A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operations
Data(s) |
25/09/2015
|
---|---|
Resumo |
This paper proposes a new multi-resource multi-stage mine production timetabling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints are considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times; equipment-assignment-dependent operational times; etc. The model also provides the availability and usage of equipment units at multiple operational stages such as drilling, blasting and excavating stages. The problem is formulated by mixed integer programming and solved by ILOG-CPLEX optimiser. The proposed model is validated with extensive computational experiments to improve mine production efficiency at the operational level. |
Formato |
application/pdf |
Identificador | |
Publicador |
W.S. Maney & Son Ltd |
Relação |
http://eprints.qut.edu.au/87826/1/Kozan%20and%20Liu_MNT%20paper_Final.pdf DOI:10.1179/1743286315Y.0000000031 Kozan, Erhan & Liu, Shi Qiang (2015) A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operations. Mining Technology. (In Press) CRC ORE/322230-1011/54 |
Direitos |
Copyright 2015 The Australasian Institute of Mining and Metallurgy W.S. Maney & Son Ltd published on behalf of the Institute of Materials, Minerals and Mining and Australasian Institute of Mining and Metallurgy |
Fonte |
School of Mathematical Sciences; Science & Engineering Faculty |
Palavras-Chave | #010206 Operations Research #091405 Mining Engineering #Mine production timetabling #Multi-resource multi-stage scheduling #Open-pit mines #Mixed integer programming |
Tipo |
Journal Article |