997 resultados para project formulation
Resumo:
Scrum is an agile project management approach that has been widely practiced in the software development projects. It has proven to increase quality, productivity, customer satisfaction, transparency and team morale among other benefits from its implementation. The concept of scrum is based on the concepts of incremental innovation strategies, lean manufacturing, kaizen, iterative development and so on and is usually contrasted with the linear development models such as the waterfall method in the software industry. The traditional approaches to project management such as the waterfall method imply intensive upfront planning and approval of the entire project. These sort of approaches work well in the well-defined stable environments where all the specifications of the project are known in the beginning. However, in the uncertain environments when a project requires continuous development and incorporation of new requirements, they do not tend to work well. The scrum framework was inspiraed by Nonaka’s article about new product developement and was later adopted by software development practitioners. This research explores conditions for and benefits of the application of scrum framework beyond software development projects. There are currently a few case studies on the scrum implementation in non-software projects, but there is a noticeable trend of it in the scrum practitioners’ community. The research is based on the real-life context multiple case study analysis of three different non-software projects. The results of the research showed that in order to succeed within scrum projects need to satisfy certain conditions – necessary and sufficient. Among them the key factors are uncertainty of the project environment, not well defined outcomes, commitment of the scrum teams and management support. The top advantages of scrum implementation identified in the present research include improved transparency, accountability, team morale, communications, cooperation and collaboration. Further researches are advised to be carried out in order to validate these findings on a larger sample and to focus on more specific areas of scrum project management implementation.
Resumo:
This research focused on operation of a manpower pool within a service business unit in Company X and aimed to identify how the operation should be improved in order to get most out of it concerning the future prospects of the service business unit. This was done by analyzing the current state of the manpower pool related operations in means of project business, project management and business models. The objective was to deepen the understanding and to highlight possible areas of improvement. The research was conducted as a qualitative single-case study utilizing also an action research method; the research approach was a combination of conceptual, action-oriented and constructive approaches. The primary data was collected with executing a comprehensive literature review and semi-structured theme interviews. The main results described how the manpower pool operates as part of the service business unit in project business by participating in different types of delivery projects; process flows for the project types were mapped. Project management was analyzed especially from the resource management point of view, and an Excel-based skills analysis model was constructed for this purpose. Utilization of operational business models was also studied to define strategic direction for development activities. The results were benchmarked against two competitors in order to specify lessons to be learnt from their use of operational business models.
Resumo:
The importance of Information Technology (IT) in the business environment is continuously growing. This stimulates the increase of size, complexity and number of IT projects and raises the need for IT Project Portfolio Management (IT PPM). While being actively discussed for the last few decades, IT PPM has a short history of practical implementation. This creates inconsistency in the views of different authors and provides an opportunity for additional research. As a first step, this research explores the existing studies and brings together the views of different authors on IT PPM. As a result, a high-level IT PPM Process Cycle and a set of Key Success Factors for IT PPM are proposed. IT PPM Process Cycle gives an overview of the main elements of IT PPM process, while the set of Key Success Factors provides a number of factors that should be considered during the implementation. As a second step, both theoretical deliverables are empirically tested by a case study and a survey conducted in a big multinational company. The case study is used to analyze process framework of the studied company towards the developed IT PPM Process Cycle. Subsequently, a survey was conducted among subject matter experts of the same company to evaluate the importance and relevance of the proposed Key Success Factors. Finally, this thesis concludes with findings made during the case study and provides an empirically tested selection of factors to be taken into account. These two deliverables can be used by both academics and practitioners to close the gaps in existing literature and assist in IT PPM implementation.
Resumo:
This thesis studied the issue of interaction in industrial buyer-seller relationships. The aim of the thesis was to study the interaction from the seller’s perspective, especially from a project selling company’s perspective. The purpose of the thesis was to offer suggestions for the case company on how to improve interaction. The theoretical part of the study introduced the interaction framework of buyer-seller interaction, and the concept of interaction mechanisms. The focus was on studying the seller’s ways and means to utilize the interaction mechanisms. A case study research was conducted in the empirical part of the study, in which interaction in the case company was observed at a general level and through three different projects. The case company of the study was a project selling company. The case study data was gathered through individual interviews. Content Analysis was used as a research method for analyzing the case study data. Based on the case study findings, the results were drawn. The results indicated what should be done, in order to develop interaction in the case company. Finally, suggestions were provided for the case company on how to improve interaction, and a suggested interaction model was established for the case company. Although the thesis studied the topic from the viewpoint of only one specific company, it also offers outlook for other seller companies to improve their interaction.
Resumo:
The transition of project based manufacturing business, even more into global networks, sets up challenges for companies to manage their business in this new operating environment. One way to tackle these challenges is the successful management of product information through an extended product’s lifecycle. Thus, one objective of this research is to find ways how product information management in global project based manufacturing can be improved. Another objective is to find a solution how the target company can improve its product information management in the offer-to-procurement business process. Due to the nature of the topic, the study follows constructive research methodology with qualitative methods. By combining literature related to this topic a framework is created to improve product information management in global project based manufacturing. The improvement process in this framework is based on a systematic approach from the current state towards target state. A general aim for improvements should be the integrated product and project lifecycle information management through Lean approach. This introduced framework is applied to the target company through two case projects. Data for building view of current state and analysis is collected mostly by theme interviews and also utilizing other material from the target company. Used tools help to analyzing was the BPMN and the Trace matrix for business chains. Results of the improvement process are collected in a solution proposal which contain the strategic target state as well as long and short term objectives. The strategic target state is defined as controlled customization. Also during the improvement process are created the Information requirements chart in the offer-to-procurement business process, and the Project related initial information questionnaire to customer.
Resumo:
In the 21st century, agile project management (APM) has emerged as a major evolutionary step in the area of software project management. APM is defined as a conceptual framework, consisting of various methods such as Scrum, quick respond to change, better customer collaboration, minimum coverage of documentation and extreme programming (XP) that facilitates to produce working software in multiple iterations with team work. Because agile project management has become more popular in the software industry in recent years, it constitutes an interesting and comprehensive research topic. This thesis presents a systematic literature review (SLR) of published research articles concerning agile project management. Based on a predefined search strategy, 273 such articles were identified, of which 44 were included in the review. The selected 44 articles were published between years 2005 and 2012. The thesis defines a review process by developing a review protocol and presenting the results of the review. The results are expected to provide researchers, software man
Resumo:
The increasing use of nanotechnologies in advanced therapies has allowed the observation of specific adverse reactions related to nanostructures. The toxicity of a novel liposome formulation of meglumine antimoniate in dogs with visceral leishmaniasis after single dose has been investigated. Groups of 12 animals received by the intravenous route a single dose of liposomal meglumine antimoniate (group I [GI], 6.5 mg Sb/kg), empty liposomes (GII) or isotonic saline (GIII). Evaluation of hematological and biochemical parameters showed no significant changes 4 days after administration. No undesired effects were registered in the GIII. However, adverse reactions were observed in 67.7% of dogs from both groups that received liposomal formulations. The side effects began moments after bolus administration and disappeared during the first 15 minutes after treatment. Prostation, sialorrhea and defecation were the most frequent clinical signs, registered in 33.3% and 41.6 % of animals from the groups GI and GII, respectively. Tachypnea, mydriasis, miosis, vomiting and cyanosis were also registered in both groups. The adverse reactions observed in this study were attributed to the activation of the complement system by lipid vesicles in a phenomenon known as Complement Activation-Related Pseudoallergy (CARPA). The influence of the physical-chemical characteristics of liposomal formulation in the triggering of CARPA is discussed.
Resumo:
This work presents a new law of the wall formulation for recirculating turbulent flows. An alternative expression for the internal length which can be applied in the separated region is also presented. The formulation is implemented in a numerical code which solves the k-epsilon model through a finite volume method. The theoretical results are compared with the experimental data of Vogel and Eaton (J. of Heat Transfer, Transactions of ASME, vol.107, pp. 922-929, 1985). The paper shows that the present formulation furnishes better results than the standard k-epsilon formulation.
Resumo:
It is well known that the numerical solutions of incompressible viscous flows are of great importance in Fluid Dynamics. The graphics output capabilities of their computational codes have revolutionized the communication of ideas to the non-specialist public. In general those codes include, in their hydrodynamic features, the visualization of flow streamlines - essentially a form of contour plot showing the line patterns of the flow - and the magnitudes and orientations of their velocity vectors. However, the standard finite element formulation to compute streamlines suffers from the disadvantage of requiring the determination of boundary integrals, leading to cumbersome implementations at the construction of the finite element code. In this article, we introduce an efficient way - via an alternative variational formulation - to determine the streamlines for fluid flows, which does not need the computation of contour integrals. In order to illustrate the good performance of the alternative formulation proposed, we capture the streamlines of three viscous models: Stokes, Navier-Stokes and Viscoelastic flows.
Resumo:
Products developed at industries, institutes and research centers are expected to have high level of quality and performance, having a minimum waste, which require efficient and robust tools to numerically simulate stringent project conditions with great reliability. In this context, Computational Fluid Dynamics (CFD) plays an important role and the present work shows two numerical algorithms that are used in the CFD community to solve the Euler and Navier-Stokes equations applied to typical aerospace and aeronautical problems. Particularly, unstructured discretization of the spatial domain has gained special attention by the international community due to its ease in discretizing complex spatial domains. This work has the main objective of illustrating some advantages and disadvantages of numerical algorithms using structured and unstructured spatial discretization of the flow governing equations. Numerical methods include a finite volume formulation and the Euler and Navier-Stokes equations are applied to solve a transonic nozzle problem, a low supersonic airfoil problem and a hypersonic inlet problem. In a structured context, these problems are solved using MacCormacks implicit algorithm with Steger and Warmings flux vector splitting technique, while, in an unstructured context, Jameson and Mavriplis explicit algorithm is used. Convergence acceleration is obtained using a spatially variable time stepping procedure.
Resumo:
The mathematical model for two-dimensional unsteady sonic flow, based on the classical diffusion equation with imaginary coefficient, is presented and discussed. The main purpose is to develop a rigorous formulation in order to bring into light the correspondence between the sonic, supersonic and subsonic panel method theory. Source and doublet integrals are obtained and Laplace transformation demonstrates that, in fact, the source integral is the solution of the doublet integral equation. It is shown that the doublet-only formulation reduces to a Volterra integral equation of the first kind and a numerical method is proposed in order to solve it. To the authors' knowledge this is the first reported solution to the unsteady sonic thin airfoil problem through the use of doublet singularities. Comparisons with the source-only formulation are shown for the problem of a flat plate in combined harmonic heaving and pitching motion.
Resumo:
This paper presents an HP-Adaptive Procedure with Hierarchical formulation for the Boundary Element Method in 2-D Elasticity problems. Firstly, H, P and HP formulations are defined. Then, the hierarchical concept, which allows a substantial reduction in the dimension of equation system, is introduced. The error estimator used is based on the residual computation over each node inside an element. Finally, the HP strategy is defined and applied to two examples.
Resumo:
This paper studies the effect of time delay on the active non-linear control of dynamically loaded flexible structures. The behavior of non-linear systems under state feedback control, considering a fixed time delay for the control force, is investigated. A control method based on non-linear optimal control, using a tensorial formulation and state feedback control is used. The state equations and the control forces are expressed in polynomial form and a performance index, quadratic in both state vector and control forces, is used. General polynomial representations of the non-linear control law are obtained and implemented for control algorithms up to the fifth order. This methodology is applied to systems with quadratic and cubic non-linearities. Strongly non-linear systems are tested and the effectiveness of the control system including a delay for the application of control forces is discussed. Numerical results indicate that the adopted control algorithm can be efficient for non-linear systems, chiefly in the presence of strong non-linearities but increasing time delay reduces the efficiency of the control system. Numerical results emphasize the importance of considering time delay in the project of active structural control systems.
Resumo:
Objective of this master’s thesis is to create an investment calculation model, which makes it possible to determine if the ski resort business can be profitable. The ultimate goal is to create a description with the help of theoretical knowledge, interviews and investment calculation model, how the operation of ski resort is possible to be profitable and what are the critical success factors for achieving this goal. Thesis is carried out as qualitative research, which is supported by the necessary constructive information utilizing calculations. The client company has provided valuable insights and material for this thesis. Theoretical report examines the steps of developing a business plan, investment components and methods as well as sensitivity analysis. The theoretical part is based on the articles, textbooks, interviews and researches. The empirical part of the thesis is assembled by benchmarking other same size Finnish ski resorts, conducting interviews and using investment calculation model. The empirical part provides comprehensive information about ski resort industry, the future of the project, the business plan and the profitability calculations. As the result of this thesis the investment calculation model, which makes it possible to simulate different scenarios for ski resort project, was formed. The model was used to create a picture in which kind of scenario the ski resort business would be profitable and what are the critical success factors in achieving this aim.
Resumo:
Because of the increased availability of different kind of business intelligence technologies and tools it can be easy to fall in illusion that new technologies will automatically solve the problems of data management and reporting of the company. The management is not only about management of technology but also the management of processes and people. This thesis is focusing more into traditional data management and performance management of production processes which both can be seen as a requirement for long lasting development. Also some of the operative BI solutions are considered in the ideal state of reporting system. The objectives of this study are to examine what requirements effective performance management of production processes have for data management and reporting of the company and to see how they are effecting on the efficiency of it. The research is executed as a theoretical literary research about the subjects and as a qualitative case study about reporting development project of Finnsugar Ltd. The case study is examined through theoretical frameworks and by the active participant observation. To get a better picture about the ideal state of reporting system simple investment calculations are performed. According to the results of the research, requirements for effective performance management of production processes are automation in the collection of data, integration of operative databases, usage of efficient data management technologies like ETL (Extract, Transform, Load) processes, data warehouse (DW) and Online Analytical Processing (OLAP) and efficient management of processes, data and roles.