876 resultados para project planning and controlling


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Visualization is a relatively recent tool available to engineers for enhancing transportation project design through improved communication, decision making, and stakeholder feedback. Current visualization techniques include image composites, video composites, 2D drawings, drive-through or fly-through animations, 3D rendering models, virtual reality, and 4D CAD. These methods are used mainly to communicate within the design and construction team and between the team and external stakeholders. Use of visualization improves understanding of design intent and project concepts and facilitates effective decision making. However, visualization tools are typically used for presentation only in large-scale urban projects. Visualization is not widely accepted due to a lack of demonstrated engineering benefits for typical agency projects, such as small- and medium-sized projects, rural projects, and projects where external stakeholder communication is not a major issue. Furthermore, there is a perceived high cost of investment of both financial and human capital in adopting visualization tools. The most advanced visualization technique of virtual reality has only been used in academic research settings, and 4D CAD has been used on a very limited basis for highly complicated specialty projects. However, there are a number of less intensive visualization methods available which may provide some benefit to many agency projects. In this paper, we present the results of a feasibility study examining the use of visualization and simulation applications for improving highway planning, design, construction, and safety and mobility.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Engineering Research Institute at Iowa State University studied the organization and procedures for highway planning by all levels of government and the coordination among various state agencies and local governments in Iowa. Study information was derived from interviews, questionnaires, and a review of the literature. Representatives from state transportation or highway organizations in all states responded to questionnaires. Additionally, selected upper and intermediate level personnel from highway organizations in seven other states were interviewed and a visit was made to one state transportation department. Within Iowa, employees were interviewed in the Highway Commission, Office for Planning and Programming, Development Commission, Commerce Commission, Conservation Commission, and Highway Patrol. Nearly 600 officials of local governments in Iowa contributed factual data and opinions through questionnaires and interviews. Private citizens and consultants also provided input to the investigation through their responses to questionnaires. Twelve recommendations to improve highway planning in Iowa were formulated as a result of this study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Creating and using FLOSS in R+D projects raises several legal issues, which need to be managed as soon as possible - preferably during the project planning stage. Challenges in the areas of project structure and policy, licenses and licensing, exploitation strategies, community management, and FLOSS-friendliness in general all have their legal aspects, which are commented here. Some recommendations are made for assisting in the use of FLOSS in R+D projects, especially in multiple party consortiums.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Diplomityössä on tutkittu reaaliaikaisen toimintolaskennan toteuttamista suomalaisen lasersiruja valmistavan PK-yrityksen tietojärjestelmään. Lisäksi on tarkasteltu toimintolaskennan vaikutuksia operatiiviseen toimintaan sekä toimintojen johtamiseen. Työn kirjallisuusosassa on käsitelty kirjallisuuslähteiden perusteella toimintolaskennan teorioita, laskentamenetelmiä sekä teknisessä toteutuksessa käytettyjä teknologioita. Työn toteutusosassa suunniteltiin ja toteutettiin WWW-pohjainen toimintolaskentajärjestelmä case-yrityksen kustannuslaskennan sekä taloushallinnon avuksi. Työkalu integroitiin osaksi yrityksen toiminnanohjaus- sekä valmistuksenohjausjärjestelmää. Perinteisiin toimintolaskentamallien tiedonkeruujärjestelmiin verrattuna case-yrityksessä syötteet toimintolaskentajärjestelmälle tulevat reaaliaikaisesti osana suurempaa tietojärjestelmäintegraatiota.Diplomityö pyrkii luomaan suhteen toimintolaskennan vaatimusten ja tietokantajärjestelmien välille. Toimintolaskentajärjestelmää yritys voi hyödyntää esimerkiksi tuotteiden hinnoittelussa ja kustannuslaskennassa näkemällä tuotteisiin liittyviä kustannuksia eri näkökulmista. Päätelmiä voidaan tehdä tarkkaan kustannusinformaatioon perustuen sekä määrittää järjestelmän tuottaman datan perusteella, onko tietyn projektin, asiakkuuden tai tuotteen kehittäminen taloudellisesti kannattavaa.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Diplomityön tavoitteena oli kehittää Andritzin Kuitulinja-divisioonalle tunnuslukuja, työkaluja sekä menetelmiä projektin johdon jasuunnittelun eri osa-alueiden arviointiin, hinnoitteluun ja seurantaan Työn teoriaosuudessa käsiteltiin projektiliiketoimintaa, suunnitteluaja sen hankintaa, tunnuslukuja sekä mittaamista projektiympäristössä. Työn pääpaino oli kuitenkin empiriaosuudella, jossa aluksi tutustuttiin yksityiskohtaisesti työssä tutkittaviin osa-alueisiin. Tiedonkeruuvaiheessa kerättiin suuri määrätunnuslukujen laskemiseksi tarvittavaa tietoa toteutetuista tai vielä hieman keskeneräisistä projekteista. Työn kirjallinen osuus ja kerätty numeerinen tieto yhdistettiin tunnuslukujen analysointivaiheessa, jossa tutkittiin eri tunnuslukujen soveltuvuutta mittaamiseen. Tunnusluvut soveltuivat hyvin joidenkin osa-alueiden kuten prosessi- ja putkistosuunnittelun mittaamiseen. Joidenkin osa-alueiden, kuten rakennussuunnittelun mittaaminen tunnuslukujen avulla oli vaikeampaa tunnuslukujen suuresta hajonnasta johtuen. Eri osa-alueille saatiin kuitenkin määritettyä parhaat tunnusluvut, projektien luokitteluperusteet ja standardiarvot. Työn lopputuloksina saatiin päätavoitteena ollut tunnuslukumittaristo sekä mittaamisen yhtenäistämiseksi luotu tiedonkeruulomake. Mittaamisen tehostamiseksi ja kehittämiseksi tehtiin useita jatkotutkimus- ja kehitysehdotuksia. Lisäksi työssä esitettiin uusi menetelmä projektinohjauksen ja resurssisuunnittelun tueksi.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lappeenrannan teknillisen korkeakoulun sähkötekniikan osasto muutti 1.8.2005 sähkötekniikan tutkinnon kaksiportaiseksi ja vastaamaan näin Bologna-prosessia ja Suomen yliopistolainsäädäntöä. Tutkinnonuudistuksen myötä osasto haluaa varmistaa sähkötekniikan tutkintojen laadun ja vertailtavuuden sekä parantaa opiskelijoidensekä henkilökunnan liikkuvuutta. Tutkintojen laatu ja vertailtavuus osoitetaan sähkötekniikan osaston benchmark-projektilla, jossa kerätään tietoja maisteri- ja tohtorintutkintoa tarjoavista eurooppalaisista yliopistoista. Diplomityö käsittää BM-projektin kolmannen vaiheen suunnittelun ja toteutuksen sisältäen teoriaa benchmark-projekteille tyypillisistä toimintatavoista. Hyväksi havaitut menetelmiä, kuten kyselyt ja matriisit, on tässä työssä otettu soveltuvin osin sähkötekniikan osaston BM-projektin työkaluiksi. Diplomityössä analysoidaan työkalujen avulla BM-kumppaneilta kerättyjä tietoja sekä esitetään ratkaisuja, miten sähkötekniikan osastolla voidaan jatkaa parhaiden toimintatapojen löytämistä.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lisääntynyt Balanced Scorecardin käyttö herätti kiinnostuksen tutkia, mistä BSC:ssä oli oikein kysymys. Epäonnistumiset BSC-projekteissa vaikuttivat siihen, että haluttiin tutkia, mikä nykyisissä projektimalleissa oli vikana. Kirjallisuudessa on esitetty useita BSC:n käyttöönoton projektimalleja, joista tunnetuin on Kaplanin ja Nortonin kehittämä malli. Alun perin kyseessä oli varsin operatiivinen suoritusmittaristo, jonka tavoitteena oli nostaa ei-taloudelliset mittarit taloudellisten mittareiden rinnalle. Sittemmin lähestymistapa onlaajentunut strategiapohjaiseksi johtamisen järjestelmäksi, mutta mallin rakentamisessa on vielä puutteita. Havaitut puutteet BSC-projektimalleissa loivat tarpeen uuden mallin kehittämiselle. Tutkimuksen tavoitteena oli kehittää suomalaisten yritysjohtajien ja alan asiantuntijoiden avulla BSC-projektimalli, jota käyttämällä yritykset voisivat menestyksekkäämmin toteuttaa BSC-projektinsa. Lisäksi tavoitteena oli selvittää BSC:n käytön nykytila Suomen 500 suurimmassa yrityksessä. Tutkimuksessa haluttiin myös hankkia tietoa siitä, miksi yritykset olivat lähteneet BSC-projektiin, mitkä tekijät vaikuttivat BSC-projektin onnistumiseen jamitä muutoksia yritykset olivat tehneet BSC:n käytännön kokemuksen pohjalta. Tutkimuksen teoriaosassa tarkasteltiin yrityksen strategista suunnittelua ja johtamista, yrityksen johtamisessa käytettyjä ohjausjärjestelmiä, toiminnan kehittämistä ja BSC-projektien toteuttamista. Tutkimuksen empiriisessä osassa kehitettiinkymmenvaiheinen BSC-projektin toteuttamismalli. Se tehtiin tutustumalla 15 konsultointiyrityksen tapaan toteuttaa BSC-projekti ja paneutumalla 50 yrityksen BSC-projektista saamiin kokemuksiin. Kehitettyä mallia testattiin Tulikivi-casessa,ja sitä arvioitiin kyselytutkimuksessa ja työistunnossa. Kyselytutkimuksen mukaan ensimmäiset suomalaiset yritykset aloittivat BSC:n käytön vuonna 1995. Vuonna1996 käyttö yleistyi jonkin verran, ja vuosia 1997 ja 1998 voidaan Suomessa kutsua BSC:n läpimurtovuosiksi. Vastanneista yrityksistä 23,2 % ilmoitti käyttävänsä BSC:tä. Yrityksistä 14,8 % oli ottamassa sitä käyttöön, ja 19,2 % harkitsi käyttöönottamista. Yritykset olivat lähteneet BSC-projektiin mm. paremman ohjausjärjestelmän, toiminnan tehostamisen ja muutoksen aikaansaamisen toivossa. BSC-projektin onnistumisen tärkeimpinä tekijöinä pidettiin johdon sitoutumista hankkeeseen, mittariston kytkeytymistä strategiaan ja mittareiden selkeyttä. BSC:n nähtiin vaikuttaneen yrityksissä eniten liiketoiminnan kokonaisuuden ymmärtämiseen, strategian toteutumiseen ja ei-taloudellisten asioiden seurantaan. Yrityksissä olimuutettu toimintaa mm. niin, että se suuntautuisi enemmän asiakkaisiin ja tulevaisuuteen. Tulevaisuudessa BSC:llä uskottiin olevan suurimmat vaikutukset kokonaisvaltaiseen ja strategiseen johtamiseen sekä strategian toteutumisen seurantaan. Kyselytutkimuksen perusteella voitiin osoittaa, että suuret yritykset käyttävät BSC:tä enemmän kuin pienet yritykset. Myös alueellisia eroja on: pääkaupunkiseudulla BSC:tä käytetään enemmän kuin muualla maassa. Mitä kannattavammaksi kyselyyn vastaaja arvioi yrityksensä, sitä parempana se piti tässä tutkimuksessa kehitettyä BSC-projektimallia verrattuna Kaplanin ja Nortonin kehittämään BSC-projektimalliin. BSC-projekti on niin kokonaisvaltainen, että sen onnistuminen edellyttää koko henkilöstön osallistuvan siihen. Ylimmän johdon aito sitoutuminen on välttämätöntä, jotta BSC-projekti saa riittävästi resursseja. Projektissa visio jastrategiat puretaan käytännön toimiksi, joten ilman ylimmän johdon mukanaoloa projektilla ei ole asiakasta. Keskijohto ja henkilöstö toteuttavat laaditut strategiat, jolloin heidän panoksensa on erittäin merkittävä projektin onnistumiseksi. Henkilöstö pitää saada osallistumaan mittaristotyöhön, jotta he sitoutuisivat asetettuihin tavoitteisiin. Ellei henkilöstöä saada mukaan, mittaristo jää helposti ylimmän johdon työkaluksi. Tällöin strategian toteuttaminen koko organisaatiossa on hyvin työlästä, jopa mahdotonta. Mittariston pitää olla strategialähtöinen, eikä se saa olla liian monimutkainen. Mitä alemmalle tasolle organisaatiossamennään, sitä yksinkertaisempi mittariston pitää olla. Ylimmillä tasoilla mittareita voi olla kahdeksasta kahteentoista, mutta alemmilla tasoilla niitä on oltava hieman vähemmän. Projektin nopea läpivienti yrityksessä ei saa olla itsetarkoitus, mutta nopeasti saadut konkreettiset tulokset auttavat, että projekti saa resursseja ja mahdollistavat palautteen saamisen ja oppimisen. Kerralla ei BSC:täsaada täydellisesti toimivaksi, vaan se on oppimisprosessi, joka mahdollistaa syvällisemmän strategian toteuttamiseen. Tässä tutkimuksessa kehitetty BSC-projektin toteuttamismalli perustuu kymmenien asiantuntijoiden kokemuksiin ja näkemyksiin BSC-projektin toteuttamisesta. Kyselytutkimuksesta, työistunnosta ja Tulikivi-casesta saadut tulokset osoittavat, että kehitetyn mallin avulla yrityksillä on entistä paremmat mahdollisuudet saada BSC-projekti onnistumaan. Näin tutkimuksen päätavoite saavutettiin. Muut tavoitteet saavutettiin kyselytutkimuksen tulosten avulla.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of the thesis is to structure and model the factors that contribute to and can be used in evaluating project success. The purpose of this thesis is to enhance the understanding of three research topics. The goal setting process, success evaluation and decision-making process are studied in the context of a project, business unitand its business environment. To achieve the objective three research questionsare posed. These are 1) how to set measurable project goals, 2) how to evaluateproject success and 3) how to affect project success with managerial decisions.The main theoretical contribution comes from deriving a synthesis of these research topics which have mostly been discussed apart from each other in prior research. The research strategy of the study has features from at least the constructive, nomothetical, and decision-oriented research approaches. This strategy guides the theoretical and empirical part of the study. Relevant concepts and a framework are composed on the basis of the prior research contributions within the problem area. A literature review is used to derive constructs of factors withinthe framework. They are related to project goal setting, success evaluation, and decision making. On the basis of this, the case study method is applied to complement the framework. The empirical data includes one product development program, three construction projects, as well as one organization development, hardware/software, and marketing project in their contexts. In two of the case studiesthe analytic hierarchy process is used to formulate a hierarchical model that returns a numerical evaluation of the degree of project success. It has its origin in the solution idea which in turn has its foundation in the notion of projectsuccess. The achieved results are condensed in the form of a process model thatintegrates project goal setting, success evaluation and decision making. The process of project goal setting is analysed as a part of an open system that includes a project, the business unit and its competitive environment. Four main constructs of factors are suggested. First, the project characteristics and requirements are clarified. The second and the third construct comprise the components of client/market segment attractiveness and sources of competitive advantage. Together they determine the competitive position of a business unit. Fourth, the relevant goals and the situation of a business unit are clarified to stress their contribution to the project goals. Empirical evidence is gained on the exploitation of increased knowledge and on the reaction to changes in the business environment during a project to ensure project success. The relevance of a successful project to a company or a business unit tends to increase the higher the reference level of project goals is set. However, normal performance or sometimes performance below this normal level is intentionally accepted. Success measures make project success quantifiable. There are result-oriented, process-oriented and resource-oriented success measures. The study also links result measurements to enablers that portray the key processes. The success measures can be classified into success domains determining the areas on which success is assessed. Empiricalevidence is gained on six success domains: strategy, project implementation, product, stakeholder relationships, learning situation and company functions. However, some project goals, like safety, can be assessed using success measures that belong to two success domains. For example a safety index is used for assessing occupational safety during a project, which is related to project implementation. Product safety requirements, in turn, are connected to the product characteristics and thus to the product-related success domain. Strategic success measures can be used to weave the project phases together. Empirical evidence on their static nature is gained. In order-oriented projects the project phases are oftencontractually divided into different suppliers or contractors. A project from the supplier's perspective can represent only a part of the ¿whole project¿ viewed from the client's perspective. Therefore static success measures are mostly used within the contractually agreed project scope and duration. Proof is also acquired on the dynamic use of operational success measures. They help to focus on the key issues during each project phase. Furthermore, it is shown that the original success domains and success measures, their weights and target values can change dynamically. New success measures can replace the old ones to correspond better with the emphasis of the particular project phase. This adjustment concentrates on the key decision milestones. As a conclusion, the study suggests a combination of static and dynamic success measures. Their linkage to an incentive system can make the project management proactive, enable fast feedback and enhancethe motivation of the personnel. It is argued that the sequence of effective decisions is closely linked to the dynamic control of project success. According to the used definition, effective decisions aim at adequate decision quality and decision implementation. The findings support that project managers construct and use a chain of key decision milestones to evaluate and affect success during aproject. These milestones can be seen as a part of the business processes. Different managers prioritise the key decision milestones to a varying degree. Divergent managerial perspectives, power, responsibilities and involvement during a project offer some explanation for this. Finally, the study introduces the use ofHard Gate and Soft Gate decision milestones. The managers may use the former milestones to provide decision support on result measurements and ad hoc critical conditions. In the latter milestones they may make intermediate success evaluation also on the basis of other types of success measures, like process and resource measures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Although usability evaluations have been focused on assessing different contexts of use, no proper specifications have been addressed towards the particular environment of academic websites in the Spanish-speaking context of use. Considering that this context involves hundreds of millions of potential users, the AIPO Association is running the UsabAIPO Project. The ultimate goal is to promote an adequate translation of international standards, methods and ideal values related to usability in order to adapt them to diverse Spanish-related contexts of use. This article presents the main statistical results coming from the Second and Third Stages of the UsabAIPO Project, where the UsabAIPO Heuristic method (based on Heuristic Evaluation techniques) and seven Cognitive Walkthroughs were performed over 69 university websites. The planning and execution of the UsabAIPO Heuristic method and the Cognitive Walkthroughs, the definition of two usability metrics, as well as the outline of the UsabAIPO Heuristic Management System prototype are also sketched.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tämä tutkimus oli osa sähköistä liiketoimintaa ja langattomia sovelluksia tutkivaa projektia ja tutkimuksen tavoitteena oli selvittää ennustamisen rooli päätöksenteko- ja suunnitteluprosessissa ja määrittää parhaiten soveltuvat ja useimmin käytetyt teknologian ennustusmenetelmät. Ennustusmenetelmiä tarkasteltiin erityisesti uuden teknologian ja pitkän aikavälin ennustamisen näkökulmasta. Tutkimus perustui teknologista ennustamista, pitkän aikavälin suunnittelua ja innovaatioprosesseja käsittelevän kirjallisuuden analysointiin. Materiaalin perusteella kuvataan teknologian ennustamista informaation hankkimisvälineenä organisaatioiden suunnitteluprosessin apuna. Työssä arvioidaan myös seuraavat teknologisen ennustamisen menetelmät: trendianalyysi-, Delfoi-, cross-impact analyysi-, morfologinen analyysi- ja skenaario analyysimenetelmä. Työ tuo esille jokaisen ennustusmenetelmä ominaispiirteet, rajoitukset ja sovellusmahdollisuudet. Käyttäen esiteltyjä menetelmiä, saadaan kerättyä hyödyllistä informaatiota tulevaisuuden näkymistä, joita sitten voidaan käyttää hyväksi organisaatioiden suunnitteluprosesseissa.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tavoitteena diplomityössä oli kuvata projektiliiketoimintaa harjoittavan yrityksen informaatio- ja materiaalivirrat toimitusprojekteissa. Selvitys haluttiin tehdä tulevia kehitysprojekteja varten. Diplomityö toteutettiin kahessa osassa: laatimalla aiheeseen liittyvä teoriakatsaus ja kartoittamalla todellinen tilanne yrityksen sisällä.Teoriaosassa kuvattiin tarkastelualue ja projektiliiketoiminnan erityispiirteitä sekä käsiteltiin tietojärjestelmiä ja materiaalivirran hallintaan liittyviä asioita. Yrityksen informaatio- ja materiaalivirtojen nykytila kartoitettiin laatimalla vuokaaviot kolmen esimerkkituotteen toimitusprojekteista. Kaaviot laadittiin yrityksen sisäisten dokumenttien ja kvalitatiivisten haastattelujen pohjalta. Kaavioiden sisältöä täydennettiin taulukoimalla kaavioissa esiintyvien dokumettien sisältöä. Työn tuloksena muodostui kuva tiedonkäsittelyn nykytilasta myynti- ja toimitusprojekteissa, pelkistetty visio tulevaisuuden tietojärjestelmien rooleista sekä ehdotuksia tulevia kehitysprojekteja varten.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tämän tutkielman tavoitteena on perehtyä globaalin yrityksen laskentatoimen tietojärjestelmien yhtenäistämiseen ja käyttöönottoon esimerkkinä UPM-Kymmene konsernin projekti. Tutkielmassa sovelletaan hermeneuttista tutkimusotetta. Teoreettisesti aihetta tarkastellaan globalisoitumisen ja laskentatoimen tietojärjestelmille asetettavien vaatimusten pohjalta, sekä järjestelmän muutosprosessin eri vaiheissa huomioon otettavien muuttujien perusteella. Yhtenäisen laskentatoimen tietojärjestelmän tuomat edut globaalille yritykselle ovat ilmeisiä. Ennen yhtenäisen projektin kehittelyä on olennaista tutkia lähtökohdat projektin onnistumiselle ja suunnitella projektin eri vaiheet huolella. Tutkielmassa havaitaan myös, että globaalissa yrityksessä tulee huomioida eri yrityskulttuurit sekä tulosyksiköiden erilaiset toimintatavat. Johtopäätöksenä todetaan, että sekä yritysjohdon että tulosyksiköiden sitoutuneisuus projektiin ja yhtenäiset tavoitteet ovat oleellisia projektin onnistumisen kannalta.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Informaatiotulva ja organisaation monimutkaisuus luoneet tarpeen tietämyksen hallinnalle. Tämän tutkimuksen tavoitteena on tunnistaa muutostarpeet, jotka portaalin käyttöönotto tietämyksenhallintatyökaluna luo. Tutkimuksessa verrataan myös uusia työkaluja olemassa oleviin sekä arvioidaan organisaation kykyä siirtää tietämystä virtuaalisesti. Kirjallisuutta vastaavanlaisista projekteista ei ole ollut saatavilla, sillä käyttöönotettava teknologia on melko uutta. Samaa teknologiaa on käytössä hieman eri alueella, kuin tässä projektissa on tavoitteena. Tutkimus on tapaustutkimus, jonka pääasialliset lähteet ovat erilaisissa kokouksissa tuotettuja dokumentteja. Tutkija on osallistunut aktiivisesti projektityöhön, joten osa taustatiedoista perustuu tutkijan huomioihin sekä vielä keskusteluihin. Teoriaosassa käsitellään tietämyksen jakamista tietämyksen hallinnan ja virtuaalisuuden näkökulmasta. Muutoksen hallintaa on käsitelty lyhyesti tietämyksenhallintatyökalun käyttöönotossa. Tutkimus liittyy Stora Enso Consumer Boardsin tietämyksen hallintaprojektiin.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this thesis a model for managing the product data in a product transfer project was created for ABB Machines. This model was then applied for the ongoing product transfer project during its planning phase. Detailed information about the demands and challenges in product transfer projects was acquired by analyzing previous product transfer projects in participating organizations. This analysis and the ABB Gate Model were then used as a base for the creation of the model for managing the product data in a product transfer project. The created model shows the main tasks during each phase in the project, their sub-tasks and relatedness on general level. Furthermore the model emphasizes need for detailed analysis of the situation during the project planning phase. The created model for managing the product data in a product transfer project was applied into ongoing project two main areas; manufacturing instructions and production item data. The results showed that the greatest challenge considering the product transfer project in previously mentioned areas is the current state of the product data. Based on the findings, process and resource proposals for both the ongoing product transfer project and the BU Machines were given. For manufacturing instructions it is necessary to create detailed process instructions in receiving organizations own language for each department so that the manufacturing instructions can be used as a training material during the training in sending organization. For production item data the English version of the bill of materials needs to be fully in English. In addition it needs to be ensured that bill of materials is updated and these changes implemented before the training in sending organization begins.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study explores relationships between project marketers and their customers in project marketing context. The purpose of the study is to increase the understanding on supplier’s position in project marketing networks. Project marketing is representing a high volume in the international business, and the industrial network approach and the project marketing research cannot fully explain a supplier’s position in project marketing networks. Increased knowledge on project networks can also contribute to industrial marketing research more generally. Data for the present study was collected firstly during the pilot case study from project buyers in the paper and the steel industry in interviews. Secondly an entire project marketing case concerning a steel industry case was used as a data source. The data included interviews, correspondence between the supplier and the buyer, and project documents. The data of the pilot case was analysed with contents analysis, and in the case a deeper analysis based on the developed Stage Dimension framework was used. Supplier’s position in project marketing networks is a hierarchical and dynamic concept including a supplier’s position on the highest level. The dimensions of the position concept are the intermediate level, and the dimensions are based on the underlying components. Supplier’s position is composed from four organization related dimensions, and two individual actor related dimensions. The composition of the supplier’s position varies during the project marketing process, and consequently the relative importance of the dimensions is changing over the process. Supplier’s position in project marketing networks is shaped by incremental and radical changes. Radical changes are initiated by critical events. The study contributes to the research of industrial networks and project marketing. The theoretical contribution of the study is threefold: firstly it proposes a structure of the position concept in project marketing networks, secondly it proposes the Position Stage Dimension Component (PSDC) model for the development of supplier’s position during the project marketing process, and thirdly the study widens the critical event concept to cover the project marketing process both on the organizational and individual level. In addition to the theoretical contributions there are several managerial implications for planning and implementing marketing strategies in the project context.