Hybrid metaheuristic techniques for optimising sugarcane rail operations


Autoria(s): Masoud, Mahmoud; Kozan, Erhan; Kent, Geoff
Data(s)

2015

Resumo

Mixed integer programming and parallel-machine job shop scheduling are used to solve the sugarcane rail transport scheduling problem. Constructive heuristics and metaheuristics were developed to produce a more efficient scheduling system and so reduce operating costs. The solutions were tested on small and large size problems. High-quality solutions and improved CPU time are the result of developing new hybrid techniques which consist of different ways of integrating simulated annealing and Tabu search techniques.

Identificador

http://eprints.qut.edu.au/88854/

Publicador

Taylor and Francis

Relação

DOI:10.1080/00207543.2014.957870

Masoud, Mahmoud, Kozan, Erhan, & Kent, Geoff (2015) Hybrid metaheuristic techniques for optimising sugarcane rail operations. International Journal of Production Research, 53(9), pp. 2569-2589.

Fonte

School of Mathematical Sciences; Science & Engineering Faculty

Palavras-Chave #Scheduling, Sugarcane, Railways, Metaheuristics
Tipo

Journal Article