906 resultados para Project management offices
Resumo:
The research investigates the feasibility of using web-based project management systems for dredging. To achieve this objective the research assessed both the positive and negative aspects of using web-based technology for the management of dredging projects. Information gained from literature review and prior investigations of dredging projects revealed that project performance, social, political, technical, and business aspects of the organization were important factors in deciding to use web-based systems for the management of dredging projects. These factors were used to develop the research assumptions. An exploratory case study methodology was used to gather the empirical evidence and perform the analysis. An operational prototype of the system was developed to help evaluate developmental and functional requirements, as well as the influence on performance, and on the organization. The evidence gathered from three case study projects, and from a survey of 31 experts, were used to validate the assumptions. Baselines, representing the assumptions, were created as a reference to assess the responses and qualitative measures. The deviation of the responses was used to evaluate for the analysis. Finally, the conclusions were assessed by validating the assumptions with the evidence, derived from the analysis. The research findings are as follows: 1. The system would help improve project performance. 2. Resistance to implementation may be experienced if the system is implemented. Therefore, resistance to implementation needs to be investigated further and more R&D work is needed in order to advance to the final design and implementation. 3. System may be divided into standalone modules in order to simplify the system and facilitate incremental changes. 4. The QA/QC conceptual approach used by this research needs to be redefined during future R&D to satisfy both owners and contractors. Yin (2009) Case Study Research Design and Methods was used to develop the research approach, design, data collection, and analysis. Markus (1983) Resistance Theory was used during the assumptions definition to predict potential problems to the implementation of web-based project management systems for the dredging industry. Keen (1981) incremental changes and facilitative approach tactics were used as basis to classify solutions, and how to overcome resistance to implementation of the web-based project management system. Davis (1989) Technology Acceptance Model (TAM) was used to assess the solutions needed to overcome the resistances to the implementation of web-base management systems for dredging projects.
Resumo:
The aim of this text is to discuss how it is possible to manage the art creating process in a film project, where the circumstances are often turbulent. In normative project management literature one proceeds from the idea that a project is realised in a stable world from a clear goal. In a film project there is often a need to change your plans, to improvise both in front of the camera as well as behind the camera. In the theoretical cinematic literature the responsibility for the final film text is more and more being viewed as a product of not only the director, but of the whole team’s work. Consequently, the narrative of leadership/management in a film team can be viewed from a relational perspective where the director and those s/he interacts with, are responsible for the action, relations and social situations they construe jointly in the process of filmmaking. The organization of a film project is a temporary one. The members of a team are seldom the same from one production to another, as well as the creative process always being unique. According to process thinking, organizing can be seen as the ongoing creative activity where we structure and stabilize the chaotic, moving reality. As concerns a film project, the process of becoming of the filmic expression; careful plans, on the one hand, and improvisation and flexibility in action, on the other hand, are a precondition for its realisation. The director when setting a linguistic formulation to what is to be done, can be considered as a practical author.
Resumo:
The universities rely on the Information Technology (IT) projects to support and enhance their core strategic objectives of teaching, research, and administration. The researcher’s literature review found that the level of IT funding and resources in the universities is not adequate to meet the IT demands. The universities received more IT project requests than they could execute. As such, universities must selectively fund the IT projects. The objectives of the IT projects in the universities vary. An IT project which benefits the teaching functions may not benefit the administrative functions. As such, the selection of an IT project is challenging in the universities. To aid with the IT decision making, many universities in the United States of America (USA) have formed the IT Governance (ITG) processes. ITG is an IT decision making and accountability framework whose purpose is to align the IT efforts in an organization with its strategic objectives, realize the value of the IT investments, meet the expected performance criteria, and manage the risks and the resources (Weil & Ross, 2004). ITG in the universities is relatively new, and it is not well known how the ITG processes are aiding the nonprofit universities in selecting the right IT projects, and managing the performance of these IT projects. This research adds to the body of knowledge regarding the IT project selection under the governance structure, the maturity of the IT projects, and the IT project performance in the nonprofit universities. The case study research methodology was chosen for this exploratory research. The convenience sampling was done to choose the cases from two large, research universities with decentralized colleges, and two small, centralized universities. The data were collected on nine IT projects from these four universities using the interviews and the university documents. The multi-case analysis was complemented by the Qualitative Comparative Analysis (QCA) to systematically analyze how the IT conditions lead to an outcome. This research found that the IT projects were selected in the centralized universities in a more informed manner. ITG was more authoritative in the small centralized universities; the ITG committees were formed by including the key decision makers, the decision-making roles, and responsibilities were better defined, and the frequency of ITG communication was higher. In the centralized universities, the business units and colleges brought the IT requests to ITG committees; which in turn prioritized the IT requests and allocated the funds and the resources to the IT projects. ITG committee members in the centralized universities had a higher awareness of the university-wide IT needs, and the IT projects tended to align with the strategic objectives. On the other hand, the decentralized colleges and business units in the large universities were influential and often bypassed the ITG processes. The decentralized units often chose the “pet” IT projects, and executed them within a silo, without bringing them to the attention of the ITG committees. While these IT projects met the departmental objectives, they did not always align with the university’s strategic objectives. This research found that the IT project maturity in the university could be increased by following the project management methodologies. The IT project management maturity was found higher in the IT projects executed by the centralized university, where a full-time project manager was assigned to manage the project, and the project manager had a higher expertise in the project management. The IT project executed under the guidance of the Project Management Office (PMO) has exhibited a higher project management maturity, as the PMO set the standards and controls for the project. The IT projects managed by the decentralized colleges by a part-time project manager with lower project management expertise have exhibited a lower project management maturity. The IT projects in the decentralized colleges were often managed by the business, or technical leads, who often lacked the project management expertise. This research found that higher the IT project management maturity, the better is the project performance. The IT projects with a higher maturity had a lower project delay, lower number of missed requirements, and lower number of IT system errors. This research found that the quality of IT decision in the university could be improved by centralizing the IT decision-making processes. The IT project management maturity could be improved by following the project management methodologies. The stakeholder management and communication were found critical for the success of the IT projects in the university. It is hoped that the findings from this research would help the university leaders make the strategic IT decisions, and the university’s IT project managers make the IT project decisions.
Resumo:
The increasing emphasis on aid effectiveness, accountability and impact measurement in international development and humanitarian work has generated a requirement for high quality internal systems for the management of programmes. To help to address this requirement, Trócaire adopted Results Based Management in the 20 countries in which it works. This paper provides an overview of Trócaire’s RBM journey, including the process of embedding the new approach in the organisation, lessons learnt from this process, the subsequent benefits that are emerging at field programme level and the challenges going forward.
Resumo:
Short time-to-market is a key success factor in the todays’ dynamic business environment and many companies are trying to improve their product development processes. A challenge is to develop products according to the time plan and at the same time keeping the cost low and the quality high. This study focuses on the project management within the product development process in an automotive industry. The background of this study started as a request from the research and development department at the automotive company, which led to the following questions; 1) what are the most crucial factors for project success? 2) How can these factors contribute to a more successful outcome? 3) How can project management decrease product development lead time by sharing knowledge? The research approach is a case study and the data collection consist of interviews and questioners at two companies connected to project management in product development projects. Spider charts are created from the collected data containing eleven dimensions to show similarities and differences between the project managers working within the research and development department as well as between the two companies. The main conclusions are that there is a need to allow a certain level of flexibility when managing projects, in order to more easily handle late changes. Being involved in a project from the concept phase could facilitate the product development activities later on, due to a deeper understanding regarding previous decisions. Further, knowledge sharing methods, such as databases, has to be designed to be suitable for a specific organization and user friendly which enables the users to more easily search for specific types of knowledge. Lastly, a low level on the detailed focus is shown to be another success factor, however, in some cases there is still a need of this detailed focus to solve specific problems but the details may never become a higher focus than the holistic view.
Resumo:
History has shown that projects move in and out of poor status through the life of the project. Predicting the success or failure of a project to complete on time because of its recent history on the contract status report could provide our project managers another tool for monitoring contract progress. In many instances, poor contract progress results in the loss of contract time and late completion of projects. This research evaluates the combinations of work type, point in time physical work begins, recent poor status, and contract bid amount as indicators of late project completion.
Resumo:
Thousands of Free and Open Source Software Projects (FSP) were, and continually are, created on the Internet. This scenario increases the number of opportunities to collaborate to the same extent that it promotes competition for users and contributors, who can guide projects to superior levels, unachievable by founders alone. Thus, given that the main goal of FSP founders is to improve their projects by means of collaboration, the importance to understand and manage the capacity of attracting users and contributors to the project is established. To support researchers and founders in this challenge, the concept of attractiveness is introduced in this paper, which develops a theoretical-managerial toolkit about the causes, indicators and consequences of attractiveness, enabling its strategic management.
Resumo:
This article presents an extensive investigation carried out in two technology-based companies of the So Carlos technological pole in Brazil. Based on this multiple case study and literature review, a method, entitled hereafter IVPM2, applying agile project management (APM) principles was developed. After the method implementation, a qualitative evaluation was carried out by a document analysis and questionnaire application. This article shows that the application of this method at the companies under investigation evidenced the benefits of using simple, iterative, visual, and agile techniques to plan and control innovative product projects combined with traditional project management best practices, such as standardization.
Resumo:
This paper puts forward the argument that PM is spreading because it is a well adapted collection of memes, and that the Project Management Institute (PMI®) Guide to the Project Management Body of Knowledge (PMBOK® Guide) version of project management (the PM_BOK Code) has more to do with the appearance of a capability for productivity than it does with actual productivity. It suggests that project management is evolving in a toxic manner, and that corporations will reap more benefit from it than people. The paper concludes with a call for a reformation of the PMBOK®.
Resumo:
The diffusion of Pollution Prevention faces organizational barriers as for instance resistance to change, insufficient support from decision-makers, unclear project leadership, insufficient employee accountability and inflexible organizational structures. To understand how to overcome such barriers, the performance of a Pollution Prevention program of a multinational corporation is analyzed. The quantitative analyses of 2096 Pollution Prevention projects conducted between 1995 and 2007 support the conclusion that the performance of the Pollution Prevention program increased after the implementation of the Six Sigma program. Moreover, the analyses of 1906 Pollution Prevention projects and 31,133 Six Sigma projects for cost reduction in 27 countries indicate that in countries where the implementation of Six Sigma is more expressive, pollution is prevented more than in countries with less expressive Six Sigma implementation. In fact, the Six Sigma implementation improved the organizational capability for data based project management. Therefore, comparing six years before and six years after the Six Sigma implementation, the total number of Pollution Prevention projects recognized increased 6.9 times and the total amount of pollution prevented increased by 62%. The qualitative analysis describes how the Six Sigma program interacts with the Pollution Prevention program in the studied company. (C) 2009 Elsevier Ltd. All rights reserved.
Resumo:
A concep????o do Planejamento Estrat??gico Municipal visa substituir o pensamento est??tico da administra????o pela ideia din??mica do gerenciamento. No centro desse m??todo encontra-se o Planejamento Estrat??gico, o qual foi adaptado ??s condi????es espec??ficas da administra????o p??blica no Brasil e que deve ser complementado por uma vis??o de gerenciamento de projetos e por t??cnicas de trabalho participativas, transparentes e din??micas
Resumo:
In a Europe increasingly aging, it is now recognized the importance and potential of the service industry for ageing well based on information and communication technologies (ICT), as exemplified by the electronic market of social services and health care, the GuiMarket, proposed by the authors. However, this new range of services requires that individuals have advanced digital skills to fully participate in society. Based on the results of a survey made on a sample of 315 individuals, this paper discusses the importance granted GuiMarket and the intended frequency of use, concluding there is a close relationship between ICT access and use that respondents anticipate making of GuiMarket and alike services.
Resumo:
Several studies suggest that computer-mediated communication can lead to decreases in group effectiveness and reduce satisfaction levels in terms of trust and comfort of its users. Supported by an experiment, where the emotional or affective aspects of communication were tested with the experimentation of two architectures, Direct Communication Architecture (DCA) and the Virtual Communication Architecture (VCA) this paper validates the thesis that, from the users’ perspective, there is no opposition to the acceptance of virtual environments and interfaces for communication, and that these environments are able to cope with the reconfiguration dynamics requirements of virtual teams or client-server relations in a virtual enterprise operation.
Resumo:
O trabalho que a seguir se apresenta tem como objectivo descrever a criação de um modelo que sirva de suporte a um sistema de apoio à decisão sobre o risco inerente à execução de projectos na área das Tecnologias de Informação (TI) recorrendo a técnicas de mineração de dados. Durante o ciclo de vida de um projecto, existem inúmeros factores que contribuem para o seu sucesso ou insucesso. A responsabilidade de monitorizar, antever e mitigar esses factores recai sobre o Gestor de Projecto. A gestão de projectos é uma tarefa difícil e dispendiosa, consome muitos recursos, depende de numerosas variáveis e, muitas vezes, até da própria experiência do Gestor de Projecto. Ao ser confrontado com as previsões de duração e de esforço para a execução de uma determinada tarefa, o Gestor de Projecto, exceptuando a sua percepção e intuição pessoal, não tem um modo objectivo de medir a plausibilidade dos valores que lhe são apresentados pelo eventual executor da tarefa. As referidas previsões são fundamentais para a organização, pois sobre elas são tomadas as decisões de planeamento global estratégico corporativo, de execução, de adiamento, de cancelamento, de adjudicação, de renegociação de âmbito, de adjudicação externa, entre outros. Esta propensão para o desvio, quando detectada numa fase inicial, pode ajudar a gerir melhor o risco associado à Gestão de Projectos. O sucesso de cada projecto terminado foi qualificado tendo em conta a ponderação de três factores: o desvio ao orçamentado, o desvio ao planeado e o desvio ao especificado. Analisando os projectos decorridos, e correlacionando alguns dos seus atributos com o seu grau de sucesso o modelo classifica, qualitativamente, um novo projecto quanto ao seu risco. Neste contexto o risco representa o grau de afastamento do projecto ao sucesso. Recorrendo a algoritmos de mineração de dados, tais como, árvores de classificação e redes neuronais, descreve-se o desenvolvimento de um modelo que suporta um sistema de apoio à decisão baseado na classificação de novos projectos. Os modelos são o resultado de um extensivo conjunto de testes de validação onde se procuram e refinam os indicadores que melhor caracterizam os atributos de um projecto e que mais influenciam o risco. Como suporte tecnológico para o desenvolvimento e teste foi utilizada a ferramenta Weka 3. Uma boa utilização do modelo proposto possibilitará a criação de planos de contingência mais detalhados e uma gestão mais próxima para projectos que apresentem uma maior propensão para o risco. Assim, o resultado final pretende constituir mais uma ferramenta à disposição do Gestor de Projecto.