808 resultados para engineering projects management


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Software integration is a stage in a software development process to assemble separate components to produce a single product. It is important to manage the risks involved and being able to integrate smoothly, because software cannot be released without integrating it first. Furthermore, it has been shown that the integration and testing phase can make up 40 % of the overall project costs. These issues can be mitigated by using a software engineering practice called continuous integration. This thesis work presents how continuous integration is introduced to the author's employer organisation. This includes studying how the continuous integration process works and creating the technical basis to start using the process on future projects. The implemented system supports software written in C and C++ programming languages on Linux platform, but the general concepts can be applied to any programming language and platform by selecting the appropriate tools. The results demonstrate in detail what issues need to be solved when the process is acquired in a corporate environment. Additionally, they provide an implementation and process description suitable to the organisation. The results show that continuous integration can reduce the risks involved in a software process and increase the quality of the product as well.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The purpose of this study was to investigate the nature of co-operation between a project owner and an outside engineering consultant in combined heat and power plant implementation projects. Moreover, as another focal subject of the study was to familiarize the purchasing behavior of the energy producer and how an outside engineering consultant participated into different stages of the purchasing process. The study was carried out as a multiple case study including altogether six Finnish power plant implementation projects that had been taken into commercial use during 1995 – 2015. By adjusting the findings of empirical interview data and comparing those to the theoretical framework concerning, among others, Finnish energy production, engineering consulting businesses, delivery methods of construction project and finally the purchasing process, it can be concluded that especially in the power plant implementation projects in the past have a great influence to decisions made during the project. The role of the main engineering consultant is to act as an assistant, who helps to achieve the project goals successfully rather than an advisor who only knows how the project should be conducted. At least in these five project cases this was the case, meaning that the final decision power always remaining with project owner.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Project management has evolved in recent decades. Project portfolio management, together with multi project management, is an emerging area in the project management field in practice, and correspondingly in academic research and forums. In multi project management, projects cannot be handled isolated from each other, as they often have interdependencies that have to be taken into account. If the interdependencies between projects are evaluated during the selection process, the success rate of the project portfolio is increased. Interdependencies can be human resources, technological, and/or market based. Despite of the fact that interdependency as a phenomenon has roots in the 1960s and is related to famous management theories, it has not been much studied, although in practice most companies use it to great extent. There exists some research on interdependency, but prior publications have not emphasized the phenomenon per se, because a practical orientation practitioner techniques prevails in the literature. This research applies the method triangulation, electronic surveys and multiple case study. The research concentrates on small to large companies in Estonia and Finland, mainly in construction, engineering, ICT, and machinery industries. The literature review reveals that interdependencies are deeply involved in R&D and innovation. Survey analysis shows that companies are aware of interdependency issues in general, but they i have lack of detailed knowledge to use it thoroughly. Empirical evidence also indicates that interdependency techniques influence the success rate and other efficiency aspects to different extents. There are a lot of similarities in interdependency related managerial issues in companies of varying sizes and countries in Northern Europe. Differences found in the study are for instance the fact that smaller companies face more difficulties in implementing and evaluating interdependency procedures. Country differences between Estonia and Finland stem from working solutions to manage interdependencies on a daily basis.historical and cultural reasons, such as the special features of a transition country compared to a mature country. An overview of the dominant problems, best practices, and commonly used techniques associated with interdependency is provided in the study. Empirical findings show that many interdependency techniques are not used in practice. A multiple case study was performed in the study to find out how interdependencies are managed in real life on a daily basis. The results show that interdependencies are mostly managed in an informal manner. A description of managing the interdependencies and implementation procedures is given. Interdependency procedures are hard to implement, especially in smaller companies. Companies have difficulties in implementing interdependency procedures and evaluating them. The study contains detailed results on how companies have implemented working solutions to manage interdependencies on a daily basis

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Diplomityön tarkoituksena oli tutkia vaatimusten hallintaa suunnittelu- ja konsultointiyrityksen kannalta Suomen ydinvoimaprojekteissa keskittyen ydinturvallisuus- ja laatuvaatimuksiin. Ydinvoimaprojekteissa toimiminen on edellyttänyt menettelyohjeiden ja laatujärjestelmän uudelleen organisointia yrityksessä ja esiin on noussut haasteita liittyen muun muassa vaatimusten tunnistamiseen ja todentamiseen erityyppisissä ja erilaajuisissa projekteissa. Työ toteutettiin perehtymällä ydinvoimaan liittyvään lainsäädäntöön Suomessa, ohjeisiin ja standardeihin sekä haastattelemalla yrityksen omia asiantuntijoita. Viimeaikaisista sekä meneillään olevista projekteista kerättiin kokemuksia sekä arvioitiin ydinvoima projekteja varten laaditun projektin toteutusohjeen toimivuutta ja käytettävyyttä esimerkkiprojektin avulla. Suurimmiksi haasteiksi tunnistettiin lainsäädännöllisten vaatimusten, kuten ydinvoima- laitosohjeiden (YVL) muuttuminen ja tulkinnanvaraisuus sekä asiakkaiden perehtymät- tömyys Suomen lainsäädäntöön ja vaatimustasoon liittyen ydinturvallisuuteen. Työn tuloksena tunnistettiin hyviä vaatimusten hallintaan liittyviä projektinhallintaa ja ydin- turvallisuutta edistäviä asioita, kuten vaatimusten täsmentäminen jo sopimustasolla sekä niiden täyttymisen seuranta projektin aikana. Erillisen vaatimustietokannan luomista ydinvoimaprojekteja varten tutkittiin, mutta siitä luovuttiin teknisten vaatimusten osalta kannattamattomana, sillä standardien ja vaatimusten määrä kasvoi niin suureksi, että niiden hallitseminen vaatisi enemmän työtä kuin mitä projektien taso yleensä sallisi.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This thesis focuses on integration in project business, i.e. how projectbased companies organize their product and process structures when they deliver industrial solutions to their customers. The customers that invest in these solutions run their businesses in different geographical, political and economical environments, which should be acknowledged by the supplier when providing solutions comprising of larger and more complex scopes than previously supplied to these customers. This means that the suppliers are increasing their supply range by taking over some of the activities in the value chain that have traditionally been handled by the customer. In order to be able to provide the functioning solutions, including more engineering hours, technical equipment and a wider project network, a change is needed in the mindset in order to be able to carry out and take the required responsibility that these new approaches bring. For the supplier it is important to be able to integrate technical products, systems and services, but the supplier also needs to have the capabilities to integrate the cross-functional organizations and departments in the project network, the knowledge and information between and within these organizations and departments, along with inputs from the customer into the product and process structures during the lifecycle of the project under development. Hence, the main objective of this thesis is to explore the challenges of integration that industrial projects meet, and based on that, to suggest a concept of how to manage integration in project business by making use of integration mechanisms. Integration is considered the essential process for accomplishing an industrial project, whereas the accomplishment of the industrial project is considered to be the result of the integration. The thesis consists of an extended summary and four papers, that are based on three studies in which integration mechanisms for value creation in industrial project networks and the management of integration in project business have been explored. The research is based on an inductive approach where in particular the design, commissioning and operations functions of industrial projects have been studied, addressing entire project life-cycles. The studies have been conducted in the shipbuilding and power generation industries where the scopes of supply consist of stand-alone equipment, equipment and engineering, and turnkey solutions. These industrial solutions include demanding efforts in engineering and organization. Addressing the calls for more studies on the evolving value chains of integrated solutions, mechanisms for inter- and intra-organizational integration and subsequent value creation in project networks have been explored. The research results in thirteen integration mechanisms and a typology for integration is proposed. Managing integration consists of integrating the project network (the supplier and the sub-suppliers) and the customer (the customer’s business purpose, operations environment and the end-user) into the project by making use of integration mechanisms. The findings bring new insight into research on industrial project business by proposing integration of technology and engineering related elements with elements related to customer oriented business performance in contemporary project environments. Thirteen mechanisms for combining products and the processes needed to deliver projects are described and categorized according to the impact that they have on the management of knowledge and information. These mechanisms directly relate to the performance of the supplier, and consequently to the functioning of the solution that the project provides. This thesis offers ways to promote integration of knowledge and information during the lifecycle of industrial projects, enhancing the development towards innovative solutions in project business.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Agile methods have become increasingly popular in the field of software engineering. While agile methods are now generally considered applicable to software projects of many different kinds, they have not been widely adopted in embedded systems development. This is partly due to the natural constraints that are present in embedded systems development (e.g. hardware–software interdependencies) that challenge the utilization of agile values, principles and practices. The research in agile embedded systems development has been very limited, and this thesis tackles an even less researched theme related to it: the suitability of different project management tools in agile embedded systems development. The thesis covers the basic aspects of many different agile tool types from physical tools, such as task boards and cards, to web-based agile tools that offer all-round solutions for application lifecycle management. In addition to these two extremities, there is also a wide range of lighter agile tools that focus on the core agile practices, such as backlog management. Also other non-agile tools, such as bug trackers, can be used to support agile development, for instance, with plug-ins. To investigate the special tool requirements in agile embedded development, the author observed tool related issues and solutions in a case study involving three different companies operating in the field of embedded systems development. All three companies had a distinct situation in the beginning of the case and thus the tool solutions varied from a backlog spreadsheet built from scratch to plug-in development for an already existing agile software tool. Detailed reports are presented of all three tool cases. Based on the knowledge gathered from agile tools and the case study experiences, it is concluded that there are tool related issues in the pilot phase, such as backlog management and user motivation. These can be overcome in various ways epending on the type of a team in question. Finally, five principles are formed to give guidelines for tool selection and usage in agile embedded systems development.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The purpose of this thesis is to find development areas for site operations in power plant construction projects delivered by Wärtsilä. The inspected operations are subcontractor management, site material management and work scheduling. The contractor's role in EPC project is to respond for engineering, procurement, and construction supervision. Geographical and cultural differences brings challenges for finding development areas as Wärtsilä delivers projects world-wide. Searching for development area is mainly made with survey, which answers were collected from the target company's site personnel. Based on the results, with good planning and preparation various problems would be avoided. An external view for the thesis was collected by an expert interview, which was held to three expe-rienced construction operating executives. Interviewees believed that with the se-lection of right site personnel and clearly defined areas of responsibility will great-ly affect the outcome of the project. Some of the theory has been collected from areas, which have helped to under-stand the inspected operations on site. Improving competence knowledge has been important due to the broad scope of work and the author’s inexperience of the topic. Also generally effective practices from construction projects has been col-lected to the theory part. Functionality of general practices have been reflected together with the results of empirically collected data for Wärtsilä's projects. As a result, a model was generated where development proposals and the benefits from new procedures were presented.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This research studied the project performance measurement from the perspective of strategic management. The objective was to find a generic model for project performance measurement that emphasizes strategy and decision making. Research followed the guidelines of a constructive research methodology. As a result, the study suggests a model that measures projects with multiple meters during and after projects. Measurement after the project is suggested to be linked to the strategic performance measures of a company. The measurement should be conducted with centralized project portfolio management e.g. using the project management office in the organization. Metrics, after the project, measure the project’s actual benefit realization. During the project, the metrics are universal and they measure the accomplished objectives relation to costs, schedule and internal resource usage. Outcomes of these measures should be forecasted by using qualitative or stochastic methods. Solid theoretical background for the model was found from the literature that covers the subjects of performance measurement, projects and uncertainty. The study states that the model can be implemented in companies. This statement is supported by empirical evidence from a single case study. The gathering of empiric evidence about the actual usefulness of the model in companies is left to be done by the evaluative research in the future.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The aim of this Master’s Thesis is to develop project logistics functions in large scale en-gineering, procurement and construction projects. The background of the research topic is compounded from two separate subjects; OPAL Program and case study of an actual EPC project. The purpose is to examine Project Logistics process in accordance with OPAL Program as well as logistics process in focus EPC project. Both entities are researched by using the case study research methodology. Logistics process of the focus EPC project is described as well as presented and in addi-tion, logistics related findings and observations are introduced. Significant findings and observations are found from logistics costs as well as shipment volume estimations in the early phase of the focus ECP project. A notable finding is also that because goods were transported as readily assembled as possible it caused expensive oversized cargo deliveries. From findings and observation of the focus EPC project it can be derived that logistics has to be involved in the early sales phase in order to receive more accurate logistics cost esti-mations for project deliveries. It is also noticed that in order to obtain savings in logistics costs, oversized deliveries must be avoided.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The importance of Technology Transfer activities of companies is underpinned by the changes in technological and economic environments. However, there is still a significant gap in defining possible ways for Technology Transfer projects effectiveness improvement. The Master’s Thesis overviews common problems faced by the companies in implementation of Technology Transfer projects and examines Lean management principles as possible way to improve its effectiveness. Based on the analysis of the relevant scientific literature and results of the survey, conducted among the firms of different types, the approach to Technology Transfer projects implementation with the use of Lean management principles is proposed. The approach serves to solve some of the important problems faced by the managers of Technology Transfer projects. It is envisaged that this approach can help to increase overall Technology Transfer projects’ effectiveness.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The present study is intended to provide a new scientific approach to the solution of the worlds cost engineering problems encountered in the chemical industries in our nation. The problem is that of cost estimation of equipments especially of pressure vessels when setting up chemical industries .The present study attempts to develop a model for such cost estimation. This in turn is hoped would go a long way to solve this and related problems in forecasting the cost of setting up chemical plants.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

by Daniel K. Moon.