Hybrid metaheuristic techniques for optimising sugarcane rail operations
Data(s) |
2015
|
---|---|
Resumo |
Mixed integer programming and parallel-machine job shop scheduling are used to solve the sugarcane rail transport scheduling problem. Constructive heuristics and metaheuristics were developed to produce a more efficient scheduling system and so reduce operating costs. The solutions were tested on small and large size problems. High-quality solutions and improved CPU time are the result of developing new hybrid techniques which consist of different ways of integrating simulated annealing and Tabu search techniques. |
Identificador | |
Publicador |
Taylor and Francis |
Relação |
DOI:10.1080/00207543.2014.957870 Masoud, Mahmoud, Kozan, Erhan, & Kent, Geoff (2015) Hybrid metaheuristic techniques for optimising sugarcane rail operations. International Journal of Production Research, 53(9), pp. 2569-2589. |
Fonte |
School of Mathematical Sciences; Science & Engineering Faculty |
Palavras-Chave | #Scheduling, Sugarcane, Railways, Metaheuristics |
Tipo |
Journal Article |