Evaluating an Agile Method for Planning and Controlling Innovative Projects


Autoria(s): CONFORTO, Edivandro Carlos; AMARAL, Daniel Capaldo
Contribuinte(s)

UNIVERSIDADE DE SÃO PAULO

Data(s)

18/10/2012

18/10/2012

2010

Resumo

This article presents an extensive investigation carried out in two technology-based companies of the So Carlos technological pole in Brazil. Based on this multiple case study and literature review, a method, entitled hereafter IVPM2, applying agile project management (APM) principles was developed. After the method implementation, a qualitative evaluation was carried out by a document analysis and questionnaire application. This article shows that the application of this method at the companies under investigation evidenced the benefits of using simple, iterative, visual, and agile techniques to plan and control innovative product projects combined with traditional project management best practices, such as standardization.

Identificador

PROJECT MANAGEMENT JOURNAL, v.41, n.2, p.73-80, 2010

8756-9728

http://producao.usp.br/handle/BDPI/17835

10.1002/pmj.20089

http://dx.doi.org/10.1002/pmj.20089

Idioma(s)

eng

Publicador

WILEY PERIODICALS, INC

Relação

Project Management Journal

Direitos

closedAccess

Copyright WILEY PERIODICALS, INC

Palavras-Chave #agile project management method #project planning and controlling #innovative product projects
Tipo

article

original article

publishedVersion