106 resultados para project based organisation
Resumo:
An augmented reality (AR) device must know observer’s location and orientation, i.e. observer’s pose, to be able to correctly register the virtual content to observer’s view. One possible way to determine and continuously follow-up the pose is model-based visual tracking. It supposes that a 3D model of the surroundings is known and that there is a video camera that is fixed to the device. The pose is tracked by comparing the video camera image to the model. Each new pose estimate is usually based on the previous estimate. However, the first estimate must be found out without a prior estimate, i.e. the tracking must be initialized, which in practice means that some model features must be identified from the image and matched to model features. This is known in literature as model-to-image registration problem or simultaneous pose and correspondence problem. This report reviews visual tracking initialization methods that are suitable for visual tracking in ship building environment when the ship CAD model is available. The environment is complex, which makes the initialization non-trivial. The report has been done as part of MARIN project.
Resumo:
Agile methods have become increasingly popular in the field of software engineering. While agile methods are now generally considered applicable to software projects of many different kinds, they have not been widely adopted in embedded systems development. This is partly due to the natural constraints that are present in embedded systems development (e.g. hardware–software interdependencies) that challenge the utilization of agile values, principles and practices. The research in agile embedded systems development has been very limited, and this thesis tackles an even less researched theme related to it: the suitability of different project management tools in agile embedded systems development. The thesis covers the basic aspects of many different agile tool types from physical tools, such as task boards and cards, to web-based agile tools that offer all-round solutions for application lifecycle management. In addition to these two extremities, there is also a wide range of lighter agile tools that focus on the core agile practices, such as backlog management. Also other non-agile tools, such as bug trackers, can be used to support agile development, for instance, with plug-ins. To investigate the special tool requirements in agile embedded development, the author observed tool related issues and solutions in a case study involving three different companies operating in the field of embedded systems development. All three companies had a distinct situation in the beginning of the case and thus the tool solutions varied from a backlog spreadsheet built from scratch to plug-in development for an already existing agile software tool. Detailed reports are presented of all three tool cases. Based on the knowledge gathered from agile tools and the case study experiences, it is concluded that there are tool related issues in the pilot phase, such as backlog management and user motivation. These can be overcome in various ways epending on the type of a team in question. Finally, five principles are formed to give guidelines for tool selection and usage in agile embedded systems development.
Resumo:
Presentation at Open Repositories 2014, Helsinki, Finland, June 9-13, 2014
Resumo:
Poster at Open Repositories 2014, Helsinki, Finland, June 9-13, 2014
Resumo:
In R&D organizations multiple projects are executed concurrently. Problems arises in managing shared resources since they are needed by multiple projects simultaneously. The objective of this thesis was to study how the project and resource management could be developed in a public sector R&D organization. The qualitative research was carried out in the Magnetic Measurements section at CERN where the section measures magnets for particle accelerators and builds state of the art measurement devices for various needs. Hence, the R&D and measurement projects are very time consuming and very complex. Based on the previous research and the requirements from the organization the best alter- native for resource management was to build a project management information system. A centralized database was constructed and on top of it was built an application for interacting and visualizing the project data. The application allows handling project data, which works as a basis for resource planning before and during the projects are executed. It is one way to standardize the work-flow of projects, which strengthens the project process. Additionally, it was noted that the inner customer’s database, the measurement system and the new application needed to be integrated. Further integration ensures that the project data is received efficiently from customers and available not only within the application but also during the concrete work. The research results introduced a new integrated application, which centralizes the project information flow with better visibility.
Resumo:
The main goal of this thesis was to examine how the emotional intelligence skills and multicultural project leadership style of a project manager interrelate and affect the success of a project. The research methods used are literature review in theoretical part of the thesis and semi-structured interviews in empirical part of the thesis. This study is a single case study i.e. one case company was selected to be the secondary level of analysis. Within the case company, four project managers were selected as research units to form the primary level of analysis. Literature review formed the basis for the empirical research and the interview questions were derived from the literature. Findings from the interviews were mirrored against the literature review findings, based on which both conclusions and generalisations could be made. Thus, both deductive and inductive methods were utilised to get more complete picture about the research topic. In the first part of the literature review the general leadership theories and the project leadership terminology are introduced as a background for the concept of emotional intelligence and the integrated leadership model. Emotional intelligence and its interrelation to different leadership concepts are discussed during the literature review. Chinese cultural aspects affecting the way of making business, and the multicultural leadership styles of the Finnish project managers are introduced in the following part of the literature review. It was found that the most successfully used multicultural leadership styles in Finnish-Chinese context are synergistic and polycentric, and these require emotional intelligence skills. In the empirical part on this thesis the findings from the semi-structured interviews are introduced, discussed and analysed. Interviews were done in private meeting rooms, and they were recorded and transcripted to add reliability and validity. Although the sample was only four project managers, the results show that the sample is quite saturated as the responses to several questions followed the same pattern. It was found that Finnish project managers in the case company are democratic and take cultural differences into account in their project leadership. Both synergistic and polycentric leadership styles are used with Chinese team members. Emotional intelligence capabilities and the emphasis of those differ a bit depending on the interviewee. Though, the results show that EI skills and the multicultural project leadership style used in Chinese context are interrelated. The findings from the literature review and the empirical research in this thesis are similar. Though, there is need for further research as the sample was small, and this thesis is a single case study. It is recommendable to make a multi-company study with larger sample of project managers. Also multi-industry perspective is recommendable for further research.
Resumo:
Liiketoiminnan organisoiminen projekteiksi on erittäin yleistä nykyisin. Suuri osa projekteista erityisesti IT-alalla epäonnistuu kuitenkin saavuttamaan tavoitteensa. Projektin menestys on tyypillisesti mitattu budjetin, aikataulun, laadun ja sidosryhmien tyytyväisyyden perusteella. Tämän Pro Gradu -tutkielman tarkoituksena on etsiä tyypillisimpiä syitä projektien epäonnistumiseen ja löytää projektien seurannan ja mittaamisen avulla keinoja näiden epäonnistumisten ehkäisemiseen. Tutkimusmenetelmänä on laadullinen tapaustutkimus. Empiirinen aineisto on kerätty haastattelujen, eri materiaalien analysoinnin ja havainnoinnin avulla. Teoriaosuus tarjoaa kattavan yhteenvedon projektiliiketoiminnan ja yksittäisten projektien johtamiseen sekä projektien seurantaan ja mittaamiseen aikaisemman kirjallisuuden perusteella. Empiirisessä osiossa suoritetaan analyysi Case -yrityksen projektien seurantaan ja valittuihin projekteihin. Analyysien, haastattelujen ja havainnoinnin pohjalta tehdään johtopäätökset tyypillisimmistä, ongelmia projekteissa aiheuttavista tekijöistä sekä näiden esiintymisestä projektin elinkaaren eri vaiheissa. Mahdolliset ongelmia ehkäisevät keinot esitetään myös. Ehdotuksia kehityskohteiksi esitetään lopuksi teorian ja empirian pohjalta.
Resumo:
The objective of this research is to demonstrate the use of Lean Six Sigma methodology in a manufacturing lead time improvement project. Moreover, the goal is to develop working solutions for the target company to improve its manufacturing lead time. The theoretical background is achieved through exploring the literature of Six Sigma, Lean and Lean Six Sigma. The development will be done in collaboration with the related stakeholders, by following the Lean Six Sigma improvement process DMAIC and by analyzing the process data from the target company. The focus of this research is in demonstrating how to use Lean Six Sigma improvement process DMAIC in practice, rather than in comparing Lean Six Sigma to other improvement methodologies. In order to validate the manufacturing system’s current state, improvement potential and solutions, statistical tools such as linear regression analysis were used. This ensured that all the decisions were as heavily based on actual data as possible. As a result of this research, a set of solutions were developed and implemented in the target company. These solutions included batch size reduction, bottleneck shift, first-in first-out queuing and shifting a data entry task from production planners to line workers. With the use of these solutions, the target company was able to reduce its manufacturing lead time by over one third.
Resumo:
The objective of this project was to introduce a new software product to pulp industry, a new market for case company. An optimization based scheduling tool has been developed to allow pulp operations to better control their production processes and improve both production efficiency and stability. Both the work here and earlier research indicates that there is a potential for savings around 1-5%. All the supporting data is available today coming from distributed control systems, data historians and other existing sources. The pulp mill model together with the scheduler, allows what-if analyses of the impacts and timely feasibility of various external actions such as planned maintenance of any particular mill operation. The visibility gained from the model proves also to be a real benefit. The aim is to satisfy demand and gain extra profit, while achieving the required customer service level. Research effort has been put both in understanding the minimum features needed to satisfy the scheduling requirements in the industry and the overall existence of the market. A qualitative study was constructed to both identify competitive situation and the requirements vs. gaps on the market. It becomes clear that there is no such system on the marketplace today and also that there is room to improve target market overall process efficiency through such planning tool. This thesis also provides better overall understanding of the different processes in this particular industry for the case company.
Resumo:
Tutkielmassa rakennettiin laskentamalli metsäteollisuuden puunhankinnan hankintalähteen kannattavuuden määrittämiseksi ja selittämiseksi. Tutkimuksessa noudatettiin konstruktiivisen tapaustutkimuksen tutkimusotetta. Tutkimuksen kohdeorganisaationa oli kansainvälisesti toimivan metsäteollisuusyrityksen Suomen puunhankintaorganisaatio. Kannattavuusmalli määrittelee hankintalähteen kannattavuuden sekä käsitteellisellä että laskentamenettelyn tasolla. Kannattavuusmallin katesuure on porttikate, joka rakennettiin taloudellisen lisäarvon teoriaan nojaten kohdeorganisaation tarpeiden ja sen laskenta-asiantuntijoiden näkemysten perusteella. Kannattavuusmallin rakenne ja osat kuvattiin seikkaperäisesti. Kannattavuusmallin käyttämän liiketoimintadatan poiminta ja laskentasuureiden raportointi testattiin. Mallin tarvitsemat laskentatiedot on saatavissa kohdeorganisaation kehitteillä olevasta toiminnanohjausjärjestelmästä. Laskentamallin hyödyntämismahdollisuudet arvioitiin. Hankintalähteen kannattavuutta mittaavalla porttikatteella voidaan ohjata puunhankintaorganisaatiota sen tavoitteiden saavuttamisessa. Malli ilmaisee porttikatteeseen vaikuttavien tekijöiden vaikutuksen kannattavuuteen, minkä avulla voidaan tehdä parempia päätöksiä hankintalähteiden hyödyntämisessä. Aiemmista tutkimuksista poiketen malli huomioi hankintalähteen suoritteen arvon tärkeimmille asiakastehtaille perustuen todellisiin liiketapahtumiin. Kannattavuusmallia voidaan hyödyntää laajalti metsäteollisuusyritysten tavaralajimenetelmään perustuvassa puunhankinnassa. Kannattavuusmallin rakentaminen rohkaisee puunhankinnan johtoa ja laskentahenkilöitä hedelmällisen yhteistyöhön.
Resumo:
Targeted measures bring the greatest benefits for environmental protection in agriculture final report of the TEHO Plus project (2011–2014). Particular priority areas of the project activities included creating a training package for agri-environment advisers and testing it, farm-specific advisory services and exploitation of experiences of advice provision, putting together an information package of agri-environment issues, farm-level experiments, and development of water quality monitoring. The recommendations issued by advisers on targeting environmental measures were based on utilising geographical information material and nutrient balances. The project was implemented in cooperation by Southwest Finland Centre for Economic Development, Transport and the Environment, MTK-Satakunta and MTK-Varsinais-Suomi. The project received funding from the Ministry of Agriculture and Forestry and the Ministry of the Environment. Participating farmers, with whom environmental advice was developed and experiments were carried out, were important partners for the project. The operating area of the project was Satakunta and Varsinais-Suomi in Southwest Finland, but its outcomes can be exploited nationally. A national perspective was ensured by close cooperation with actors in different provinces. This final report describes project experiences and outcomes including environmental advisory services, training of agri-environmental advisers, farm visits and the feedback received from farmers on agri-environmental advice, development of water quality monitoring, experiments and project work.
Resumo:
Objective of the thesis is to create a value based pricing model for marine engines and study the feasibility of implementing such model in the sales organization of a specific segment in the case company’s marine division. Different pricing strategies, concept of “value”, and how perceptions of value can be influenced through value based marketing are presented as theoretical background for the value based pricing model. Forbis and Mehta’s Economic Value to Customer (EVC) was selected as framework to create the value based pricing model for marine engines. The EVC model is based on calculating and comparing life-cycle costs of the reference product and competing products, thus showing the quantifiable value of the company’s own product compared to competition. In the applied part of the thesis, the components of the EVC model are identified for a marine diesel engine, the components are explained, and an example calculation created in Excel is presented. When examining the possibilities to implement in practice a value based pricing strategy based on the EVC model, it was found that the lack of precise information on competing products is the single biggest obstacle to use EVC exactly as presented in the literature. It was also found that sometimes necessary communication channels are missing and that there is simply a lack of interest from some clients and product end-users part to spend time on studying the life-cycle costs of the product. Information on the company’s own products is however sufficient and the sales force is capable to communicate to sufficiently high executive levels in the client organizations. Therefore it is suggested to focus on quantifying and communicating the company’s own value proposition. The dynamic nature of the business environment (variance in applications in which engines are installed, different clients, competition, end-clients etc.) means also that each project should be created its own EVC calculation. This is demanding in terms of resources needed, thus it is suggested to concentrate on selected projects and buyers, and to clients where the necessary communication channels to right levels in the customer organization are available. Finally, it should be highlighted that as literature suggests, implementing a value based pricing strategy is not possible unless the whole business approach is value based.
Resumo:
Process management refers to improving the key functions of a company. The main functions of the case company - project management, procurement, finance, and human resource - use their own separate systems. The case company is in the process of changing its software. Different functions will use the same system in the future. This software change causes changes in some of the company’s processes. Project cash flow forecasting process is one of the changing processes. Cash flow forecasting ensures the sufficiency of money and prepares for possible changes in the future. This will help to ensure the company’s viability. The purpose of the research is to describe a new project cash flow forecasting process. In addition, the aim is to analyze the impacts of the process change, with regard to the project control department’s workload and resources through the process measurement, and how the impacts take the department’s future operations into account. The research is based on process management. Processes, their descriptions, and the way the process management uses the information, are discussed in the theory part of this research. The theory part is based on literature and articles. Project cash flow and forecasting-related benefits are also discussed. After this, the project cash flow forecasting as-is and to-be processes are described by utilizing information, obtained from the theoretical part, as well as the know-how of the project control department’s personnel. Written descriptions and cross-functional flowcharts are used for descriptions. Process measurement is based on interviews with the personnel – mainly cost controllers and department managers. The process change and the integration of two processes will allow work time for other things, for example, analysis of costs. In addition to the quality of the cash flow information will improve compared to the as-is process. Analyzing the department’s other main processes, department’s roles, and their responsibilities should be checked and redesigned. This way, there will be an opportunity to achieve the best possible efficiency and cost savings.
Resumo:
This work presents synopsis of efficient strategies used in power managements for achieving the most economical power and energy consumption in multicore systems, FPGA and NoC Platforms. In this work, a practical approach was taken, in an effort to validate the significance of the proposed Adaptive Power Management Algorithm (APMA), proposed for system developed, for this thesis project. This system comprise arithmetic and logic unit, up and down counters, adder, state machine and multiplexer. The essence of carrying this project firstly, is to develop a system that will be used for this power management project. Secondly, to perform area and power synopsis of the system on these various scalable technology platforms, UMC 90nm nanotechnology 1.2v, UMC 90nm nanotechnology 1.32v and UMC 0.18 μmNanotechnology 1.80v, in order to examine the difference in area and power consumption of the system on the platforms. Thirdly, to explore various strategies that can be used to reducing system’s power consumption and to propose an adaptive power management algorithm that can be used to reduce the power consumption of the system. The strategies introduced in this work comprise Dynamic Voltage Frequency Scaling (DVFS) and task parallelism. After the system development, it was run on FPGA board, basically NoC Platforms and on these various technology platforms UMC 90nm nanotechnology1.2v, UMC 90nm nanotechnology 1.32v and UMC180 nm nanotechnology 1.80v, the system synthesis was successfully accomplished, the simulated result analysis shows that the system meets all functional requirements, the power consumption and the area utilization were recorded and analyzed in chapter 7 of this work. This work extensively reviewed various strategies for managing power consumption which were quantitative research works by many researchers and companies, it's a mixture of study analysis and experimented lab works, it condensed and presents the whole basic concepts of power management strategy from quality technical papers.
Resumo:
Project scope is to utilize Six Sigma DMAIC approach and lean principles to improve production quality of the case company. Six Sigma tools and techniques are explored through a literature review and later used in the quality control phase. The focus is set on the Pareto analysis to demonstrate the most evident development areas in the production. Materials that are not delivered to the customer or materials that damaged during transportation comprise the biggest share of all feedbacks. The goal is set to reduce these feedbacks by 50 %. Production observation pointed out that not only material shortages but also over-production is a daily situation. As a result, an initial picking list where the purchased and own production components can be seen, is created, reduction of over- and underproduction and material marking improvement are seen the most competitive options so that the goal can be reached. The picking list development should still continue to make sure that the list can be used not only in the case study but also in the industrial scale. The reduction of material missing category can be evaluated reliably not sooner than in few years because it takes time to gather the needed statistical information.