890 resultados para project cost engineering


Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVE To evaluate the viability of a professional specialist in intra-hospital committees of organ and tissue donation for transplantation. METHODS Epidemiological, retrospective and cross-sectional study (2003-2011 and 2008-2012), which was performed using organ donation for transplants data in the state of Sao Paulo, Southeastern Brazil. Nine hospitals were evaluated (hospitals 1 to 9). Logistic regression was used to evaluate the differences in the number of brain death referrals and actual donors (dependent variables) after the professional specialist started work (independent variable) at the intra-hospital committee of organ and tissue donation for transplantation. To evaluate the hospital invoicing, the hourly wage of the doctor and registered nurse, according to the legislation of the Consolidation of Labor Laws, were calculated, as were the investment return and the time elapsed to do so. RESULTS Following the nursing specialist commencement on the committee, brain death referrals and the number of actual donors increased at hospital 2 (4.17 and 1.52, respectively). At hospital 7, the number of actual donors also increased from 0.005 to 1.54. In addition, after the nurse started working, hospital revenues increased by 190.0% (ranging 40.0% to 1.955%). The monthly cost for the nurse working 20 hours was US$397.97 while the doctor would cost US$3,526.67. The return on investment was 275% over the short term (0.36 years). CONCLUSIONS This paper showed that including a professional specialist in intra-hospital committees for organ and tissue donation for transplantation proved to be cost-effective. Further economic research in the area could contribute to the efficient public policy implementation of this organ and tissue harvesting model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Target company of this study is a large machinery company, which is, inter alia, engaged in energy and pulp engineering, procurement and construction management (EPCM) supply business. The main objective of this study was to develop cost estimation of the target company by providing more accurate, reliable and up-to-date information through enterprise resource planning (ERP) system. Another objective was to find cost-effective methods to collect total cost of ownership information to support more informed supplier selection decision making. This study is primarily action-oriented, but also constructive, and it can be divided in two sections: theoretical literature review and empirical study on the abovementioned part of the target company’s business. Development of information collection is, in addition to literature review, based on nearly 30 qualitative interviews of employees at various organizational units, functions and levels at the target company. At the core of development was to make initial data more accurate, reliable and available, a necessary prerequisite for informed use of the information. Certain development suggestions and paths were presented in order to regain confidence in ERP system as information source by reorganizing work breakdown structure and by complementing mere cost information with quantitative, technical and scope information. Several methods to use the information ever more effectively were also discussed. While implementation of the development suggestions outreached the scope of this study, it was forwarded in test environment and interest groups.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The advent of global competition has introduced the need for new competitive manufacturing strategies. The implementation of new strategies has a dramatic effect on measuring product cost compared to traditional management accounting methods. It is found that new cost management methods are required to measure success and support decision-making within the new strategies. One example is the consequences of using traditional management accounting methods for measuring the effects of lean having catastrophic results during reporting. Such results steer managers away from lean manufacture based upon a false picture of the potential benefits. This research examines cost management methods potentially applicable within the automotive supplier sector. Because of the lack of cost-related data collected within the supplier sector companies, this paper ends with a demonstration of a novel method for use in data scarce environments. Copyright © 2008 Inderscience Enterprises Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tutkimuksen kohdeyritys on rakennusalan pk-yritys, jonka liiketoiminta perustuu kokonaan toimitusprojekteille. Tutkimuksen tavoitteena oli kehittää kohdeyrityksen käyttöön helppokäyttöinen projektilaskentamalli, jonka avulla voidaan ennalta tunnistaa kannattamattomat toimitusprojektit. Tutkimuksessa keskitytään projektien kustannusnäkökulmaan. Tutkimus koostuu teoreettisesta kirjallisuusselvityksestä ja empiirisestä tapaustutkimuksesta. Teoreettisen aineiston ja kohdeyrityksen tietojen perusteella rakennettiin laskentamalli, jonka toimintaa tarkasteltiin esimerkkiprojektien avulla. Työn tutkimusote on konstruktiivinen, osin myös toiminta-analyyttinen. Kehitetty laskentamalli kattaa toimitusprojektin koko elinkaaren. Tarjouslaskenta-vaiheessa sen avulla tehdään päätös projektin toteutuskelpoisuudesta. Toteutus- ja seurantavaiheessa taas sillä seurataan projektin toteutuvia lukuja. Kohdeyritys voi laskentamallin avulla tunnistaa kannattamattomia projekteja, sillä tarjoushinnat tarkistetaan täyskatteellisen kustannusarvion avulla ennen projektin toteutuspäätöstä. Määrälaskennan ja täyskatteellisen laskennan ansiosta aiheuttamisperiaatetta noudatetaan kattavammin kuin kohdeyrityksen aiemmassa käytännössä.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tämän diplomityön tarkoituksena on tutkia teoriatasolla projektien kustannussuunnittelua ja ottaa käyttöön case-yrityksen tarpeisiin sopivat menetelmät ja apuvälineet sahalaitosprojektien kustannussuunnitteluun, -seurantaan ja -hallintaan. Diplomityön rakenne jakaantuu kahteen pääosaan: teoriatutkimukseen ja teoriatutkimuksen soveltamiseen kohdeyrityksessä. Teoriaosuudessa käytetty tutkimusmenetelmä on kvalitatiivinen eli laadullinen tutkimus. Käytännön osuudessa käytetään tutkimustyyppinä tapaustutkimusta eli case-tutkimusta. Case-yritys on sahalaitoksia- ja laitteita valmistava PK-kokoluokan yritys. Työn lopputuloksena yritykselle valittiin teoriatutkimuksen pohjalta sopivat menetelmät sahalaitosprojektien kustannussuunnitteluun, -seurantaan ja –hallintaan. Lisäksi yritykselle kehitettiin projektilaskennan helpottamiseksi kustannuslaskentajärjestelmä, joka sisältää mm. työajanseurantajärjestelmän ja projektilaskentajärjestelmän. Työajanseurantajärjestelmän avulla yrityksen tuotannon henkilökunnan työpanosta pystytään seuraamaan projekti- ja työpakettikohtaisesti. Projektilaskentajärjestelmän avulla taas projektit voidaan budjetoida niin ajallisesti kuin taloudellisesti, ja projektien etenemistä tavoitteisiin verrattuna voidaan seurata erilaisin menetelmin. Järjestelmän avulla saadaan myös tarvittavaa informaatiota ajallisesti pitkien projektien osatuloutukseen.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The European Project Semester at ISEP (EPS@ISEP) is a one semester project-based learning programme addressed to engineering students from diverse scientific backgrounds and nationalities. The students, organized in multicultural teams, are challenged to solve real world multidisciplinary problems, accounting for 30 ECTU. The EPS package, although focused on project development (20 ECTU), includes a series of complementary seminars aimed at fostering soft, project-related and engineering transversal skills (10 ECTU). This paper presents the study plan, resources, operation and results of the EPS@ISEP that was created in 2011 to apply the best engineering education practices and promote the internationalization of ISEP. The results show that the EPS@ISEP students acquire during one semester the scientific, technical and soft competences necessary to propose, design and implement a solution for a multidisciplinary problem.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this thesis is to analyse activity-based costing (ABC) and possible modified versions ofit in engineering design context. The design engineers need cost information attheir decision-making level and the cost information should also have a strong future orientation. These demands are high because traditional management accounting has concentrated on the direct actual costs of the products. However, cost accounting has progressed as ABC was introduced late 1980s and adopted widely bycompanies in the 1990s. The ABC has been a success, but it has gained also criticism. In some cases the ambitious ABC systems have become too complex to build,use and update. This study can be called an action-oriented case study with some normative features. In this thesis theoretical concepts are assessed and allowed to unfold gradually through interaction with data from three cases. The theoretical starting points are ABC and theory of engineering design process (chapter2). Concepts and research results from these theoretical approaches are summarized in two hypotheses (chapter 2.3). The hypotheses are analysed with two cases (chapter 3). After the two case analyses, the ABC part is extended to cover alsoother modern cost accounting methods, e.g. process costing and feature costing (chapter 4.1). The ideas from this second theoretical part are operationalized with the third case (chapter 4.2). The knowledge from the theory and three cases is summarized in the created framework (chapter 4.3). With the created frameworkit is possible to analyse ABC and its modifications in the engineering design context. The framework collects the factors that guide the choice of the costing method to be used in engineering design. It also illuminates the contents of various ABC-related costing methods. However, the framework needs to be further tested. On the basis of the three cases it can be said that ABC should be used cautiously when formulating cost information for engineering design. It is suitable when the manufacturing can be considered simple, or when the design engineers are not cost conscious, and in the beginning of the design process when doing adaptive or variant design. If the design engineers need cost information for the embodiment or detailed design, or if manufacturing can be considered complex, or when design engineers are cost conscious, the ABC has to be always evaluated critically.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The challenges posed by global climate change are motivating the investigation of strategies that can reduce the life cycle greenhouse gas (GHG) emissions of products and processes. While new construction materials and technologies have received significant attention, there has been limited emphasis on understanding how construction processes can be best managed to reduce GHG emissions. Unexpected disruptive events tend to adversely impact construction costs and delay project completion. They also tend to increase project GHG emissions. The objective of this paper is to investigate ways in which project GHG emissions can be reduced by appropriate management of disruptive events. First, an empirical analysis of construction data from a specific highway construction project is used to illustrate the impact of unexpected schedule delays in increasing project GHG emissions. Next, a simulation based methodology is described to assess the effectiveness of alternative project management strategies in reducing GHG emissions. The contribution of this paper is that it explicitly considers projects emissions, in addition to cost and project duration, in developing project management strategies. Practical application of the method discussed in this paper will help construction firms reduce their project emissions through strategic project management, and without significant investment in new technology. In effect, this paper lays the foundation for best practices in construction management that will optimize project cost and duration, while minimizing GHG emissions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Time, cost and quality achievements on large-scale construction projects are uncertain because of technological constraints, involvement of many stakeholders, long durations, large capital requirements and improper scope definitions. Projects that are exposed to such an uncertain environment can effectively be managed with the application of risk management throughout the project life cycle. Risk is by nature subjective. However, managing risk subjectively poses the danger of non-achievement of project goals. Moreover, risk analysis of the overall project also poses the danger of developing inappropriate responses. This article demonstrates a quantitative approach to construction risk management through an analytic hierarchy process (AHP) and decision tree analysis. The entire project is classified to form a few work packages. With the involvement of project stakeholders, risky work packages are identified. As all the risk factors are identified, their effects are quantified by determining probability (using AHP) and severity (guess estimate). Various alternative responses are generated, listing the cost implications of mitigating the quantified risks. The expected monetary values are derived for each alternative in a decision tree framework and subsequent probability analysis helps to make the right decision in managing risks. In this article, the entire methodology is explained by using a case application of a cross-country petroleum pipeline project in India. The case study demonstrates the project management effectiveness of using AHP and DTA.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An inherent weakness in the management of large scale projects is the failure to achieve the scheduled completion date. When projects are planned with the objective of time achievement, the initial planning plays a vital role in the successful achievement of project deadlines. Cost and quality are additional priorities when such projects are being executed. This article proposes a methodology for achieving time duration of a project through risk analysis with the application of a Monte Carlo simulation technique. The methodology is demonstrated using a case application of a cross-country petroleum pipeline construction project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Current engineering education challenges require approaches that promote scientific, technical, design and complementary skills while fostering autonomy, innovation and responsibility. The European Project Semester (EPS) at Instituto Superior de Engenharia do Porto (ISEP) (EPS@ISEP) is a one semester project-based learning programme (30 European Credit Transfer Units (ECTU)) for engineering students from diverse scientific backgrounds and nationalities that intends to address these goals. The students, organised in multidisciplinary and multicultural teams, are challenged to solve real multidisciplinary problems during one semester. The EPS package, although on project development (20 ECTU), includes a series of complementary seminars aimed at fostering soft, project-related and engineering transversal skills (10 ECTU). Hence, the students enrolled in this programme improve their transversal skills and learn, together and with the team of supervisors, subjects distinct from their core training. This paper presents the structure, implementation and results of the EPS@ISEP that was created in 2011 to apply the best engineering practices and promote internationalisation and engineering education innovation at ISEP.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

BACKGROUND The high prevalence of women that do not reach the recommended level of physical activity is worrisome. A sedentary lifestyle has negative consequences on health status and increases health care costs. The main objective of this project is to assess the cost-effectiveness of a primary care-based exercise intervention in perimenopausal women. METHODS/DESIGN The present study is a Randomized Controlled Trial. A total of 150 eligible women will be recruited and randomly assigned to either a 16-week exercise intervention (3 sessions/week), or to usual care (control) group. The primary outcome measure is the incremental cost-effectiveness ratio. The secondary outcome measures are: i) socio-demographic and clinical information; ii) body composition; iii) dietary patterns; iv) glycaemic and lipid profile; v) physical fitness; vi) physical activity and sedentary behaviour; vii) sleep quality; viii) quality of life, mental health and positive health; ix) menopause symptoms. All outcomes will be assessed at baseline and post intervention. The data will be analysed on an intention-to-treat basis and per protocol. In addition, we will conduct a cost effectiveness analysis from a health system perspective. DISCUSSION The intervention designed is feasible and if it proves to be clinically and cost effective, it can be easily transferred to other similar contexts. Consequently, the findings of this project might help the Health Systems to identify strategies for primary prevention and health promotion as well as to reduce health care requirements and costs. TRIAL REGISTRATION ClinicalTrials.gov Identifier: NCT02358109 . Date of registration: 05/02/2015.