71 resultados para Evaluating and Selecting a Property Management System
Resumo:
This thesis describes the development of a software requirements specification for a user-centric event management system. The system is set to satisfy three goals: adding value for the event attendees, adding value for the event organizer, and reducing the costs of arranging and running an event. The requirements are identified by researching the prescriptive traits of event business and the current state of the case company and its environment. First the professional and human needs for events are scrutinized. Second, some recent reports about the current trends in the event business are reviewed. Then the event life cycle is presented using the model of new service development, and online promotion of events and especially word-of-mouth marketing receive special attention. Events are also regarded from the perspective of social networks and social media. The case company’s current state and its competitors are reviewed to formulate the needs which the system should fulfil. Then the currently available solutions for social media oriented event management are reviewed. The result is a set of functional and non-functional requirements. The functional requirements are categorized into social media, social networking, event personalization, event management, and system administration features. The specified features and non-functional requirements satisfy the three goals set for the system.
Resumo:
Stora Enso has research centres in Finland, Sweden and Germany. The research centres use PIMS as a research project invoicing and monitoring system. Possible reorganization and new financing model for R&D functions have been considered and the project management system should be developed to support the new operation model. The objective of this thesis is to find a model for R&D project management, and to present the project management system of Stora Enso, and to discuss if the current system could be developed to respond to the new needs or should it be replaced with another system. The theoretical part of the study describes challenges in R&D project management, and presents different project characteristics, and methods for managing R&D project portfolio. It is also described how the project management system can support project monitoring and controlling, and how inter-project learning can be enhanced. The empirical part of the study presents the current project management system of Stora Enso and how the system should be developed to support Stora Enso’s R&D functions better. In conclusion, it is stated that there is no relevant reason to replace PIMS with another system, because PIMS can be developed to support R&D project management better with a hybrid system. It is also suggested that the new financing model should not be implemented before more comprehensive analysis of its effects is conducted.
Resumo:
Keeping track of software assets and managing software installations in IT environments can be a hard endeavor, especially when the size and diversity of the environment grows. How to install and uninstall software efficiently and cost effectively? Are there too few or too many software licenses purchased? If installed, is the software actually in use? Software Asset Management (SAM) is a process that involves managing and optimizing the purchase, deployment, maintenance, utilization, and disposal of software applications within an organization. This master’s thesis describes a special Software Lifecycle Management Framework to provide solutions to the multitude of challenges within SAM. The main objectives when designing the framework was to provide a set of tools to control the software assets during their entire lifecycle while trying to minimize the costs related to owning and managing them.
Resumo:
Opinnäytetyö keskittyi kriittisiin tapahtumiin, joita on tullut yhtiön tai sen edeltävän yhtiön, joka oli Mobile Screen TV – 4 ALL, tekemien aikaisempien patenttihakemusten yhteydessä . Tutkimus vertasi ja evaluoi yhtiön aikaisemmin tekemien keksintöjen suojausta. Toisaalta opinnäytetyön päämäärä oli tutkia ja selvittää monitapaus-menetelmällä yhtiön aikaisempia keksintöjä ja miten aineettoman oikeuden suojaus toteutui prosessien eri vaiheissa. Tämä päättötyötutkielma vei loppuun asti erittäin suuren patenttien ja hyödyllisyysmallien hakemusten tutkimuksen. LH Communications Oy on tehnyt monia niistä, mutta tutkimus sisälsi myös joitakin kilpailijoiden hakemuksia. Tässä tutkimuksessa oli kaksi pääkysymystä. Miten pieni yhtiö voisi suojella heidän uusia ideoitaan ja keksintöjään ja myös samalla pitää yhtiön talouden hyvällä tasolla. Tämä tutkimus käytti The Critical Incidents Technique (CIT), joka keskittyy kriittisiin tapahtumiin, selvittääkseen sopivia menetelmiä pienelle yhtiölle siitä, miten suojella uusia ajatuksia, ideoita ja keksintöjä ja samanaikaisesti olla tuottava niiden kanssa. Tutkimuksemme käsitteli kaikenlaisia tarvittavia käytäntöjä pienessä yhtiössä ja päähuomio pienessä yhtiössä tulee olla omien keksintöjen suojaamisessa. Paras suojaus on tehdä patentteja, mutta se tulee maksamaan hyvin paljon koko tapahtumasarjan aikana.
Resumo:
Usage of batteries as energy storage is emerging in automotive and mobile working machine applications in future. When battery systems become larger, battery management becomes an essential part of the application concerning fault situations of the battery and safety of the user. A properly designed battery management system extends one charge cycle of battery pack and the whole life time of the battery pack. In this thesis main objectives and principles of BMS are studied and first order Thevenin’s model of the lithium-titanate battery cell is built based on laboratory measurements. The battery cell model is then verified by comparing the battery cell model and the actual battery cell and its suitability for use in BMS is studied.
Resumo:
Data is the most important asset of a company in the information age. Other assets, such as technology, facilities or products can be copied or reverse-engineered, employees can be brought over, but data remains unique to every company. As data management topics are slowly moving from unknown unknowns to known unknowns, tools to evaluate and manage data properly are developed and refined. Many projects are in progress today to develop various maturity models for evaluating information and data management practices. These maturity models come in many shapes and sizes: from short and concise ones meant for a quick assessment, to complex ones that call for an expert assessment by experienced consultants. In this paper several of them, made not only by external inter-organizational groups and authors, but also developed internally at a Major Energy Provider Company (MEPC) are juxtaposed and thoroughly analyzed. Apart from analyzing the available maturity models related to Data Management, this paper also selects the one with the most merit and describes and analyzes using it to perform a maturity assessment in MEPC. The utility of maturity models is two-fold: descriptive and prescriptive. Besides recording the current state of Data Management practices maturity by performing the assessments, this maturity model is also used to chart the way forward. Thus, after the current situation is presented, analysis and recommendations on how to improve it based on the definitions of higher levels of maturity are given. Generally, the main trend observed was the widening of the Data Management field to include more business and “soft” areas (as opposed to technical ones) and the change of focus towards business value of data, while assuming that the underlying IT systems for managing data are “ideal”, that is, left to the purely technical disciplines to design and maintain. This trend is not only present in Data Management but in other technological areas as well, where more and more attention is given to innovative use of technology, while acknowledging that the strategic importance of IT as such is diminishing.
Resumo:
The purpose of the study is to determine general features of the supply chain performance management system, to assess the current state of performance management in the case company mills and to make proposals for improvement – how the future state of performance management system would look like. The study covers four phases which consist of theory and case company parts. Theoretical review gives understanding about performance management and measurement. Current state analysis assesses the current state of performance management in the mills. Results and proposals for improvement are derived from current state analysis and finally the conclusions with answers to research questions are presented. Supply chain performance management system consists of five areas: perfor-mance measurement and metrics, action plans, performance tracking, performance dialogue and rewards, consequences and actions. The result of the study revealed that all mills were quite average level in performance management and there is a room for improvement. Created performance improvement matrix served as a tool in assessing current performance management and could work also as a tool in the future in mapping the current state after transformation process. Limited harmonization was revealed as there were different ways to work and manage performance in the mills. Lots of good ideas existed though actions are needed to make a progress. There is also need to harmonize KPI structure.
Resumo:
This Master’s Thesis studies performance management system and its benefits, risks and costs. Objective of the thesis is to describe and evaluate currently used supply chain performance management system (SCPMS) in a Finnish paper mill and its interfaces with its business unit’s SCPMS. As a result, the host company has improvement road map for improving its SCPMS. Used SCPMS in the host company and its interfaces to business unit’s SCPMS are described based on interviews held in the host company and the business unit. Evaluation of the host company’s SCPMS is based on literature study. For improvement road map, three areas in need of improvements are chosen. The study shows the need of high level top management commitment in successful performance management system implementation and usage, especially when the system is deployed to lower levels in the organization.
Resumo:
Presentation at Open Repositories 2014, Helsinki, Finland, June 9-13, 2014
Resumo:
Data management consists of collecting, storing, and processing the data into the format which provides value-adding information for decision-making process. The development of data management has enabled of designing increasingly effective database management systems to support business needs. Therefore as well as advanced systems are designed for reporting purposes, also operational systems allow reporting and data analyzing. The used research method in the theory part is qualitative research and the research type in the empirical part is case study. Objective of this paper is to examine database management system requirements from reporting managements and data managements perspectives. In the theory part these requirements are identified and the appropriateness of the relational data model is evaluated. In addition key performance indicators applied to the operational monitoring of production are studied. The study has revealed that the appropriate operational key performance indicators of production takes into account time, quality, flexibility and cost aspects. Especially manufacturing efficiency has been highlighted. In this paper, reporting management is defined as a continuous monitoring of given performance measures. According to the literature review, the data management tool should cover performance, usability, reliability, scalability, and data privacy aspects in order to fulfill reporting managements demands. A framework is created for the system development phase based on requirements, and is used in the empirical part of the thesis where such a system is designed and created for reporting management purposes for a company which operates in the manufacturing industry. Relational data modeling and database architectures are utilized when the system is built for relational database platform.
Resumo:
Recent developments in power electronics technology have made it possible to develop competitive and reliable low-voltage DC (LVDC) distribution networks. Further, islanded microgrids—isolated small-scale localized distribution networks— have been proposed to reliably supply power using distributed generations. However, islanded operations face many issues such as power quality, voltage regulation, network stability, and protection. In this thesis, an energy management system (EMS) that ensures efficient energy and power balancing and voltage regulation has been proposed for an LVDC island network utilizing solar panels for electricity production and lead-acid batteries for energy storage. The EMS uses the master/slave method with robust communication infrastructure to control the production, storage, and loads. The logical basis for the EMS operations has been established by proposing functionalities of the network components as well as by defining appropriate operation modes that encompass all situations. During loss-of-powersupply periods, load prioritizations and disconnections are employed to maintain the power supply to at least some loads. The proposed EMS ensures optimal energy balance in the network. A sizing method based on discrete-event simulations has also been proposed to obtain reliable capacities of the photovoltaic array and battery. In addition, an algorithm to determine the number of hours of electric power supply that can be guaranteed to the customers at any given location has been developed. The successful performances of all the proposed algorithms have been demonstrated by simulations.
Resumo:
This Master’s thesis examines the implementation of management system standard requirements as integrated in the organization. The aim is to determine how requirements from management system standards ISO 14001:2015 and ISO 9001:2015 can be integrated and implemented into the existing ISO 9001:2008 compliant management system. Research was executed as action research by utilizing an operating model about the integrated use of management system standards created by the International Organization for Standardization. Phases of the operating model were applied to the target organization. The similarity and integration potential of relevant standards were assessed by using comparative matrices. Allocation of the requirements and conformity assessment of the processes was executed by gap analysis. The main results indicate that the requirements of the relevant standards are principally equivalent or have the same kind of purpose. The results also show the most important processes of the target organization in terms of requirement compliance, as well as the requirements which affect the process the most. Prioritizing the compliance achievement of the most important processes and implementation of those requirements that have the most effect create an opportunity for organizations to implement the integrated requirements effectively.
Resumo:
At present, in large precast concrete enterprises, the management over precast concrete component has been chaotic. Most enterprises take labor-intensive manual input method, which is time consuming and laborious, and error-prone. Some other slightly better enterprises choose to manage through bar-code or printing serial number manually. However, on one hand, this is also labor-intensive, on the other hand, this method is limited by external environment, making the serial number blur or even lost, and also causes a big problem on production traceability and quality accountability. Therefore, to realize the enterprise’s own rapid development and cater to the needs of the time, to achieve the automated production management has been a big problem for a modern enterprise. In order to solve the problem, inefficiency in production and traceability of the products, this thesis try to introduce RFID technology into the production of PHC tubular pile. By designing a production management system of precast concrete components, the enterprise will achieve the control of the entire production process, and realize the informatization of enterprise production management. RFID technology has been widely used in many fields like entrance control, charge management, logistics and so on. RFID technology will adopt passive RFID tag, which is waterproof, shockproof, anti-interference, so it’s suitable for the actual working environment. The tag will be bound to the precast component steel cage (the structure of the PHC tubular pile before the concrete placement), which means each PHC tubular pile will have a unique ID number. Then according to the production procedure, the precast component will be performed with a series of actions, put the steel cage into the mold, mold clamping, pouring concrete (feed), stretching, centrifugalizing, maintenance, mold removing, welding splice. In every session of the procedure, the information of the precast components can be read through a RFID reader. Using a portable smart device connected to the database, the user can check, inquire and management the production information conveniently. Also, the system can trace the production parameter and the person in charge, realize the traceability of the information. This system can overcome the disadvantages in precast components manufacturers, like inefficiency, error-prone, time consuming, labor intensity, low information relevance and so on. This system can help to improve the production management efficiency, and can produce a good economic and social benefits, so, this system has a certain practical value.
Resumo:
Abstract