973 resultados para decoupled net present value


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Relatório do Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia de Electrónica e Telecomunicações

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Localization is a fundamental task in Cyber-Physical Systems (CPS), where data is tightly coupled with the environment and the location where it is generated. The research literature on localization has reached a critical mass, and several surveys have also emerged. This review paper contributes on the state-of-the-art with the proposal of a new and holistic taxonomy of the fundamental concepts of localization in CPS, based on a comprehensive analysis of previous research works and surveys. The main objective is to pave the way towards a deep understanding of the main localization techniques, and unify their descriptions. Furthermore, this review paper provides a complete overview on the most relevant localization and geolocation techniques. Also, we present the most important metrics for measuring the accuracy of localization approaches, which is meant to be the gap between the real location and its estimate. Finally, we present open issues and research challenges pertaining to localization. We believe that this review paper will represent an important and complete reference of localization techniques in CPS for researchers and practitioners and will provide them with an added value as compared to previous surveys.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação apresentada à Escola Superior de Comunicação Social como parte dos requisitos para obtenção de grau de mestre em Publicidade e Marketing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação para a obtenção do grau de Mestre Em Engenharia Electrotécnica Ramo de Energia

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Conferência Políticas Culturais para o Desenvolvimento, organizada no dia 12 de Fevereiro de 2015 pela Artemrede no Teatro Joaquim Benite, em Almada

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Graphics processors were originally developed for rendering graphics but have recently evolved towards being an architecture for general-purpose computations. They are also expected to become important parts of embedded systems hardware -- not just for graphics. However, this necessitates the development of appropriate timing analysis techniques which would be required because techniques developed for CPU scheduling are not applicable. The reason is that we are not interested in how long it takes for any given GPU thread to complete, but rather how long it takes for all of them to complete. We therefore develop a simple method for finding an upper bound on the makespan of a group of GPU threads executing the same program and competing for the resources of a single streaming multiprocessor (whose architecture is based on NVIDIA Fermi, with some simplifying assunptions). We then build upon this method to formulate the derivation of the exact worst-case makespan (and corresponding schedule) as an optimization problem. Addressing the issue of tractability, we also present a technique for efficiently computing a safe estimate of the worstcase makespan with minimal pessimism, which may be used when finding an exact value would take too long.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As it is well known, competitive electricity markets require new computing tools for generation companies to enhance the management of its resources. The economic value of the water stored in a power system reservoir is crucial information for enhancing the management of the reservoirs. This paper proposes a practical deterministic approach for computing the short-term economic value of the water stored in a power system reservoir, emphasizing the need to considerer water stored as a scarce resource with a short-term economic value. The paper addresses a problem concerning reservoirs with small storage capacities, i.e., the reservoirs considered as head-sensitivity. More precisely, the respective hydro plant is head-dependent and a pure linear approach is unable to capture such consideration. The paper presents a case study supported by the proposed practical deterministic approach and applied on a real multi-reservoir power system with three cascaded reservoirs, considering as input data forecasts for the electric energy price and for the natural inflow into the reservoirs over the schedule time horizon. The paper presents various water schedules due to different final stored water volume conditions on the reservoirs. Also, it presents the respective economic value of the water for the reservoirs at different stored water volume conditions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização de Edificações

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mestrado em Gestão e Empreendedorismo

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mestrado em Contabilidade e Gestão das Instituições Financeiras

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação apresentada à Escola Superior de Comunicação Social como parte dos requisitos para obtenção de grau de mestre em Gestão Estratégica das Relações Públicas.