816 resultados para Project-based Organization
Resumo:
Background: Currently in the Australian higher education sector higher productivity from allied health clinical education placements are a contested issue. This paper will report results of a study that investigated output changes associated with occupational therapy and nutrition/dietetics clinical education placements in Queensland, Australia. Supervisors’ and students’ time use during placements and how this changes for supervisors compared to when students are not present in the workplace is also presented. Methodology/Principal Findings: A cohort design was used with students from four Queensland universities, and their supervisors employed by Queensland Health. There was an increasing trend in the number of occasions of service delivered when the students were present, and a statistically significant increase in the daily mean length of occasions of service delivered during the placement compared to pre-placement levels. For project-based placements that were not directly involved in patient care, supervisors’ project activity time decreased during placements, with students undertaking considerably more time in project activities. Conclusions/Significance: A novel method for estimating productivity and time use changes during clinical education programs for allied health disciplines has been applied. During clinical education placements there was a net increase in outputs, suggesting supervisors engage in longer consultations with patients for the purpose of training students, while maintaining patient numbers. Other activities are reduced. This paper is the first time these data have been shown and form a good basis for future assessments of the economic impact of student placements for allied health disciplines.
Resumo:
A considerable amount of research has confirmed the relationship between organizational culture and knowledge sharing behaviours. However, less research has been conducted on the impact of project sub-cultures in relation to the sharing of knowledge between projects, particularly in project based organizations (PBOs). The unique structures and contexts characterized by PBOs indicate the need to investigate further the impact of cultures present within PBOs and their effect on knowledge sharing. We report on a rich case study of four large Australian-based PBOs whereby the cultural values of these large organizations were seen to impact significantly on whether project teams were more or less likely to improve inter-project knowledge sharing. Furthermore, this research demonstrates the utility of using Cameron and Quinn's (2005) Competing Values Framework to evaluate culture in the context of PBOs
Resumo:
A firm, as a dynamic, evolving, and quasi-autonomous system of knowledge production and application, develops knowledge management capability (KMC) through strategic learning in order to sustain competitive advantages in a dynamic environment. Knowledge governance mechanisms and knowledge processes connect and interact with each other forming learning mechanisms, which carry out double loop learning that drives genesis and evolution of KMC to modify operating routines that effect desired performance. This paper reports a study that was carried out within a context of construction contractors, a type of project-based firms, operating within the dynamic Hong Kong construction market. A multiple-case design was used to incorporate evidence from the literature and interviews, with the help of system dynamics modeling, to visualize the evolution of KMC. The study demonstrates the feasibility to visualize how a firm's KMC matches its operating environment over time. The findings imply that knowledge management (KM) applications can be better planned and controlled through evaluation of KM performance over time from a capability perspective.
Resumo:
Knowledge Management (KM) is a process that focuses on knowledge-related activities to facilitate knowledge creation, capture, transformation and use, with the ultimate aim of leveraging organisations’ intellectual capital to achieve organisational objectives. Organisational culture and climate have been identified as major catalysts to knowledge creation and sharing, and hence are considered important dimensions of KM research. The fragmented and hierarchical nature of the construction industry illustrates its difficulties to operate in a co-ordinated and homogeneous way when dealing with knowledge-related issues such as research and development, training and innovation. The culture and climate of organisations operating within the construction industry are profoundly shaped by the long-established characteristics of the industry, whilst also being influenced by the changes within the sector. Meanwhile, the special project-based structure of construction organisations constitutes additional challenges in facing knowledge production. The study this paper reports on addresses the impact of organisational culture and climate on the intensity of KM activities within construction organisations, with specific focus on the managerial activities that help to manage these challenges and to facilitate KM. A series of semi-structured interviews were undertaken to investigate the KM activities of the contractors operating in Hong Kong. The analysis on the qualitative data revealed that leadership on KM, innovation management, communication management and IT development were key factors that impact positively on the KM activities within the organisations under investigation.
Resumo:
An upper primary multiliteracies project based on the children’s book “Pearl Barley and Charlie Parsley” by Aaron Blabey. The main theme explored is same and different.
Resumo:
Aim This study aimed to demonstrate how supervisors and students use their time during the three domains of nutrition and dietetic clinical placement and to what extent patient care and non-patient activities change during placement compared to pre- and post- placement. Methods A cohort survey design was used with students from two Queensland universities, and their supervisors in 2010. Participants recorded their time use in either a paper-based or an electronic survey. Supervisors’ and students’ time-use was calculated as independent daily means according to time use categories reported over the length of the placement. Mean daily number of occasions of service, length of occasions of service, project and other time use in minutes was reported as productivity output indicators and the data imputed. A linear mixed modelling approach was used to describe the relationship between the stage of placement and time use in minutes. Results Combined students’ (n= 21) and supervisors’ (n=29) time use as occasions of service or length of occasions of service in patient care activities were significantly different pre, during and post placement. On project-based placements in food service management and community public health nutrition, supervisors’ project activity time significantly decreased during placements with students undertaking more time in project activities. Conclusions This study showed students do not reduce occasions of service in patient care and they enhance project activities in food service and community public health nutrition while on placement. A larger study is required to confirm these results.
Resumo:
Construction works are project-based and interdisciplinary. Many construction management (CM) problems are ill defined. The knowledge required to address such problems is not readily available and mostly tacit in nature. Moreover, the researchers, especially the students in the higher education, often face difficulty in defining the research problem, adopting an appropriate research process and methodology for designing and validating their research. This paper describes a ‘Horseshoe’ research process approach and its application to address a research problem of extracting construction-relevant information from a building information model (BIM). It describes the different steps of the process for understanding a problem, formulating appropriate research question/s, defining different research tasks, including a methodology for developing, implementing and validating the research. It is argued that a structure research approach and the use of mixed research methods would provide a sound basis for research design and validation in order to make contribution to existing knowledge.
Resumo:
This paper reviews innovation activity in a key service industry – road and bridge construction. Based on a large-scale Australian survey and descriptive statistics, the paper finds that there is little difference in innovation levels between different types of industry participants and that innovation is difficult to implement. The survey gathered responses from suppliers, consultants, contracts and clients and compared results across these four industry sectors. The absorptive capacity and relationship capacities of respondents were also investigated. One in five respondents had poor absorptive capacity. Suppliers were found to the most effective learners and were the best adopters of ideas from outside their organisations and consultants were the least effective. Australian construction organisations have relatively good relationship skills because relationship-based contracts are common compared to other countries. Indeed, the survey found that nearly 60% of respondents had experience with such contracts, with clients having more experience than the other three sectors. The results have implications for the measurement of innovation in project-based industries, and the relative roles of clients and suppliers in driving innovation in the construction industry. Further research will examine the extent to which particular governance mechanisms within relationship contracts lead to improved innovation and project performance.
Resumo:
Retired business professionals represent an unexplored source of skill support for struggling rural communities. This research examined the feasibility of drawing on this valuable pool of knowledge and experience by engaging retirees in short term, project based volunteering roles in rural, not for profit agencies. Using the theory of planned behaviour and the functional approach to volunteering, the program of study generated a model comprising the key psychological and contextual factors determining the volunteers' decision to provide skill assistance in rural settings. The model provides a useful resource for creating suitable volunteering opportunities and for informing volunteer recruitment strategies.
Resumo:
The interaction between head contractor and subcontractor in modern construction often contributes to the degree of success or failure of any large-scale construction project. In this paper, previous research on the relationship and interaction between head contractor and subcontractor is examined in order to establish how these relationships will affect the overall performance of a project. Based on the review, research questions on how to best manage the interaction and relationship between these two vital project participants are proposed and future research direction discussed.
Resumo:
An electricity demand reduction project based on comprehensive residential consumer engagement was established within an Australian community in 2008. By 2011, both the peak demand and grid supplied electricity consumption had decreased to below pre-intervention levels. This case study research explored the relationship developed between the utility, community and individual consumer from the residential customer perspective through qualitative research of 22 residential households. It is proposed that an energy utility can be highly successful at peak demand reduction by becoming a community member and a peer to residential consumers and developing the necessary trust, access, influence and partnership required to create the responsive environment to change. A peer-community approach could provide policymakers with a pathway for implementing pro-environmental behaviour for low carbon communities, as well as peak demand reduction, thereby addressing government emission targets while limiting the cost of living increases from infrastructure expenditure.
Resumo:
Occupational segregation is a major source of labour market rigidity and economic inefficiency due to a waste of human resources. Organisations are repeatedly recognised as gendered constructs exhibiting sustained work segregation, income and status inequality, as well as cultural and individual images of gender, and these are perpetuated through their processes, practices and pressures (Acker, 1990). A large percentage of Australia’s workforce is now employed in project-based or project-oriented organisations, leading to the claim that Australia is a project-based economy. For a continued strong performance in this economy, organisations that employ project personnel will need to consider how they address inclusivity and equality in diversity in project based temporary organisations to ensure the supply of high quality project professionals into the future. This paper investigates the inclusion processes experienced and exercised by men and women working in temporary organisations in project situations through a review of reports on the inclusion processes experienced by 60 project managers and project workers in three project based industries in Australia. Results indicate that temporary organisations are not implementing equality and diversity management strategies at the macro level and project workers are accepting this lack of recognition. However inclusivity and equality at the micro level of the team is seen as vital.
Resumo:
The centrality of knowledge sharing to organisations' sustainability has been established. This case study illustrates the influences on individual knowledge sharing decision-making and behaviour among professionals and paraprofessionals - specifically civil engineers and design drafters - in a large public sector organisation that provides transportation infrastructure. The case examines the ways in which overlapping sets of values and behavioural drivers affect knowledge sharing orientation and practices in a collective of experts and novices working in an environment that is largely project-based. The alignment among sector, profession and organisation values provides a supportive environment for knowledge sharing, however individual behaviour is found to be most strongly influenced by the presence and quality of relational capital.
Resumo:
While the studio environment has been promoted as an ideal educational setting for project-based disciplines, few qualitative studies have been undertaken in a comprehensive way (Bose, 2007). This study responds to this need by adopting Grounded Theory methodology in a qualitative comparative approach. The research aims to explore the limitations and benefits of a face-to-face (f2f) design studio as well as a virtual design studio (VDS) as experienced by architecture students and educators at an Australian university in order to find the optimal combination for a blended environment to maximize learning. The main outcome is a holistic multidimensional blended model being sufficiently flexible to adapt to various setting, in the process, facilitating constructivist learning through self-determination, self-management, and personalization of the learning environment.
Resumo:
Recent literature acknowledges the need for new career development models to support the way that careers evolve in the 21st century workplace (Bloch 2005). This is particularly so within temporary organisation forms, and for those pursuing a career in project management (Hölzle 2010). Our research, explores how project managers working on projects and within temporary organisation forms and those working on project-linked contracts access the development opportunities they require to remain employable in an era of project-by-project employment. Set in Australia where a project-based economy (Crawford, French and Lloyd-Walker 2013) and contract work have led to casualisation of the workforce (Connell & Burgess, 2006; McKeown & Hanley (2009) the results suggest new approaches to career development may be required.