993 resultados para Power delivery


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this study was to investigate the nature of co-operation between a project owner and an outside engineering consultant in combined heat and power plant implementation projects. Moreover, as another focal subject of the study was to familiarize the purchasing behavior of the energy producer and how an outside engineering consultant participated into different stages of the purchasing process. The study was carried out as a multiple case study including altogether six Finnish power plant implementation projects that had been taken into commercial use during 1995 – 2015. By adjusting the findings of empirical interview data and comparing those to the theoretical framework concerning, among others, Finnish energy production, engineering consulting businesses, delivery methods of construction project and finally the purchasing process, it can be concluded that especially in the power plant implementation projects in the past have a great influence to decisions made during the project. The role of the main engineering consultant is to act as an assistant, who helps to achieve the project goals successfully rather than an advisor who only knows how the project should be conducted. At least in these five project cases this was the case, meaning that the final decision power always remaining with project owner.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study compares different electric propulsion systems. Results of the analysis of all the advantages and disadvantages of the different propulsion systems are given. This thesis estimates possibilities to apply different diesel-electric propulsion concepts for different vessel types. Small and medium size vessel’s power ranges are studied. The optimal delivery system is chosen. This choice is made on the base of detailed study of the concepts, electrical equipment market and comparison of mass, volume and efficiency parameters. In this thesis three marine generators are designed. They are: salient pole synchronous generator and two permanent magnet synchronous generators. Their electrical, dimensional, cost and efficiency parameters are compared. To understand all the benefits diagrams with these parameters are prepared. Possible benefits and money savings are estimated. As the result the advantages, disadvantages and boundary conditions for the permanent magnet synchronous generator application in marine electric-power systems are found out.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this thesis is to study organizational core values and their application in practice. With the help of literature, the thesis discusses the implementation of core values and the benefits that companies can gain by doing it successfully. Also, ways in which companies can improve their values’ application to their everyday work are presented. The case company’s value implementation is evaluated through a survey research conducted on their employees. The true power of values lies in their application, and therefore, core values should be the basis for all organizational behavior, integrated into everything a company does. Applying values in practice is an ongoing process and companies should continuously work towards creating a more value-based organizational culture. If a company does this effectively, they will most likely become more successful with stakeholders as well as financially. Companies looking to turn their values into actions should start with a self-assessment. Employee surveys are effective in assessing the current level of value implementation, since employees have valuable, first-hand information regarding the situations and behaviors they face in their everyday work. After the self-assessment, things like management commitment, communication, training, and support are key success factors in value implementation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reliable detection of intrapartum fetal acidosis is crucial for preventing morbidity. Hypoxia-related changes of fetal heart rate variability (FHRV) are controlled by the autonomic nervous system. Subtle changes in FHRV that cannot be identified by inspection can be detected and quantified by power spectral analysis. Sympathetic activity relates to low-frequency FHRV and parasympathetic activity to both low- and high-frequency FHRV. The aim was to study whether intra partum fetal acidosis can be detected by analyzing spectral powers of FHRV, and whether spectral powers associate with hypoxia-induced changes in the fetal electrocardiogram and with the pH of fetal blood samples taken intrapartum. The FHRV of 817 R-R interval recordings, collected as a part of European multicenter studies, were analyzed. Acidosis was defined as cord pH ≤ 7.05 or scalp pH ≤ 7.20, and metabolic acidosis as cord pH ≤ 7.05 and base deficit ≥ 12 mmol/l. Intrapartum hypoxia increased the spectral powers of FHRV. As fetal acidosis deepened, FHRV decreased: fetuses with significant birth acidosis had, after an initial increase, a drop in spectral powers near delivery, suggesting a breakdown of fetal compensation. Furthermore, a change in excess of 30% of the low-to-high frequency ratio of FHRV was associated with fetal metabolic acidosis. The results suggest that a decrease in the spectral powers of FHRV signals concern for fetal wellbeing. A single measure alone cannot be used to reveal fetal hypoxia since the spectral powers vary widely intra-individually. With technical developments, continuous assessment of intra-individual changes in spectral powers of FHRV might aid in the detection of fetal compromise due to hypoxia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this thesis is to find development areas for site operations in power plant construction projects delivered by Wärtsilä. The inspected operations are subcontractor management, site material management and work scheduling. The contractor's role in EPC project is to respond for engineering, procurement, and construction supervision. Geographical and cultural differences brings challenges for finding development areas as Wärtsilä delivers projects world-wide. Searching for development area is mainly made with survey, which answers were collected from the target company's site personnel. Based on the results, with good planning and preparation various problems would be avoided. An external view for the thesis was collected by an expert interview, which was held to three expe-rienced construction operating executives. Interviewees believed that with the se-lection of right site personnel and clearly defined areas of responsibility will great-ly affect the outcome of the project. Some of the theory has been collected from areas, which have helped to under-stand the inspected operations on site. Improving competence knowledge has been important due to the broad scope of work and the author’s inexperience of the topic. Also generally effective practices from construction projects has been col-lected to the theory part. Functionality of general practices have been reflected together with the results of empirically collected data for Wärtsilä's projects. As a result, a model was generated where development proposals and the benefits from new procedures were presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

For this paper, heterolingualism or language plurality will be considered as the presence in a single text or in a social environment of both French and English, Canada’s official languages. Language plurality will here be studied from an institutional viewpoint: the influence of the Canadian government on the translation of political speeches. The first part of this article will establish that political speeches are written in a bilingual environment where the two official languages are often in contact. This bilingualism, however, is often homogenised when it comes to speech delivery and publication. Therefore, the second part focuses on the speeches’ paratextual

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A resonant transmitter–receiver system is described for the wireless transmission of energy at a useful distance for grid-coordinate power and information. Experimental results are given showing delivery of power of an unmodified Tesla resonator contrasted with a modified version achieving improved efficiency over a 4 m range. A theoretical basis is provided to back up the experimental results obtained and to link the study with previous research in the field. A number of potential routes are suggested for further investigations and some possible applications of the technology are considered.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The work involves investigation of a type of wireless power system wherein its analysis will yield the construction of a prototype modeled as a singular technological artifact. It is through exploration of the artifact that forms the intellectual basis for not only its prototypical forms, but suggestive of variant forms not yet discovered. Through the process it is greatly clarified the role of the artifact, its most suitable application given the constraints on the delivery problem, and optimization strategies to improve it. In order to improve maturity and contribute to a body of knowledge, this document proposes research utilizing mid-field region, efficient inductive-transfer for the purposes of removing wired connections and electrical contacts. While the description seems enough to state the purpose of this work, it does not convey the compromises of having to redraw the lines of demarcation between near and far-field in the traditional method of broadcasting. Two striking scenarios are addressed in this thesis: Firstly, the mathematical explanation of wireless power is due to J.C. Maxwell's original equations, secondly, the behavior of wireless power in the circuit is due to Joseph Larmor's fundamental works on the dynamics of the field concept. A model of propagation will be presented which matches observations in experiments. A modified model of the dipole will be presented to address the phenomena observed in the theory and experiments. Two distinct sets of experiments will test the concept of single and two coupled-modes. In a more esoteric context of the zero and first-order magnetic field, the suggestion of a third coupled-mode is presented. Through the remaking of wireless power in this context, it is the intention of the author to show the reader that those things lost to history, bound to a path of complete obscurity, are once again innovative and useful ideas.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Wireless Sensor Networks (WSNs) have been an exciting topic in recent years. The services offered by a WSN can be classified into three major categories: monitoring, alerting, and information on demand. WSNs have been used for a variety of applications related to the environment (agriculture, water and forest fire detection), the military, buildings, health (elderly people and home monitoring), disaster relief, and area or industrial monitoring. In most WSNs tasks like processing the sensed data, making decisions and generating emergency messages are carried out by a remote server, hence the need for efficient means of transferring data across the network. Because of the range of applications and types of WSN there is a need for different kinds of MAC and routing protocols in order to guarantee delivery of data from the source nodes to the server (or sink). In order to minimize energy consumption and increase performance in areas such as reliability of data delivery, extensive research has been conducted and documented in the literature on designing energy efficient protocols for each individual layer. The most common way to conserve energy in WSNs involves using the MAC layer to put the transceiver and the processor of the sensor node into a low power, sleep state when they are not being used. Hence the energy wasted due to collisions, overhearing and idle listening is reduced. As a result of this strategy for saving energy, the routing protocols need new solutions that take into account the sleep state of some nodes, and which also enable the lifetime of the entire network to be increased by distributing energy usage between nodes over time. This could mean that a combined MAC and routing protocol could significantly improve WSNs because the interaction between the MAC and network layers lets nodes be active at the same time in order to deal with data transmission. In the research presented in this thesis, a cross-layer protocol based on MAC and routing protocols was designed in order to improve the capability of WSNs for a range of different applications. Simulation results, based on a range of realistic scenarios, show that these new protocols improve WSNs by reducing their energy consumption as well as enabling them to support mobile nodes, where necessary. A number of conference and journal papers have been published to disseminate these results for a range of applications.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The capacitated redistricting problem (CRP) has the objective to redefine, under a given criterion, an initial set of districts of an urban area represented by a geographic network. Each node in the network has different types of demands and each district has a limited capacity. Real-world applications consider more than one criteria in the design of the districts, leading to a multicriteria CRP (MCRP). Examples are found in political districting, sales design, street sweeping, garbage collection and mail delivery. This work addresses the MCRP applied to power meter reading and two criteria are considered: compactness and homogeneity of districts. The proposed solution framework is based on a greedy randomized adaptive search procedure and multicriteria scalarization techniques to approximate the Pareto frontier. The computational experiments show the effectiveness of the method for a set of randomly generated networks and for a real-world network extracted from the city of São Paulo. © 2013 Elsevier Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Solid oral dosage form disintegration in the human stomach is a highly complex process dependent on physicochemical properties of the stomach contents as well as on physical variables such as hydrodynamics and mechanical stress. Understanding the role of hydrodynamics and forces in disintegration of oral solid dosage forms can help to improve in vitro disintegration testing and the predictive power of the in vitro test. The aim of this work was to obtain a deep understanding of the influence of changing hydrodynamic conditions on solid oral dosage form performance. Therefore, the hydrodynamic conditions and forces present in the compendial PhEur/USP disintegration test device were characterized using a computational fluid dynamics (CFD) approach. Furthermore, a modified device was developed and the hydrodynamic conditions present were simulated using CFD. This modified device was applied in two case studies comprising immediate release (IR) tablets and gastroretentive drug delivery systems (GRDDS). Due to the description of movement provided in the PhEur, the movement velocity of the basket-rack assembly follows a sinusoidal profile. Therefore, hydrodynamic conditions are changing continually throughout the movement cycle. CFD simulations revealed that the dosage form is exposed to a wide range of fluid velocities and shear forces during the test. The hydrodynamic conditions in the compendial device are highly variable and cannot be controlled. A new, modified disintegration test device based on computerized numerical control (CNC) technique was developed. The modified device can be moved in all three dimensions and radial movement is also possible. Simple and complex moving profiles can be developed and the influence of the hydrodynamic conditions on oral solid dosage form performance can be evaluated. Furthermore, a modified basket was designed that allows two-sided fluid flow. CFD simulations of the hydrodynamics and forces in the modified device revealed significant differences in the fluid flow field and forces when compared to the compendial device. Due to the CNC technique moving velocity and direction are arbitrary and hydrodynamics become controllable. The modified disintegration test device was utilized to examine the influence of moving velocity on disintegration times of IR tablets. Insights into the influence of moving speed, medium viscosity and basket design on disintegration times were obtained. An exponential relationship between moving velocity of the modified basket and disintegration times was established in simulated gastric fluid. The same relationship was found between the disintegration times and the CFD predicted average shear stress on the tablet surface. Furthermore, a GRDDS was developed based on the approach of an in situ polyelectrolyte complex (PEC). Different complexes composed of different grades of chitosan and carrageenan and different ratios of those were investigated for their swelling behavior, mechanical stability, and in vitro drug release. With an optimized formulation the influence of changing hydrodynamic conditions on the swelling behavior and the drug release profile was demonstrated using the modified disintegration test device. Both, swelling behavior and drug release, were largely dependent on the hydrodynamic conditions. Concluding, it has been shown within this thesis that the application of the modified disintegration test device allows for detailed insights into the influence of hydrodynamic conditions on solid oral dosage form disintegration and dissolution. By the application of appropriate test conditions, the predictive power of in vitro disintegration testing can be improved using the modified disintegration test device. Furthermore, CFD has proven a powerful tool to examine the hydrodynamics and forces in the compendial as well as in the modified disintegration test device. rn

Relevância:

30.00% 30.00%

Publicador:

Resumo:

OBJECTIVES: To assess the microbiological outcome of local administration of minocycline hydrochloride microspheres 1 mg (Arestin) in cases with peri-implantitis and with a follow-up period of 12 months. MATERIAL AND METHODS: After debridement, and local administration of chlorhexidine gel, peri-implantitis cases were treated with local administration of minocycline microspheres (Arestin). The DNA-DNA checkerboard hybridization method was used to detect bacterial presence during the first 360 days of therapy. RESULTS: At Day 10, lower bacterial loads for 6/40 individual bacteria including Actinomyces gerensceriae (P<0.1), Actinomyces israelii (P<0.01), Actinomyces naeslundi type 1 (P<0.01) and type 2 (P<0.03), Actinomyces odontolyticus (P<0.01), Porphyromonas gingivalis (P<0.01) and Treponema socranskii (P<0.01) were found. At Day 360 only the levels of Actinobacillus actinomycetemcomitans were lower than at baseline (mean difference: 1x10(5); SE difference: 0.34x10(5), 95% CI: 0.2x10(5) to 1.2x10(5); P<0.03). Six implants were lost between Days 90 and 270. The microbiota was successfully controlled in 48%, and with definitive failures (implant loss and major increase in bacterial levels) in 32% of subjects. CONCLUSIONS: At study endpoint, the impact of Arestin on A. actinomycetemcomitans was greater than the impact on other pathogens. Up to Day 180 reductions in levels of Tannerella forsythia, P. gingivalis, and Treponema denticola were also found. Failures in treatment could not be associated with the presence of specific pathogens or by the total bacterial load at baseline. Statistical power analysis suggested that a case control study would require approximately 200 subjects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The price formation of the Iberian Energy Derivatives Market-the power futures market-starting in July 2006, is assessed until November 2011, through the evolution of the difference between forward and spot prices in the delivery period (“ex-post forward risk premium”) and the comparison with the forward generation costs from natural gas (“clean spark spread”). The premium tends to be positive in all existing mechanisms (futures, Over-the-Counter and auctions for catering part of the last resort supplies). Since year 2011, the values are smaller due to regulatorily recognized prices for coal power plants. The power futures are strongly correlated with European gas prices. The spreads built with prompt contracts tend also to be positive. The biggest ones are for the month contract, followed by the quarter contract and then by the year contract. Therefore, gas fired generation companies can maximize profits trading with contracts of shorter maturity.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A mobile interactive online health system was used to conduct virtual ward rounds at a regional hospital which had no specialist paediatrician. The system was wireless, which allowed telepaediatric services to be delivered direct to the bedside. Between December 2004 and May 2005, 43 virtual ward rounds were coordinated between specialists based in Brisbane and local staff at the Gladstone Hospital. Eighty-six consultations were provided for 64 patients. The most common conditions included asthma (27%), chest infections (12%), gastroenteritis (10%) and urinary tract infections (10%). In the majority of cases, there were partial (67%) or complete changes (11%) in the clinical management of patients. Specialist services were offered by a team of 13 clinicians at the Royal Children's Hospital: 10 general paediatricians, two physiotherapists and one registered nurse. Feedback from all consultants involved in the service and local staff in Gladstone was extremely positive. In 43 videoconference calls there were three technical problems, probably due to an intermittent mains power supply at the regional hospital. There appears to be potential for other rural and regional hospitals to adopt this model of service delivery.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Aston University has been working closely with key companies from within the electricity industry for several years, initially in the development and delivery of an employer-led foundation degree programme in electrical power engineering, and more recently, in the development of a progression pathway for foundation degree graduates to achieve a Bachelors-level qualification. The Electrical Power Engineering foundation degree was developed in close consultation with the industry such that the programme is essentially owned by the sector. Programme delivery has required significant shifts away from traditional HE teaching patterns whilst maintaining the quality requirement and without compromise of the academic degree standard. Block teaching (2-week slots), partnership delivery, off-site student support and work-based learning have all presented challenges as we have sought to maximise the student learning experience and to ensure that the graduates are fit-for purpose and "hit the ground running" within a defined career structure for sponsoring companies. This paper will outline the skills challenges facing the sector; describe programme developments and delivery challenges; before articulating some observations and conclusions around programme effectiveness, impact of foundation degree graduates in the workplace and the significance of the close working relationship with key sponsoring companies. Copyright © 2012, September.