The impact of a auxiliary damping controller on the different modes of operation for the DFIG based wind generation system is investigated. The co-ordinated tuning of the damping controller to enhance the damping of the oscillatory modes using Bacteria Foraging (BF) technique is presented. The results from eigenvalue analysis are presented to elucidate the effectiveness of the tuned damping controller in the DFIG system under Super/Sub-synchronous speed of operation. The robustness issue of the damping controller is also investigated.
Resumo:
Hot metal carriers (HMCs) are large forklift-type vehicles used to move molten metal in aluminum smelters. This paper reports on field experiments that demonstrate that HMCs can operate autonomously and in particular can use vision as a primary sensor to locate the load of aluminum. We present our complete system but focus on the vision system elements and also detail experiments demonstrating reliable operation of the materials handling task. Two key experiments are described, lasting 2 and 5 h, in which the HMC traveled 15 km in total and handled the load 80 times.
Resumo:
A crucial issue with hybrid quantum secret sharing schemes is the amount of data that is allocated to the participants. The smaller the amount of allocated data, the better the performance of a scheme. Moreover, quantum data is very hard and expensive to deal with, therefore, it is desirable to use as little quantum data as possible. To achieve this goal, we first construct extended unitary operations by the tensor product of n, n ≥ 2, basic unitary operations, and then by using those extended operations, we design two quantum secret sharing schemes. The resulting dual compressible hybrid quantum secret sharing schemes, in which classical data play a complementary role to quantum data, range from threshold to access structure. Compared with the existing hybrid quantum secret sharing schemes, our proposed schemes not only reduce the number of quantum participants, but also the number of particles and the size of classical shares. To be exact, the number of particles that are used to carry quantum data is reduced to 1 while the size of classical secret shares also is also reduced to l−2 m−1 based on ((m+1, n′)) threshold and to l−2 r2 (where r2 is the number of maximal unqualified sets) based on adversary structure. Consequently, our proposed schemes can greatly reduce the cost and difficulty of generating and storing EPR pairs and lower the risk of transmitting encoded particles.
Resumo:
This document has arisen from a request from BM Alliance Coal Operations Pty Ltd, to undertake and report on the key findings and statistics, key learning’s and recommendations for fatigue related incidents that have occurred at various BM Alliance coal operation mines in Queensland.
Resumo:
There is an increasing awareness of sustainability and climate change and its impact on infrastructure and engineering asset management in design, construction, and operations. Sustainability rating tools have been proposed and/or developed that provide ratings of infrastructure projects in differing phases of their life cycle on sustainability. This paper provides an overview of decision support systems using sustainability rating framework that can be used to prioritize or select tasks and activities within projects to enhance levels of sustainability outcomes. These systems can also be used to prioritize projects within an organization to optimize sustainability outcomes within an allocated budget.
Optimum position of steel outrigger system for high rise composite buildings subjected to wind loads
Resumo:
The responses of composite buildings under wind loads clearly become more critical as the building becomes taller, less stiff and more lightweight. When the composite building increases in height, the stiffness of the structure becomes more important factor and introduction to belt truss and outrigger system is often used to provide sufficient lateral stiffness to the structure. Most of the research works to date is limited to reinforced concrete building with outrigger system of concrete structure, simple building plan layout, single height of a building, one direction wind and single level of outrigger arrangement. There is a scarcity in research works about the effective position of outrigger level on composite buildings under lateral wind loadings when the building plan layout, height and outrigger arrangement are varied. The aim of this paper is to determine the optimum location of steel belt and outrigger systems by using different arrangement of single and double level outrigger for different size, shape and height of composite building. In this study a comprehensive finite element modelling of composite building prototypes is carried out, with three different layouts (Rectangular, Octagonal and L shaped) and for three different storey (28, 42 and 57-storey). Models are analysed for dynamic cyclonic wind loads with various combination of steel belt and outrigger bracings. It is concluded that the effectiveness of the single and double level steel belt and outrigger bracing are varied based on their positions for different size, shape and height of composite building.
Resumo:
This paper proposes a new multi-resource multi-stage mine production timetabling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints are considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times; equipment-assignment-dependent operational times; etc. The model also provides the availability and usage of equipment units at multiple operational stages such as drilling, blasting and excavating stages. The problem is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level.
Resumo:
Mixed integer programming and parallel-machine job shop scheduling are used to solve the sugarcane rail transport scheduling problem. Constructive heuristics and metaheuristics were developed to produce a more efficient scheduling system and so reduce operating costs. The solutions were tested on small and large size problems. High-quality solutions and improved CPU time are the result of developing new hybrid techniques which consist of different ways of integrating simulated annealing and Tabu search techniques.