134 resultados para performance management system
em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland
Resumo:
The purpose of the study is to determine general features of the supply chain performance management system, to assess the current state of performance management in the case company mills and to make proposals for improvement – how the future state of performance management system would look like. The study covers four phases which consist of theory and case company parts. Theoretical review gives understanding about performance management and measurement. Current state analysis assesses the current state of performance management in the mills. Results and proposals for improvement are derived from current state analysis and finally the conclusions with answers to research questions are presented. Supply chain performance management system consists of five areas: perfor-mance measurement and metrics, action plans, performance tracking, performance dialogue and rewards, consequences and actions. The result of the study revealed that all mills were quite average level in performance management and there is a room for improvement. Created performance improvement matrix served as a tool in assessing current performance management and could work also as a tool in the future in mapping the current state after transformation process. Limited harmonization was revealed as there were different ways to work and manage performance in the mills. Lots of good ideas existed though actions are needed to make a progress. There is also need to harmonize KPI structure.
Resumo:
This Master’s Thesis studies performance management system and its benefits, risks and costs. Objective of the thesis is to describe and evaluate currently used supply chain performance management system (SCPMS) in a Finnish paper mill and its interfaces with its business unit’s SCPMS. As a result, the host company has improvement road map for improving its SCPMS. Used SCPMS in the host company and its interfaces to business unit’s SCPMS are described based on interviews held in the host company and the business unit. Evaluation of the host company’s SCPMS is based on literature study. For improvement road map, three areas in need of improvements are chosen. The study shows the need of high level top management commitment in successful performance management system implementation and usage, especially when the system is deployed to lower levels in the organization.
Resumo:
Today's communication networks consist of numerous interdependent network components. To manage these networks and to ensure their reliable and efficient operation to meet the increasing customer usability demands, extensive network management tools are required from the service provider. The goal of this study was to adapt the Next Generation Network (NGN) providing VoIP services within a performance oriented network management system. This study focuses only on NGN network and the project was implemented as an assignment of the Network Operations Center of Elisa Corporation. The theoretical part of this study introduces the network environment of the Elisa NGN platform: its components and used signalling protocols as well as other exploitable communication protocols. In addition, the Simple Network Management Protocol (SNMP) is closely examined since it is commonly used as the basis of IP (Internet Protocol) network management. Also some primary applications enabled by the NGN technology are introduced. The empirical part of this study contains a short overview of the implemented network performance management system and its properties. The most crucial monitored MIB modules, SNMP parameters and implemented performance measurements are described. The trap topology and the role of the traps for management of the NGN platform are considered and finally, the conclusion based on the several disquisitions is made supported with suggestions for future improvements.
Resumo:
Because of the increased availability of different kind of business intelligence technologies and tools it can be easy to fall in illusion that new technologies will automatically solve the problems of data management and reporting of the company. The management is not only about management of technology but also the management of processes and people. This thesis is focusing more into traditional data management and performance management of production processes which both can be seen as a requirement for long lasting development. Also some of the operative BI solutions are considered in the ideal state of reporting system. The objectives of this study are to examine what requirements effective performance management of production processes have for data management and reporting of the company and to see how they are effecting on the efficiency of it. The research is executed as a theoretical literary research about the subjects and as a qualitative case study about reporting development project of Finnsugar Ltd. The case study is examined through theoretical frameworks and by the active participant observation. To get a better picture about the ideal state of reporting system simple investment calculations are performed. According to the results of the research, requirements for effective performance management of production processes are automation in the collection of data, integration of operative databases, usage of efficient data management technologies like ETL (Extract, Transform, Load) processes, data warehouse (DW) and Online Analytical Processing (OLAP) and efficient management of processes, data and roles.
Resumo:
Data management consists of collecting, storing, and processing the data into the format which provides value-adding information for decision-making process. The development of data management has enabled of designing increasingly effective database management systems to support business needs. Therefore as well as advanced systems are designed for reporting purposes, also operational systems allow reporting and data analyzing. The used research method in the theory part is qualitative research and the research type in the empirical part is case study. Objective of this paper is to examine database management system requirements from reporting managements and data managements perspectives. In the theory part these requirements are identified and the appropriateness of the relational data model is evaluated. In addition key performance indicators applied to the operational monitoring of production are studied. The study has revealed that the appropriate operational key performance indicators of production takes into account time, quality, flexibility and cost aspects. Especially manufacturing efficiency has been highlighted. In this paper, reporting management is defined as a continuous monitoring of given performance measures. According to the literature review, the data management tool should cover performance, usability, reliability, scalability, and data privacy aspects in order to fulfill reporting managements demands. A framework is created for the system development phase based on requirements, and is used in the empirical part of the thesis where such a system is designed and created for reporting management purposes for a company which operates in the manufacturing industry. Relational data modeling and database architectures are utilized when the system is built for relational database platform.
Resumo:
This thesis examines how content marketing is used in B2B customer acquisition and how content marketing performance measurement system is built and utilized in this context. Literature related to performance measurement, branding and buyer behavior is examined in the theoretical part in order to identify the elements influence on content marketing performance measurement design and usage. Qualitative case study is chosen in order to gain deep understanding of the phenomenon studied. The case company is a Finnish software vendor, which operates in B2B markets and has practiced content marketing for approximately two years. The in-depth interviews were conducted with three employees from marketing department. According to findings content marketing performance measurement system’s infrastructure is based on target market’s decision making processes, company’s own customer acquisition process, marketing automation tool and analytics solutions. The main roles of content marketing performance measurement system are measuring performance, strategy management and learning and improvement. Content marketing objectives in the context of customer acquisition are enhancing brand awareness, influencing brand attitude and lead generation. Both non-financial and financial outcomes are assessed by single phase specific metrics, phase specific overall KPIs and ratings related to lead’s involvement.
Resumo:
This work presents synopsis of efficient strategies used in power managements for achieving the most economical power and energy consumption in multicore systems, FPGA and NoC Platforms. In this work, a practical approach was taken, in an effort to validate the significance of the proposed Adaptive Power Management Algorithm (APMA), proposed for system developed, for this thesis project. This system comprise arithmetic and logic unit, up and down counters, adder, state machine and multiplexer. The essence of carrying this project firstly, is to develop a system that will be used for this power management project. Secondly, to perform area and power synopsis of the system on these various scalable technology platforms, UMC 90nm nanotechnology 1.2v, UMC 90nm nanotechnology 1.32v and UMC 0.18 μmNanotechnology 1.80v, in order to examine the difference in area and power consumption of the system on the platforms. Thirdly, to explore various strategies that can be used to reducing system’s power consumption and to propose an adaptive power management algorithm that can be used to reduce the power consumption of the system. The strategies introduced in this work comprise Dynamic Voltage Frequency Scaling (DVFS) and task parallelism. After the system development, it was run on FPGA board, basically NoC Platforms and on these various technology platforms UMC 90nm nanotechnology1.2v, UMC 90nm nanotechnology 1.32v and UMC180 nm nanotechnology 1.80v, the system synthesis was successfully accomplished, the simulated result analysis shows that the system meets all functional requirements, the power consumption and the area utilization were recorded and analyzed in chapter 7 of this work. This work extensively reviewed various strategies for managing power consumption which were quantitative research works by many researchers and companies, it's a mixture of study analysis and experimented lab works, it condensed and presents the whole basic concepts of power management strategy from quality technical papers.
Resumo:
Tutkielman tavoitteena on rakentaa toimiva ympäristöjärjestelmä Thermo Fisher Scientific Oy:lle. Tutkimuksen tarkoituksena on myös löytää kahdelle täysin erilaiselle toiminnalle yhtenäinen ympäristöjärjestelmä, jonka avulla pystytään ottamaan huomioon molempien toimipaikkojen hieman erilaiset vaatimukset. Lisäksi tavoitteena on muodostaa ympäristöjärjestelmälle oma organisaatio, jonka avulla ympäristöjärjestelmän integrointi yrityksen prosesseihin voidaan suorittaa sujuvasti. Aluksi tutkimusongelmaa lähestytään teoreettisesta näkökulmasta,jossa tarkastellaan ympäristöjärjestelmän historiaa, rakennetta, etuja sekä ISO 14001–standardin rakennetta ja sen etenemistä ympäristöjärjestelmän rakentamisen yhteydessä aina kolmannen osapuolen sertifiointiin asti. Empiria osa alkaa alustavalla ympäristökatselmuksella, jossa selvitetään ympäristöasioiden hoidon nykytaso ja luodaan pohja koko ympäristöjärjestelmän luomiselle, jonka vankimpana perustana on ympäristöpolitiikka. Johdon hyväksymä ympäristöpolitiikka varmistaa johdon sitoutumisen järjestelmään. Ympäristöjärjestelmän toimintarakenteen muodostaminen kahdelle erilaiselle toiminnalle onnistui tutkimuksessa kiitettävästi. Se miten ympäristöjärjestelmä toimii todellisuudessa, tullaan näkemään käytännön kokemuksien yhteydessä.
Resumo:
Diplomityössä on tutkittu reaaliaikaisen toimintolaskennan toteuttamista suomalaisen lasersiruja valmistavan PK-yrityksen tietojärjestelmään. Lisäksi on tarkasteltu toimintolaskennan vaikutuksia operatiiviseen toimintaan sekä toimintojen johtamiseen. Työn kirjallisuusosassa on käsitelty kirjallisuuslähteiden perusteella toimintolaskennan teorioita, laskentamenetelmiä sekä teknisessä toteutuksessa käytettyjä teknologioita. Työn toteutusosassa suunniteltiin ja toteutettiin WWW-pohjainen toimintolaskentajärjestelmä case-yrityksen kustannuslaskennan sekä taloushallinnon avuksi. Työkalu integroitiin osaksi yrityksen toiminnanohjaus- sekä valmistuksenohjausjärjestelmää. Perinteisiin toimintolaskentamallien tiedonkeruujärjestelmiin verrattuna case-yrityksessä syötteet toimintolaskentajärjestelmälle tulevat reaaliaikaisesti osana suurempaa tietojärjestelmäintegraatiota.Diplomityö pyrkii luomaan suhteen toimintolaskennan vaatimusten ja tietokantajärjestelmien välille. Toimintolaskentajärjestelmää yritys voi hyödyntää esimerkiksi tuotteiden hinnoittelussa ja kustannuslaskennassa näkemällä tuotteisiin liittyviä kustannuksia eri näkökulmista. Päätelmiä voidaan tehdä tarkkaan kustannusinformaatioon perustuen sekä määrittää järjestelmän tuottaman datan perusteella, onko tietyn projektin, asiakkuuden tai tuotteen kehittäminen taloudellisesti kannattavaa.
Resumo:
Työn tärkeimpänä tavoitteena oli edistää ympäristöjärjestelmän laatimista Kvaerner Pulping, Power divisioonan Kattilat-liiketoimintayksikölle. Lisäksi tavoitteena oli tarkastella yritykseen kohdistuvia ympäristövaatimuksia ja niiden vaikutusta yrityksen toimintaan. Aluksi työssä tarkasteltiin ympäristöjärjestelmästandardien sisältöjä ja niiden eroja. Työssä käsiteltiin myös erilaisia elinkaarijohtamisen malleja, joita voidaan hyödyntää yrityksen kokonaisvaltaisessa ympäristöjärjestelmässä. Työssä tarkasteltiin myös sidosryhmien vaikutusta yrityksen ympäristötoimintaan. Kattilalaitostoimittajan tärkeimpiä asiakkaita ovat sellu- ja paperiteollisuus. Näihin yrityksiin on kohdistunut runsaan kymmenen vuoden aikana paineita ympäristötoiminnan tehostamiseksi. Tämän kehityksen seurauksena vastaavat tehostamispaineet ovat siirtymässä myös alihankkijoille, kuten kattilaitostoimittajille. Tehokkaan ympäristöjohtamisen takaamiseksi työssä määriteltiin ympäristövastuut ja –valtuudet sekä ympäristöpäämäärät ja –tavoitteet. Lisäksi tunnistettiin yrityksen toimintaan liittyvät ympäristönäkökohdat ja –riskit. Työn yhteydessä laadittiin ympäristöjärjestelmän luonnos, ja se sisältää jatkuvan parantamisen periaatteen. Työn yhteydessä laadittiin lisäksi Kvaerner Pulping Oy:n koelaitokselle ympäristölupahakemus. Työssä on kuvattu koelaitosta ja sen ympäristölupahakemukseen liittyviä asioita esimerkkinä parantuneesta ympäristöasioiden hoidosta.
Resumo:
Työn tavoitteena oli selvittää, kokevatko matkapuhelinalalla toimivat kanavapartnerit heitä varten suunnitellun asiakassuhdehallintajärjestelmän lisäarvopalveluna vaiko eivät. Työ toteutettiin asiakastyytyväisyystutkimuksen avulla, jossa mitattiin erilaisten partnereiden asennetta palvelua kohtaan. Työn tuloksena ilmeni, että palvelussa olevan informaation määrällä ei ollut suurta vaikutusta asiakkaiden tyytyväisyyteen. Syyt ovat pikemminkin yleisissä asenteissa vastaavia palveluja kohtaan.
Resumo:
Tutkimuksen päätavoitteena on tutkia taloudellisen näkökulman integroimista laatuajatteluun pohjautuvaan johtamisjärjestelmään esimerkkiyrityksessä. Johtamisjärjestelmän tulee tuottaa tietoa johdon strategiselle päätöksenteolle ja lisäksi täyttää laatujärjestelmän (ISO 9001:2000) asettamat vaatimukset. Tutkimuksen kohteena oleva työkalu on balanced scorecard (tasapainotettu tuloskortti). Työn tarkoituksena on ehdottaa balanced scorecard- talouden tunnuslukuja esimerkkiyritykselle. Tutkimuksen tavoitteisiin päästään empiiristä tutkimusta varten tehdyn teoreettisen viitekehyksen avulla. Empiiristä tutkimustietoa kerätään osallistuvan havainnoinnin, haastattelujen ja keskustelujen avulla. Tutkimusmenetelmänä on laadullinen case -tutkimus. Balanced scorecardin eri näkökulmille ehdotettiin tunnuslukuja empiirisen tutkimuksen pohjalta. Lisäksi talouden näkökulmaa tutkittiin tarkemmin. Tutkimuksen johtopäätöksenä esitettiin, että taloudelliset tunnusluvut mittaavat ensisijaisesti strategiaa eivätkä laatua. Lisäksi huomioitiin, että tuloskorttien tulisi olla koekäytössä ennen bonuspalkkauksen ja balanced scorecardin yhdistämistä.
Resumo:
Diplomityössä luodaan viitekehys tuotetiedonhallintajärjestelmän esisuunnittelua varten. Siinä on kolme ulottuvuutta: lisäarvontuotto-, toiminnallisuus- ja ohjelmistoulottuvuus. Viitekehys auttaa- tunnistamaan lisäarvontuottokomponentit, joihin voidaan vaikuttaa tiettyjen ohjelmistoluokkien tarjoamilla tuotetiedonhallintatoiminnallisuuksilla. Viitekehyksen järjestelmäsuunnittelullista näkökulmaa hyödynnetään tutkittavissa yritystapauksissa perustuen laskentamatriisin muotoon mallinnettuihin ulottuvuuksien välisiin suhteisiin. Matriisiin syötetään lisäarvontuotto- ja toiminnallisuuskomponenttien saamat tärkeydet kohdeyrityksessä suoritetussa haastattelututkimuksessa. Matriisin tuotos on tietyn ohjelmiston soveltuvuus kyseisen yrityksen tapauksessa. Soveltuvuus on joukko tunnuslukuja, jotka analysoidaan tulostenkäsittelyvaiheessa. Soveltuvuustulokset avustavat kohdeyritystä sen valitessa lähestymistapaansa tuotetiedonhallintaan - ja kuvaavat esisuunnitellun tuotetiedonhallintajärjestelmän. Viitekehyksen rakentaminen vaatii perinpohjaisen lähestymistavan merkityksellisten lisäarvontuotto- ja toiminnallisuuskomponenttien sekä ohjelmistoluokkien määrittämiseen. Määritystyö perustuu työssä yksityiskohtaisesti laadittujen menetelmien ja komponenttiryhmitysten hyödyntämiselle. Kunkin alueen analysointi mahdollistaa viitekehyksen ja laskentamatriisin rakentamisen yhdenmukaisten määritysten perusteella. Viitekehykselle on ominaista sen muunneltavuus. Nykymuodossaan se soveltuu elektroniikka- ja high-tech yrityksille. Viitekehystä voidaan hyödyntää myös muilla toimialoilla muokkaamalla lisäarvontuottokomponentteja kunkin toimialan intressien mukaisesti. Vastaavasti analysoitava ohjelmisto voidaan valita tapauskohtaisesti. Laskentamatriisi on kuitenkin ensin päivitettävä valitun ohjelmiston kyvykkyyksillä, minkä jälkeen viitekehys voi tuottaa soveltuvuustuloksia kyseiseen yritystapaukseen perustuen
Resumo:
Tutkielman tarkoituksena oli mallintaa varastonhallintajärjestelmä, joka olisi sopiva case yritykselle. Tutkimus aloitettiin case yrityksen varastonhallinan nykytilan kartoituksella, jonka jälkeen tutkittiin varastonhallinnan eri osa-alueisiin. Varastonhallinnan osa-alueista käsiteltiin varastotyyppejä, motiiveja, tavoitteita, kysynnän ennustamista sekä erilaisia varastonhallinnan työkaluja. Sen lisäksi tutkittiin erilaisia varaston täydennysmalleja. Teoriaosuudessa käsiteltiin lisäksi kolmea erilaista tietojärjestelmätyyppiä: toiminnanohjausjärjestelmää, sähköisen kaupankäynnin järjestelmää sekä räätälöityä järjestelmää. Tutkimussuunnitelmassa nämä kolme järjestelmää rajattiin vaihtoehdoiksi, joista jokin valittaisiin case yrityksen varastonhallintajärjestelmäksi. Teorian ja nykytilan pohjalta tehtiin viitekehys, jossa esiteltiin varastonhallintajärjestelmän tieto- ja toiminnallisuusominaisuuksia. Nämä ominaisuudet priorisoitiin neljään eri luokkaan ominaisuuden kriittisyyden mukaan. Järjestelmävaihtoehdot arvioitiin viitekehyksen kriteerien mukaisesti, miten helposti ominaisuudet olisivat toteutettavissa eri vaihtoehdoissa. Tulokset laskettiin näiden arviointien perusteella, jonka jälkeen tulosten analysoinnissa huomattiin, että toiminnanohjausjärjestelmä sopisi parhaiten case yrityksen varastonhallintajärjestelmäksi.