948 resultados para implementation project


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Especially in global enterprises, key data is fragmented in multiple Enterprise Resource Planning (ERP) systems. Thus the data is inconsistent, fragmented and redundant across the various systems. Master Data Management (MDM) is a concept, which creates cross-references between customers, suppliers and business units, and enables corporate hierarchies and structures. The overall goal for MDM is the ability to create an enterprise-wide consistent data model, which enables analyzing and reporting customer and supplier data. The goal of the study was defining the properties and success factors of a master data system. The theoretical background was based on literature and the case consisted of enterprise specific needs and demands. The theoretical part presents the concept, background, and principles of MDM and then the phases of system planning and implementation project. Case consists of background, definition of as is situation, definition of project, evaluation criterions and concludes the key results of the thesis. In the end chapter Conclusions combines common principles with the results of the case. The case part ended up dividing important factors of the system in success factors, technical requirements and business benefits. To clarify the project and find funding for the project, business benefits have to be defined and the realization has to be monitored. The thesis found out six success factors for the MDM system: Well defined business case, data management and monitoring, data models and structures defined and maintained, customer and supplier data governance, delivery and quality, commitment, and continuous communication with business. Technical requirements emerged several times during the thesis and therefore those can’t be ignored in the project. Conclusions chapter goes through these factors on a general level. The success factors and technical requirements are related to the essentials of MDM: Governance, Action and Quality. This chapter could be used as guidance in a master data management project.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Tutkimuksen tavoitteena oli tutkia, miten pankin käyttämä siirtohinnoittelumenetelmä toimii osana pankin ohjausjärjestelmää ja siten tukee organisaation kykyä ja motivaatioita toimia koko pankin kannalta kannattavasti. Ilmiötä tutkittiin tapaustutkimuksena Suomessa toimivassa pankissa. Tutkimuksessa kävi ilmi, että yrityksessä on meneillään siirtohinnoittelumallin muutosprojekti. Projektin tarkoituksena on parantaa kannattavuusseurantaa ja pitkällä tähtäimellä mallin on tarkoitus toimia strategian jalkauttamisen työvälineenä. Tutkimuksessa havaittiin, että siirtohinnoittelumallin keskeisin haaste on saada se sopeutumaan riittävän nopeasti markkinaolosuhteiden muutoksiin siten, että se tukee pankin strategisia tavoitteita. Konttoreiden tulosohjauksessa painotetaan tuloksen lisäksi erilaisia mittaristoja, jotka kuvaavat monipuolisemmin tulosyksikön suoriutumista. Tutkimuksen johtopäätöksenä havaittiin, että siirtohinnoittelumalli voi olla erinomainen johtamisen työkalu, jos se huomioi yrityskohtaiset, taloudelliseen toimintaympäristöön ja yrityksen strategiaan liittyvät erityisvaateet.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This thesis consists of three main theoretical themes: quality of data, success of information systems, and metadata in data warehousing. Loosely defined, metadata is descriptive data about data, and, in this thesis, master data means reference data about customers, products etc. The objective of the thesis is to contribute to an implementation of a metadata management solution for an industrial enterprise. The metadata system incorporates a repository, integration, delivery and access tools, as well as semantic rules and procedures for master data maintenance. It targets to improve maintenance processes and quality of hierarchical master data in the case company’s informational systems. That should bring benefits to whole organization in improved information quality, especially in cross-system data consistency, and in more efficient and effective data management processes. As the result of this thesis, the requirements for the metadata management solution in case were compiled, and the success of the new information system and the implementation project was evaluated.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Information technology service management has become an important task in delivering information for management purposes. Especially applications containing information for decision making need to be agile and ready for changes. The aim of this study was to find a solution for successful implementation of an ITIL based change management process to enterprise resource management applications managed by the target organization. Literature review of the study introduces frameworks that are important for success of an IT project implementation. In addition an overview of ITIL and ITIL based change management process is presented. The result of the study was a framework of actions that are needed to accomplish to be successful in change management process implementation. It was noticed that defining success criterions, critical success factors and success measures is important for achieving the goals of the implementation project.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Tämä diplomityö käsittelee toiminnanohjausjärjestelmän käyttöönottoprojektia varastojen ja työkalujen hallintaan TeollisuusSepät Oy:ssä. Tämän työn käyttöönottoprojektissa laajennetaan yrityksessä jo olemassa olevan toiminnanohjausjärjestelmän käyttöä, ottamalla se käyttöön myös yrityksen varastojen ja työkalujen hallintaan. Käyttöönottoprojektin tavoitteena on lyhentää tuotteiden kiertoaikaa varastossa ja pienentää varastoon sitoutuvaa pääomaa sekä saada työkalujen tiedot yhteen tietokantaan. Työn teoriaosuudessa käsitellään toiminnanohjausjärjestelmää yleisesti ja sen käyttöönotto liittyviä vaiheita sekä muutosvastarintaa ja onnistuneen muutoksen vaiheita. Empiria osuudessa käydään läpi toiminnanohjausjärjestelmän käyttöönottoprojekti varastojen ja työkalujen hallintaan TeollisuusSepät Oy:ssä ja käyttäjien tyytyväisyyttä toiminnanohjausjärjestelmän käyttöön käyttöönottoprojektin jälkeen. Käyttöönottoprojektin jälkeen havaitaan, että käyttäjät ovat tyytyväisiä toiminnanohjausjärjestelmän käyttöön varastojen ja työkalujen hallintaan. Projektin aikana on myös ilmennyt uusia mahdollisia käyttökohteita toiminnanohjausjärjestelmälle TeollisuusSepät Oy:ssä.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Työssä esitetään millä tavoin integraatioita on mahdollista toteuttaa tuotteen elinkaaren hallintajärjestelmän (PLM) ja muiden yrityksien käytössä olevien järjestelmien kesken. Työssä keskitytään etenkin teollisuusyritysten tärkeimpien (ERP & CAD) järjestelmien integraatioiden selvittämiseen. Integraatiovaihtoehtojen lisäksi selvitetään, missä eri rooleissa järjestelmät voivat toimia PLM-järjestelmän kanssa. Työssä tuodaan esille kertyneitä kokemuksia PLM-toteutusprojektiin osallistumisesta Control Express Finland Oy:ssa kesällä 2013.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Several companies are trying to improve their operation efficiency by implementing an enterprise resource planning (ERP) system that makes it possible to control the resources of the company in real time. However, the success of the implementation project is not a foregone conclusion; a significant part of these projects end in a failure, one way or another. Therefore it is important to investigate ERP system implementation more closely in order to increase understanding about factors influencing ERP system success and to improve the probability of a successful ERP implementation project. Consequently, this study was initiated because a manufacturing case company wanted to review the success of their ERP implementation project. To be exact, the case company hoped to gain both information about the success of the project and insight for future implementation improvement. This study investigated ERP success specifically by examining factors that influence ERP key-user satisfaction. User satisfaction is one of the most commonly applied indicators of information system success. The research data was mainly collected by conducting theme interviews. The subjects of the interviews were six key-users of the newly implemented ERP system. The interviewees were closely involved in the implementation project. Furthermore, they act as representative users that utilize the new system in everyday business processes. The collected data was analyzed by thematizing. Both data collection and analysis were guided by a theoretical frame of reference. This frame was based on previous research on the subject. The results of the study aligned with the theoretical framework to large extent. The four principal factors influencing key-user satisfaction were change management, contractor service, key-user’s system knowledge and characteristics of the ERP product itself. One of the most significant contributions of the research is that it confirmed the existence of a connection between change management and ERP key-user satisfaction. Furthermore, it discovered two new sub-factors influencing contractor service related key-user satisfaction. In addition, the research findings indicated that in order to improve the current level of key-user satisfaction, the case company should pay special attention to system functionality improvement and enhancement of the key-users’ knowledge. During similar implementation projects in the future, it would be important to assure the success of change management and contractor service related processes.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This qualitative study investigated how a team of 7 hospital educators collaborated to develop e-curriculum units to pilot for a newly acquired learning -r management system at a large, multisite academic health sciences centre. A case study approach was used to examine how the e-Curriculum Team was structured, how the educators worked together to develop strategies to better utilize e-leaming in their ovwi practice, what e-curriculum they chose to develop, and how they determined their priorities for e-curriculum development. It also inquired into how they planned to involve other educators in using e-leaming. One set of semistructured interviews with the 6 hospital educators involved in the project, as well as minutes of team meetings and the researcher's journal, were analyzed (the researcher was also a hospital educator on the team). Project management structure, educator support, and organizational pressures on the implementation project feature prominently in the case study. This study suggests that implementation of e-leaming will be more successful if (a) educators involved in the development of e-leaming curriculum are supported in their role as change agents, (b) the pain of vmleaming current educational practice is considered, (c) the limitations of the software being implemented are recognized, (d) time is spent leaming about best practice, and (e) the project is protected as much as possible from organizational pressures and distractions.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Die Dissertation befasst sich mit der Einführung komplexer Softwaresysteme, die, bestehend aus einer Kombination aus parametrisierter Standardsoftware gepaart mit Wettbewerbsvorteil sichernden Individualsoftwarekomponenten, keine Software-Engineering-Projekte im klassischen Sinn mehr darstellen, sondern einer strategieorientierten Gestaltung von Geschäftsprozessen und deren Implementierung in Softwaresystemen bedürfen. Die Problemstellung einer adäquaten Abwägung zwischen TCO-optimierender Einführung und einer gleichzeitigen vollständigen Unterstützung der kritischen Erfolgsfaktoren des Unternehmens ist hierbei von besonderer Bedeutung. Der Einsatz integrierter betriebswirtschaftlicher Standardsoftware, mit den Möglichkeiten einer TCO-Senkung, jedoch ebenfalls der Gefahr eines Verlustes von Alleinstellungsmerkmalen am Markt durch Vereinheitlichungstendenzen, stellt ein in Einführungsprojekten wesentliches zu lösendes Problem dar, um Suboptima zu vermeiden. Die Verwendung von Vorgehensmodellen, die sich oftmals an klassischen Softwareentwicklungsprojekten orientieren oder vereinfachte Phasenmodelle für das Projektmanagement darstellen, bedingt eine fehlende Situationsadäquanz in den Detailsituationen der Teilprojekte eines komplexen Einführungsprojektes. Das in dieser Arbeit entwickelte generische Vorgehensmodell zur strategieorientierten und partizipativen Einführung komplexer Softwaresysteme im betriebswirtschaftlichen Anwendungsbereich macht - aufgrund der besonders herausgearbeiteten Ansätze zu einer strategieorientierten Einführung, respektive Entwicklung derartiger Systeme sowie aufgrund der situationsadäquaten Vorgehensstrategien im Rahmen der Teilprojektorganisation � ein Softwareeinführungsprojekt zu einem Wettbewerbsfaktor stärkenden, strategischen Element im Unternehmen. Die in der Dissertation diskutierten Überlegungen lassen eine Vorgehensweise präferieren, die eine enge Verschmelzung des Projektes zur Organisationsoptimierung mit dem Softwareimplementierungsprozess impliziert. Eine Priorisierung der Geschäftsprozesse mit dem Ziel, zum einen bei Prozessen mit hoher wettbewerbsseitiger Priorität ein organisatorisches Suboptimum zu vermeiden und zum anderen trotzdem den organisatorischen Gestaltungs- und den Systemimplementierungsprozess schnell und ressourcenschonend durchzuführen, ist ein wesentliches Ergebnis der Ausarbeitungen. Zusätzlich führt die Ausgrenzung weiterer Prozesse vom Einführungsvorgang zunächst zu einem Produktivsystem, welches das Unternehmen in den wesentlichen Punkten abdeckt, das aber ebenso in späteren Projektschritten zu einem System erweitert werden kann, welches eine umfassende Funktionalität besitzt. Hieraus ergeben sich Möglichkeiten, strategischen Anforderungen an ein modernes Informationssystem, das die kritischen Erfolgsfaktoren eines Unternehmens konsequent unterstützen muss, gerecht zu werden und gleichzeitig ein so weit als möglich ressourcenschonendes, weil die Kostenreduktionsaspekte einer Standardlösung nutzend, Projekt durchzuführen. Ein weiterer wesentlicher Aspekt ist die situationsadäquate Modellinstanziierung, also die projektspezifische Anpassung des Vorgehensmodells sowie die situationsadäquate Wahl der Vorgehensweisen in Teilprojekten und dadurch Nutzung der Vorteile der verschiedenen Vorgehensstrategien beim konkreten Projektmanagement. Der Notwendigkeit der Entwicklung einer Projektorganisation für prototypingorientiertes Vorgehen wird in diesem Zusammenhang ebenfalls Rechnung getragen. Die Notwendigkeit der Unternehmen, sich einerseits mit starken Differenzierungspotenzialen am Markt hervorzuheben und andererseits bei ständig sinkenden Margen einer Kostenoptimierung nachzukommen, lässt auch in Zukunft das entwickelte Modell als erfolgreich erscheinen. Hinzu kommt die Tendenz zu Best-Of-Breed-Ansätzen und komponentenbasierten Systemen im Rahmen der Softwareauswahl, die eine ausgesprochen differenzierte Vorgehensweise in Projekten verstärkt notwendig machen wird. Durch die in das entwickelte Modell integrierten Prototyping-Ansätze wird der auch in Zukunft an Bedeutung gewinnenden Notwendigkeit der Anwenderintegration Rechnung getragen.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Management information systems such as ERP can bring to businesses many competitive advantages. There is a great demand for systems projects to consulting firms that have knowledge to manage this particular type of project. However, the rate of system projects that cannot achieve success is very high. The methodology of Project Management, standardized by the Project Management Institute, is a globally recognized standard and used even in projects involving information technology. In the present study, was made a case study of an ERP system implementation project in a large company, by a consulting firm. From this analysis and on contributions from the literature, recommendations were proposed for the project management, in order to better direct the PMI methodology in large projects involving systems like ERP

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Pós-graduação em Engenharia de Produção - FEG

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Companies are currently choosing to integrate logics and systems to achieve better solutions. These combinations also include companies striving to join the logic of material requirement planning (MRP) system with the systems of lean production. The purpose of this article was to design an MRP as part of the implementation of an enterprise resource planning (ERP) in a company that produces agricultural implements, which has used the lean production system since 1998. This proposal is based on the innovation theory, theory networks, lean production systems, ERP systems and the hybrid production systems, which use both components and MRP systems, as concepts of lean production systems. The analytical approach of innovation networks enables verification of the links and relationships among the companies and departments of the same corporation. The analysis begins with the MRP implementation project carried out in a Brazilian metallurgical company and follows through the operationalisation of the MRP project, until its production stabilisation. The main point is that the MRP system should help the company's operations with regard to its effective agility to respond in time to demand fluctuations, facilitating the creation process and controlling the branch offices in other countries that use components produced in the matrix, hence ensuring more accurate estimates of stockpiles. Consequently, it presents the enterprise knowledge development organisational modelling methodology in order to represent further models (goals, actors and resources, business rules, business process and concepts) that should be included in this MRP implementation process for the new configuration of the production system.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Turkish agriculture has been experiencing a period of unique policy experiment over the last couple years. A World Bank-initiated project, called the Agricultural Reform Implementation Project (ARIP), has been at the forefront of policy change. It was initially promoted by the Bank as an exemplary reform package which could also be adopted by other developing countries. It was introduced in 2001 as part of a major International Monetary Fund (IMF)/World Bank-imposed program of “structural adjustment” after the country had been hit by a major financial crisis. The project has finally come to an end in 2009, and there is now an urgent need for a retrospective assessment of its overall impact on the agricultural sector. Has it fulfilled its ambitious objective of reforming and restructuring Turkish agriculture? Or should it be recorded as a failure of the neo-liberal doctrine? This book aims at finding answers to these questions by investigating the legacy of ARIP from a multi-disciplinary perspective.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This study investigated the characteristics of a clinic that affect how satisfied survivors of childhood cancer are with their medical care. Questionnaire and interview data from the Passport for Care: Texas Implementation project collected between January 2011 to April 2012 were analyzed. Eleven clinics in Texas participated. Questionnaire respondents were childhood cancer survivor patients who had been off therapy for at least 2 years, or their parents. Interview respondents were clinical providers or research staff at the participating clinics. The outcomes evaluated were answers to a single question on satisfaction with care and a composite Percent Satisfaction Score created from seven other questionnaire items that were correlated (Spearman Rho >0.3) with the question on satisfaction. The following characteristics were also evaluated: sex, age, race, education, and type of cancer. The following clinic indicators were evaluated: type of clinic (general vs. dedicated cancer survivor clinics), number of providers, number of survivors, ratio of survivors/providers, distribution of handouts, distribution of treatment summaries, and use of Children's Oncology Group (COG) guidelines. ^ The only demographic characteristic that affected satisfaction was race. A Kruskal-Wallis test showed a statistically significant difference (Chi-square 6.129, 2 d.f., p = 0.0467). To analyze this further, Wilcoxon Rank Sum test of pairings of the three groups were performed. A Bonferroni correction for multiple testing was applied, with p = 0.017 indicating significance at alpha = 0.05. There was no significant difference between the White and Hispanic groups or between the Hispanic and "Other" groups. For the White and "Other" groups there was a significant difference for the satisfaction item (p = 0.0123) but not for the Percent Satisfaction Score (p = 0.0289). These results suggest that race may influence satisfaction and should be evaluated further in future studies. ^ None of the clinic indicators affected the Percent Satisfaction Score. Going to a clinic that distributed patient information handouts (Wilcoxon Rank Sum p = 0.048) and going to a clinic with >=100 survivors (Wilcoxon Rank Sum p = 0.021) were associated with increased satisfaction. The population of childhood cancer survivors is a growing group of individuals with special health needs. In the future survivors will likely seek medical care in a variety of clinical settings, so it is important to investigate features to improve patient satisfaction with clinical care.^

Relevância:

60.00% 60.00%

Publicador:

Resumo:

El objetivo de la presente investigación es el desarrollo de un modelo de cálculo rápido, eficiente y preciso, para la estimación de los costes finales de construcción, en las fases preliminares del proyecto arquitectónico. Se trata de una herramienta a utilizar durante el proceso de elaboración de estudios previos, anteproyecto y proyecto básico, no siendo por tanto preciso para calcular el “predimensionado de costes” disponer de la total definición grafica y literal del proyecto. Se parte de la hipótesis de que en la aplicación práctica del modelo no se producirán desviaciones superiores al 10 % sobre el coste final de la obra proyectada. Para ello se formulan en el modelo de predimensionado cinco niveles de estimación de costes, de menor a mayor definición conceptual y gráfica del proyecto arquitectónico. Los cinco niveles de cálculo son: dos que toman como referencia los valores “exógenos” de venta de las viviendas (promoción inicial y promoción básica) y tres basados en cálculos de costes “endógenos” de la obra proyectada (estudios previos, anteproyecto y proyecto básico). El primer nivel de estimación de carácter “exógeno” (nivel .1), se calcula en base a la valoración de mercado de la promoción inmobiliaria y a su porcentaje de repercusión de suelo sobre el valor de venta de las viviendas. El quinto nivel de valoración, también de carácter “exógeno” (nivel .5), se calcula a partir del contraste entre el valor externo básico de mercado, los costes de construcción y los gastos de promoción estimados de la obra proyectada. Este contraste entre la “repercusión del coste de construcción” y el valor de mercado, supone una innovación respecto a los modelos de predimensionado de costes existentes, como proceso metodológico de verificación y validación extrínseca, de la precisión y validez de las estimaciones resultantes de la aplicación práctica del modelo, que se denomina Pcr.5n (Predimensionado costes de referencia con .5niveles de cálculo según fase de definición proyectual / ideación arquitectónica). Los otros tres niveles de predimensionado de costes de construcción “endógenos”, se estiman mediante cálculos analíticos internos por unidades de obra y cálculos sintéticos por sistemas constructivos y espacios funcionales, lo que se lleva a cabo en las etapas iniciales del proyecto correspondientes a estudios previos (nivel .2), anteproyecto (nivel .3) y proyecto básico (nivel .4). Estos cálculos teóricos internos son finalmente evaluados y validados mediante la aplicación práctica del modelo en obras de edificación residencial, de las que se conocen sus costes reales de liquidación final de obra. Según va evolucionando y se incrementa el nivel de definición y desarrollo del proyecto, desde los estudios previos hasta el proyecto básico, el cálculo se va perfeccionando en su nivel de eficiencia y precisión de la estimación, según la metodología aplicada: [aproximaciones sucesivas en intervalos finitos], siendo la hipótesis básica como anteriormente se ha avanzado, lograr una desviación máxima de una décima parte en el cálculo estimativo del predimensionado del coste real de obra. El cálculo del coste de ejecución material de la obra, se desarrolla en base a parámetros cúbicos funcionales “tridimensionales” del espacio proyectado y parámetros métricos constructivos “bidimensionales” de la envolvente exterior de cubierta/fachada y de la huella del edificio sobre el terreno. Los costes funcionales y constructivos se ponderan en cada fase del proceso de cálculo con sus parámetros “temáticos/específicos” de gestión (Pg), proyecto (Pp) y ejecución (Pe) de la concreta obra presupuestada, para finalmente estimar el coste de construcción por contrata, como resultado de incrementar al coste de ejecución material el porcentaje correspondiente al parámetro temático/especifico de la obra proyectada. El modelo de predimensionado de costes de construcción Pcr.5n, será una herramienta de gran interés y utilidad en el ámbito profesional, para la estimación del coste correspondiente al Proyecto Básico previsto en el marco técnico y legal de aplicación. Según el Anejo I del Código Técnico de la Edificación (CTE), es de obligado cumplimiento que el proyecto básico contenga una “Valoración aproximada de la ejecución material de la obra proyectada por capítulos”, es decir , que el Proyecto Básico ha de contener al menos un “presupuesto aproximado”, por capítulos, oficios ó tecnologías. El referido cálculo aproximado del presupuesto en el Proyecto Básico, necesariamente se ha de realizar mediante la técnica del predimensionado de costes, dado que en esta fase del proyecto arquitectónico aún no se dispone de cálculos de estructura, planos de acondicionamiento e instalaciones, ni de la resolución constructiva de la envolvente, por cuanto no se han desarrollado las especificaciones propias del posterior proyecto de ejecución. Esta estimación aproximada del coste de la obra, es sencilla de calcular mediante la aplicación práctica del modelo desarrollado, y ello tanto para estudiantes como para profesionales del sector de la construcción. Como se contiene y justifica en el presente trabajo, la aplicación práctica del modelo para el cálculo de costes en las fases preliminares del proyecto, es rápida y certera, siendo de sencilla aplicación tanto en vivienda unifamiliar (aisladas y pareadas), como en viviendas colectivas (bloques y manzanas). También, el modelo es de aplicación en el ámbito de la valoración inmobiliaria, tasaciones, análisis de viabilidad económica de promociones inmobiliarias, estimación de costes de obras terminadas y en general, cuando no se dispone del proyecto de ejecución y sea preciso calcular los costes de construcción de las obras proyectadas. Además, el modelo puede ser de aplicación para el chequeo de presupuestos calculados por el método analítico tradicional (estado de mediciones pormenorizadas por sus precios unitarios y costes descompuestos), tanto en obras de iniciativa privada como en obras promovidas por las Administraciones Públicas. Por último, como líneas abiertas a futuras investigaciones, el modelo de “predimensionado costes de referencia 5 niveles de cálculo”, se podría adaptar y aplicar para otros usos y tipologías diferentes a la residencial, como edificios de equipamientos y dotaciones públicas, valoración de edificios históricos, obras de urbanización interior y exterior de parcela, proyectos de parques y jardines, etc….. Estas lineas de investigación suponen trabajos paralelos al aquí desarrollado, y que a modo de avance parcial se recogen en las comunicaciones presentadas en los Congresos internacionales Scieconf/Junio 2013, Rics‐Cobra/Septiembre 2013 y en el IV Congreso nacional de patología en la edificación‐Ucam/Abril 2014. ABSTRACT The aim of this research is to develop a fast, efficient and accurate calculation model to estimate the final costs of construction, during the preliminary stages of the architectural project. It is a tool to be used during the preliminary study process, drafting and basic project. It is not therefore necessary to have the exact, graphic definition of the project in order to be able to calculate the cost‐scaling. It is assumed that no deviation 10% higher than the final cost of the projected work will occur during the implementation. To that purpose five levels of cost estimation are formulated in the scaling model, from a lower to a higher conceptual and graphic definition of the architectural project. The five calculation levels are: two that take as point of reference the ”exogenous” values of house sales (initial development and basic development), and three based on calculation of endogenous costs (preliminary study, drafting and basic project). The first ”exogenous” estimation level (level.1) is calculated over the market valuation of real estate development and the proportion the cost of land has over the value of the houses. The fifth level of valuation, also an ”exogenous” one (level.5) is calculated from the contrast between the basic external market value, the construction costs, and the estimated development costs of the projected work. This contrast between the ”repercussions of construction costs” and the market value is an innovation regarding the existing cost‐scaling models, as a methodological process of extrinsic verification and validation, of the accuracy and validity of the estimations obtained from the implementation of the model, which is called Pcr.5n (reference cost‐scaling with .5calculation levels according to the stage of project definition/ architectural conceptualization) The other three levels of “endogenous” construction cost‐scaling are estimated from internal analytical calculations by project units and synthetic calculations by construction systems and functional spaces. This is performed during the initial stages of the project corresponding to preliminary study process (level.2), drafting (level.3) and basic project (level.4). These theoretical internal calculations are finally evaluated and validated via implementation of the model in residential buildings, whose real costs on final payment of the works are known. As the level of definition and development of the project evolves, from preliminary study to basic project, the calculation improves in its level of efficiency and estimation accuracy, following the applied methodology: [successive approximations at finite intervals]. The basic hypothesis as above has been made, achieving a maximum deviation of one tenth, in the estimated calculation of the true cost of predimensioning work. The cost calculation for material execution of the works is developed from functional “three‐dimensional” cubic parameters for the planned space and constructive “two dimensional” metric parameters for the surface that envelopes around the facade and the building’s footprint on the plot. The functional and building costs are analyzed at every stage of the process of calculation with “thematic/specific” parameters of management (Pg), project (Pp) and execution (Pe) of the estimated work in question, and finally the cost of contractual construction is estimated, as a consequence of increasing the cost of material execution with the percentage pertaining to the thematic/specific parameter of the projected work. The construction cost‐scaling Pcr.5n model will be a useful tool of great interest in the professional field to estimate the cost of the Basic Project as prescribed in the technical and legal framework of application. According to the appendix of the Technical Building Code (CTE), it is compulsory that the basic project contains an “approximate valuation of the material execution of the work, projected by chapters”, that is, that the basic project must contain at least an “approximate estimate” by chapter, trade or technology. This approximate estimate in the Basic Project is to be performed through the cost‐scaling technique, given that structural calculations, reconditioning plans and definitive contruction details of the envelope are still not available at this stage of the architectural project, insofar as specifications pertaining to the later project have not yet been developed. This approximate estimate of the cost of the works is easy to calculate through the implementation of the given model, both for students and professionals of the building sector. As explained and justified in this work, the implementation of the model for cost‐scaling during the preliminary stage is fast and accurate, as well as easy to apply both in single‐family houses (detached and semi‐detached) and collective housing (blocks). The model can also be applied in the field of the real‐estate valuation, official appraisal, analysis of the economic viability of real estate developments, estimate of the cost of finished projects and, generally, when an implementation project is not available and it is necessary to calculate the building costs of the projected works. The model can also be applied to check estimates calculated by the traditional analytical method (state of measurements broken down into price per unit cost details), both in private works and those promoted by Public Authorities. Finally, as potential lines for future research, the “five levels of calculation cost‐scaling model”, could be adapted and applied to purposes and typologies other than the residential one, such as service buildings and public facilities, valuation of historical buildings, interior and exterior development works, park and garden planning, etc… These lines of investigation are parallel to this one and, by way of a preview, can be found in the dissertations given in the International Congresses Scieconf/June 2013, Rics‐Cobra/September 2013 and in the IV Congress on building pathology ‐Ucam/April 2014.