968 resultados para delivery time
Resumo:
Four rumen-fistulated Holstein heifers (134 +/- 1 kg initial BW) were used in a 4 x 4 Latin square design to determine the effects of delaying daily feed delivery time on intake, ruminal fermentation, behavior, and stress response. Each 3-wk experimental period was preceded by 1 wk in which all animals were fed at 0800 h. Feed bunks were cleaned at 0745 h and feed offered at 0800 h (T0, no delay), 0900 (T1), 1000 (T2), and 1100 (T3) from d1 to 21 with measurements taken during wk 1 and 3. Heifers were able to see each other at all times. Concentrate and barley straw were offered in separate compartments of the feed bunks, once daily and for ad libitum intake. Ruminal pH and saliva cortisol concentrations were measured at 0, 4, 8, and 12 h postfeeding on d 3 and 17 of each experimental period. Fecal glucocorticoid metabolites were measured on d 17. Increasing length of delay in daily feed delivery time resulted in a quadratic response in concentrate DMI (low in T1 and T2; P = 0.002), whereas straw DMI was greatest in T1 and T3 (cubic P = 0.03). Treatments affected the distribution of DMI within the day with a linear decrease observed between 0800 and 1200 h but a linear increase during nighttimes (2000 to 0800 h), whereas T1 and T2 had reduced DMI between 1200 and 1600 h (quadratic P = 0.04). Water consumption (L/d) was not affected but decreased linearly when expressed as liters per kilogram of DMI (P = 0.01). Meal length was greatest and eating rate slowest in T1 and T2 (quadratic P <= 0.001). Size of the first meal after feed delivery was reduced in T1 on d 1 (cubic P = 0.05) and decreased linearly on d 2 (P = 0.01) after change. Concentrate eating and drinking time (shortest in T1) and straw eating time (longest in T1) followed a cubic trend (P = 0.02). Time spent lying down was shortest and ruminating in standing position longest in T1 and T2. Delay of feeding time resulted in greater daily maximum salivary cortisol concentration (quadratic P = 0.04), which was greatest at 0 h in T1 and at 12 h after feeding in T2 (P < 0.05). Daily mean fecal glucocorticoid metabolites were greatest in T1 and T3 (cubic P = 0.04). Ruminal pH showed a treatment effect at wk 1 because of increased values in T1 and T3 (cubic P = 0.01). Delaying feed delivery time was not detrimental for rumen function because a stress response was triggered, which led to reduced concentrate intake, eating rate, and size of first meal, and increased straw intake. Increased salivary cortisol suggests that animal welfare is compromised.
Resumo:
An accurate estimate of machining time is very important for predicting delivery time, manufacturing costs, and also to help production process planning. Most commercial CAM software systems estimate the machining time in milling operations simply by dividing the entire tool path length by the programmed feed rate. This time estimate differs drastically from the real process time because the feed rate is not always constant due to machine and computer numerical controlled (CNC) limitations. This study presents a practical mechanistic method for milling time estimation when machining free-form geometries. The method considers a variable called machine response time (MRT) which characterizes the real CNC machine`s capacity to move in high feed rates in free-form geometries. MRT is a global performance feature which can be obtained for any type of CNC machine configuration by carrying out a simple test. For validating the methodology, a workpiece was used to generate NC programs for five different types of CNC machines. A practical industrial case study was also carried out to validate the method. The results indicated that MRT, and consequently, the real machining time, depends on the CNC machine`s potential: furthermore, the greater MRT, the larger the difference between predicted milling time and real milling time. The proposed method achieved an error range from 0.3% to 12% of the real machining time, whereas the CAM estimation achieved from 211% to 1244% error. The MRT-based process is also suggested as an instrument for helping in machine tool benchmarking.
Resumo:
OBJECTIVE: To determine whether infusion line compliance contributes to irregular drug delivery during vertical displacement of syringe pumps. DESIGN: Five different commercially available infusion lines were studied at infusion rates of 0.5, 1.0, and 1.5 ml/h. Zero drug delivery time was measured after acute line loop formation (70 cm) using an electronic balance. Compliance of each infusion line was calculated using a pressure transducer and measurement of the occlusion release bolus at 300 mmHg occlusion pressure. Finally, the influence of infusion line compliance on drug delivery during acute lowering of the syringe pump was studied using low- and high-compliance infusion lines. RESULTS: Acute line loop formation resulted in zero drug delivery time from 5.1 +/- 1.5 to 44.0 +/- 6.8 s at flow rates of 0.5 ml/h. Increased flow rates significantly reduced loop-induced flow variability. A close correlation was found between zero drug delivery time and calculated infusion line compliance at 0.5 ml/h (linear regression R2 = 0.79). Lowering of the syringe pump 50 cm prolonged zero drug delivery time from 295.8 +/- 20.7 s with the low-compliance tube to 463.3 +/- 24.0 s with the high-compliance infusion line. CONCLUSIONS: Infusion line compliance contributes to irregular drug delivery associated with vertical displacement of syringe pumps. Siphoning of the infusion line during patient care should be avoided, and flow rates of 1 ml/h or higher are recommended. Low-compliance infusion lines are indicated whenever highly short-acting vasoactive drugs at low delivery rates are administered.
Resumo:
Lyhyet toimitusajat tuovat yrityksille kilpailuetua nopeasti muuttuvassa teollisuusympäristössä. Tämän diplomityön ensisijaisena tavoitteena on löytää kirjallisuuden avulla yrityksen käyttöön soveltuva menetelmä, joka soveltuu systemaattiseen läpimenoaikojen lyhentämiseen. Tärkeää on myös varmistaa valitun menetelmän soveltuvuus kohdeyrityksen ympäristöön. Työn toisena tavoitteena on ymmärtää, että minkälaisella panostuksella yhden päivän läpimenoaika voidaan saavuttaa. Kirjallisuustutkimuksen avulla on valittu tarkoitukseen sopiva toimintamalli. Menetelmä on testattu yhdellä tuotantolinjalla ja saadut tulokset sekä palaute osoittavat, että se näyttäisi soveltuvan kohdeyrityksen käyttöön. Tuotantolinjalle on tehty toimintasuunnitelma yhden päivän toimitusajan saavuttamiseksi vuoden 2013 aikana. Haasteen laajuutta koko kohdeyrityksessä on tutkittu erillisessä ideointisessiossa. Session tulosten perusteella on tehty prioriteettilista, joka antaa käsityksen toimitusajan merkittävän lyhentämisen vaatimuksista. Yleisesti ottaen kysynnän vaihtelun hallinta on suurin haaste, mutta useita ratkaisuvaihtoehtoja tämän hallitsemiseksi on tunnistettu.
Resumo:
This paper applies the concepts and methods of complex networks to the development of models and simulations of master-slave distributed real-time systems by introducing an upper bound in the allowable delivery time of the packets with computation results. Two representative interconnection models are taken into account: Uniformly random and scale free (Barabasi-Albert), including the presence of background traffic of packets. The obtained results include the identification of the uniformly random interconnectivity scheme as being largely more efficient than the scale-free counterpart. Also, increased latency tolerance of the application provides no help under congestion.
Resumo:
An accurate estimate of machining time is very important for predicting delivery time, manufacturing costs, and also to help production process planning. Most commercial CAM software systems estimate the machining time in milling operations simply by dividing the entire tool path length by the programmed feed rate. This time estimate differs drastically from the real process time because the feed rate is not always constant due to machine and computer numerical controlled (CNC) limitations. This study presents a practical mechanistic method for milling time estimation when machining free-form geometries. The method considers a variable called machine response time (MRT) which characterizes the real CNC machine's capacity to move in high feed rates in free-form geometries. MRT is a global performance feature which can be obtained for any type of CNC machine configuration by carrying out a simple test. For validating the methodology, a workpiece was used to generate NC programs for five different types of CNC machines. A practical industrial case study was also carried out to validate the method. The results indicated that MRT, and consequently, the real machining time, depends on the CNC machine's potential: furthermore, the greater MRT, the larger the difference between predicted milling time and real milling time. The proposed method achieved an error range from 0.3% to 12% of the real machining time, whereas the CAM estimation achieved from 211% to 1244% error. The MRT-based process is also suggested as an instrument for helping in machine tool benchmarking.
Resumo:
In an effort to reduce Interlibrary borrowing activity, while enhancing the Library collection, the Bertrand Library has initiated a program to purchase current monographs requested through ILL by Bucknell University students and faculty. The results have been a successful reduction in ILL workload, and a cost-effective means of document delivery as measured by average delivery time, cost-per-title, processing costs, and circulation statistics. This procedure reflects an overall change in our philosophy concerning document access and delivery, which led to the reorganization of ILL services and staff in the Bertrand Library.
Resumo:
In the standard Vehicle Routing Problem (VRP), we route a fleet of vehicles to deliver the demands of all customers such that the total distance traveled by the fleet is minimized. In this dissertation, we study variants of the VRP that minimize the completion time, i.e., we minimize the distance of the longest route. We call it the min-max objective function. In applications such as disaster relief efforts and military operations, the objective is often to finish the delivery or the task as soon as possible, not to plan routes with the minimum total distance. Even in commercial package delivery nowadays, companies are investing in new technologies to speed up delivery instead of focusing merely on the min-sum objective. In this dissertation, we compare the min-max and the standard (min-sum) objective functions in a worst-case analysis to show that the optimal solution with respect to one objective function can be very poor with respect to the other. The results motivate the design of algorithms specifically for the min-max objective. We study variants of min-max VRPs including one problem from the literature (the min-max Multi-Depot VRP) and two new problems (the min-max Split Delivery Multi-Depot VRP with Minimum Service Requirement and the min-max Close-Enough VRP). We develop heuristics to solve these three problems. We compare the results produced by our heuristics to the best-known solutions in the literature and find that our algorithms are effective. In the case where benchmark instances are not available, we generate instances whose near-optimal solutions can be estimated based on geometry. We formulate the Vehicle Routing Problem with Drones and carry out a theoretical analysis to show the maximum benefit from using drones in addition to trucks to reduce delivery time. The speed-up ratio depends on the number of drones loaded onto one truck and the speed of the drone relative to the speed of the truck.
Resumo:
Mestrado em Engenharia Mecânica. Gestão de Processos e Operações.
Resumo:
OBJECTIVE: To describe the patterns of deliveries in a birth cohort and to compare vaginal and cesarean section deliveries. METHODS: All children born to mothers from the urban area of Pelotas, Brazil, in 2004, were recruited for a birth cohort study. Mothers were contacted and interviewed during their hospital stay when extensive information on the gestation, the birth and the newborn, along with maternal health history and family characteristics was collected. Maternal characteristics and childbirth care financing - either private or public healthcare (SUS) patients - were the main factors investigated along with a description of C-sections distribution according to day of the week and delivery time. Standard descriptive techniques, Χ² tests for comparing proportions and Poisson regression to explore the independent effect of C-section predictors were the methods used. RESULTS: The overall C-section rate was 45%, 36% among SUS and 81% among private patients, where 35% of C-sections were reported elective. C-sections were more frequent on Tuesdays and Wednesdays, reducing by about a third on Sundays, while normal deliveries had a uniform distribution along the week. Delivery time for C-sections was markedly different among public and private patients. Maternal schooling was positively associated with C-section among SUS patients, but not among private patients. CONCLUSIONS: C-sections were almost universal among the wealthier mothers, and strongly related to maternal education among SUS patients. The patterns we describe are compatible with the idea that C-sections are largely done to suit the doctor's schedule. Drastic action is called for to change the current situation.
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Informática
Resumo:
A manutenção é uma área extremamente importante, principalmente na indústria. Devidamente organizada, permitirá um fluxo produtivo devidamente planeado e executado, que permitirá a qualquer empresa manter o nível de facturação desejado e o prazo de entrega acordado com os clientes. De outra forma, poderá originar o caos. No entanto, os desafios de gestão da produção mais correntes, nomeadamente através do Lean Manufacturing, passam a exigir um pouco mais do que uma simples manutenção. Torna-se obrigatório fazer análises económicas que permitam averiguar quando cada equipamento passa a exigir custos de manutenção excessivos, os quais poderão obrigar a um recondicionamento mais acentuado do equipamento, o qual pode passar inclusivamente por uma melhoria da sua performance. Nestes casos, terá que existir uma “cumplicidade” entre a Direcção de Produção e a Manutenção, no sentido de averiguar o melhor momento para proceder a uma melhoria do equipamento, numa perspectiva de funcionamento global em linha de produção, adaptando-o à performance que será exigida ao conjunto. Neste domínio, o Projecto passa a prestar um serviço valiosíssimo à empresa, integrando-se no conjunto Produção + Manutenção, criando valor na intervenção, através do desenvolvimento de um trabalho que permite não só repor o estado natural da produção, mas sim promover uma melhoria sustentada da mesma. Este trabalho pretende reflectir e avaliar a relevância do Projecto neste tipo de operações, contribuindo de uma forma sistemática e sustentada para a melhoria contínua dos processos de fabrico. É apresentado um caso de estudo que pretende validar todo o desenvolvimento anteriormente realizado na matéria.
Resumo:
As operações de maquinagem de componentes tendo em vista os mais diversos sectores de actividade têm registado um crescimento sustentável em Portugal, devido a inúmeros factores como a modernização do nosso parque de equipamentos, a competitividade da nossa mão-de-obra e a qualidade patenteada pelos serviços prestados pelas nossas empresas, cada vez mais conscientes da importância que os clientes internacionais assumem na sua actividade, da necessidade de cumprimento dos compromissos estabelecidos em termos de prazo de entrega e da procura incessante de novos mercados e sectores de actividade que potenciem um valor-acrescentado mais atractivo do produto. As solicitações do mercado no sector de actividade de prestação de serviços de maquinagem são imensas, e sempre extremamente condicionadas em termos de tempo de resposta. Por outro lado, os prestadores deste tipo de serviço ficam limitados por duas situações-limite: uma orçamentação por defeito poderá conduzir a prejuízos indesejáveis, ou mesmo incomportáveis, enquanto um preço excessivamente elevado poderá afastar o possível cliente e impedir a conquista de um novo projecto. Orçamentar depressa e bem é uma operação complexa, que requer uma análise muito cuidada dos desenhos fornecidos pelo possível cliente, delinear a sequência operatória, salvaguardar as tolerâncias e tipos de acabamento pretendidos, minimizar as operações de fixação e seleccionar as melhores ferramentas para efectuar o trabalho pretendido. Este trabalho, desenvolvido para a TECNOLANEMA, empresa do Grupo LANEMA, que é especialista na produção de peças em plástico técnico e em ligas de alumínio para os mais diversos sectores de actividade, tanto em Portugal como no Estrangeiro. O trabalho desenvolvido visou criar uma aplicação informática que permitisse elaborar orçamentos de forma rápida e precisa, através de determinados factores-chave previamente estudados. O projecto foi concluído e testado com sucesso na empresa.
Resumo:
PURPOSE: To determine the incidence and characteristics of nonimmune hydrops fetalis in the newborn population. METHOD: A retrospective study of the period between 1996 and 2000, including all newborns with a prenatal or early neonatal diagnosis of nonimmune hydrops fetalis, based on clinical history, physical examination, and laboratory evaluation. The following were analyzed: prenatal follow-up, delivery type, gender, birth weight, gestational age, presence of perinatal asphyxia, nutritional classification, etiopathic diagnosis, length of hospital stay, mortality, and age at death. RESULTS: A total of 47 newborns with hydrops fetalis (0.42% of live births), 18 (38.3%) with the immune form and 29 (61.7%) with the nonimmune form, were selected for study. The incidence of nonimmune hydrops fetalis was 1 per 414 neonates. Data was obtained from 21 newborns, with the following characteristics: 19 (90.5%) were suspected from prenatal diagnosis, 18 (85.7%) were born by cesarean delivery, 15 (71.4%) were female, and 10 (47.6%) were asphyxiated. The average weight was 2665.9 g, and the average gestational age was 35 3/7 weeks; 14 (66.6%) were preterm; 18 (85.0 %) appropriate delivery time; and 3 (14.3%) were large for gestational age. The etiopathic diagnosis was determined for 62%, which included cardiovascular (19.0%), infectious (9.5%), placental (4.8%), hematologic (4.7%), genitourinary (4.8%), and tumoral causes (4.8%), and there was a combination of causes in 9.5%. The etiology was classified as idiopathic in 38%. The length of hospital stay was 26.6 ± 23.6 days, and the mortality rate was 52.4%. CONCLUSIONS: The establishment of a suitable etiopathic diagnosis associated with prenatal detection of nonimmune hydrops fetalis can be an important step in reducing the neonatal mortality rate from this condition.
Resumo:
Delay Tolerant Network (DTN) is a communication architecture enabling connectivity in a topology with unregular end-to-end network connection. DTN enables communication in environments with cross-connectivity, large delays and delivery time variations, and a high error rate. DTN can be used in vehicular networks where public transport get involved. This research aims to analyze the role of public transit as a DTN routing infrastructure. The impact of using public transit as a relay router is investigated by referencing the network performance, defined by its delivery ratio, average delay and overhead. The results show that public transit can be used as a backbone for DTN in an urban scenario using existing protocols. This opens insights for future researches on routing algorithm and protocol design.