985 resultados para Project manager competence
Resumo:
Programa de doctorado: Restauración y rehabilitación arquitetónica. Investigación, tendencias e innovaciones. La fecha de publicación es la fecha de lectura
Resumo:
The acquisition of technical, contextual and behavioral competences is a prerequisite for sustainable development and strengthening of rural communities. Territorial display of the status of these skills helps to design the necessary learning, so its inclusion in planning processes is useful for decision making. The article discusses the application of visual representation of competences in a rural development project with Aymara women communities in Peru. The results show an improvement of transparency and dialogue, resulting in a more successful project management and strengthening of social organization.
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)
Resumo:
Mode of access: Internet.
Resumo:
The project management literature on project success is rich. Numerous papers focus on the evolution of the understanding of project success, identification of success criteria and critical success factors. Critical success factors increase the potential for achieving project success, while project success can be evaluated with the help of success criteria. Although the interrelationships between critical success factors and success criteria are rarely analyzed, yet there is a strong demand for it. The aim of this paper is twofold. One of the aims is to identify the impact of one of the critical success factors, the project manager’s project management attitude on project success. The other aim is to highlight the interrelationship between the project manager’s personal characteristics and project management attitude and leadership style, which are three critical success factors. These aim to address the shortcoming mentioned above, which is considering the lack of the interrelationships between critical success factors and success criteria. The research outcomes are drawn from qualitative field research at the Hungarian subsidiaries of multinational companies operating in the ICT sector.
Resumo:
Diplomityön keskeisimpinä tavoitteina kohdeyritykselle oli ymmärtää liiketoiminnan muutoksen elementtejä, arvioida projektijohtamisen kyvykkyyden vaatimuksia sekä tunnistaa kehitystarpeita projektinjohtamisen uusille toimintatavoille toimitusprojekteissa. Projektijohtamisen ja -hallinnan kehittäminen on viime vuosien aikana noussut niin yritysten kuin akateemisten yhteisöjen mielenkiinnon kohteeksi. Kirjallisuuskatsauksessa laaja-alaisen ymmärryksen luomiseksi projektijohtamisen viitekehystä tarkasteltiin liiketoiminnan muutoksen, arvontuoton, ulkoistamisen ja osaamisen näkökulmista. Muodostettua viitekehystä hyödynnettiin empiirisen kyselytutkimuksen suunnittelussa ja tulosten analysoinnissa. Tuloksista keskeisimpänä todetaan, että arvontuotto projektijohtamisen palveluissa ainakin projektipäälliköiden osalta kohdistuu osaamiseen, kokemukseen ja johtamistaitoihin. Palveluliiketoimintaan suuntautuminen edellyttää tuotteiden määrittämistä prosesseiksi. Samoin projektijohtamisen kohentaminen vaatii toimintatapamuutoksia, kommunikoinnin parantamista ja kyvykkyyden nostoa. Työn tuloksena tehtiin suosituksia kohdeyritykselle, joiksi määrittyivät projektijohtamisen käytäntöjen kehittäminen, projektitoimiston perustaminen ja arvontuoton terävöittäminen liiketoimintamallin muokkauksella.
Resumo:
This paper proposes the joint use of the AHP (Analytic Hierarchy Process) and the ICB (IPMA Competence Baseline), as a tool for the decision-making process of selecting the most suitable managers for projects. A hierarchical structure, comprising the IPMA’s ICB 3.0 contextual, behavioural and technical competence elements, is constructed for the selection of project managers. It also describes the AHP implementation, illustrating the whole process with an example using all the 46 ICB competence elements as model criteria. This tool can be of high interest to decision-makers because it allows comparing the candidates for managing a project using a systematic and rigorous process with a rich set of proven criteria.
Resumo:
Trabalho de natureza profissional para a atribuição do Título de Especialista do Instituto Politécnico do Porto, na área de Design, defendido a 23-03-2015.
Resumo:
Com este trabalho pretendemos desenvolver um projeto de intervenção no âmbito do Mapeamento de Competências, a implementar na Amorim & Irmãos, SA, a Entidade Acolhedora do Projeto. O diagnóstico realizado à Função Recursos Humanos permitiu identificar como potencial de intervenção o Mapeamento de Competências Chave. As Competências Chave são fundamentais para a operacionalização da missão e visão das organizações. Nos contextos de atuação global das empresas prevalece a incerteza e a necessidade de constantes readaptações da estrutura organizativa para garantir o sucesso dos planos estratégicos do negócio. Neste contexto empresarial, os modelos de gestão das pessoas assentes na Avaliação e Gestão de Competências são uma resposta adequada aos ciclos frequentes de mudança organizacional. O Mapeamento de Competências é, neste quadro de atuação das empresas, fundamental para a necessária adequação das competências dos colaboradores à operacionalização do plano estratégico do negócio. Assim, optamos pela conceção de um projeto de intervenção para Mapeamento das Competências Chave focado nas chefias de uma unidade industrial produtora de rolhas de cortiça. A metodologia adotada para a implementação deste projeto parte dos elementos estratégicos da empresa: Fatores Críticos de Sucessos, Pontos Fortes e Pontos Fracos. Foram definidos dois âmbitos para a implementação de uma estratégia de mapeamento de competências de cima para baixo: (1) identificação das Competência Chave e (2) definição da Competências Chave. Na implementação deste projeto intervieram vários interlocutores: as chefias intermedias da Unidade Industrial de Lamas, o Diretor de Logística, o Diretor de Recursos Humanos e um Técnico de Recursos Humanos que, sob a gestão do autor do projeto, manifestaram ao longo de todo o processo o envolvimento e compromisso indispensáveis para a sua concretização. Os resultados da avaliação permitem concluir que o projeto planeado e implementado atingiu a finalidade proposta: ter validado, em novembro de 2015, o Portfólio das Competências Chave Transversais e as Competências Chave Específicas das chefias intermedias da Unidade Industrial de Lamas, necessárias para a sustentabilidade do negócio da Amorim & Irmãos, SA.
Resumo:
The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.
Resumo:
Tämän hetken trendit kuten globalisoituminen, ympäristömme turbulenttisuus, elintason nousu, turvallisuuden tarpeen kasvu ja teknologian kehitysnopeus korostavatmuutosten ennakoinnin tarpeellisuutta. Pysyäkseen kilpailukykyisenä yritysten tulee kerätä, analysoida ja hyödyntää liiketoimintatietoa, jokatukee niiden toimintaa viranomaisten, kilpailijoiden ja asiakkaiden toimenpiteiden ennakoinnissa. Innovoinnin ja uusien konseptien kehittäminen, kilpailijoiden toiminnan arviointi, asiakkaiden tarpeet muun muassa vaativatennakoivaa arviointia. Heikot signaalit ovat keskeisessä osassa organisaatioiden valmistautumisessa tulevaisuuden tapahtumiin. Opinnäytetyön tarkoitus on luoda ja kehittää heikkojen signaalien ymmärrystä ja hallintaa sekäkehittää konseptuaalinen ja käytännöllinen lähestymistapa ennakoivan toiminnan edistämiselle. Heikkojen signaalien tyyppien luokittelu perustuu ominaisuuksiin ajan, voimakkuuden ja liiketoimintaan integroinnin suhteen. Erityyppiset heikot signaalit piirteineen luovat reunaehdot laatutekijöiden keräämiselle ja siitä edelleen laatujärjestelmän ja matemaattiseen malliin perustuvan työvälineen kehittämiselle. Heikkojen signaalien laatutekijät on kerätty yhteen kaikista heikkojen signaalien konseptin alueista. Analysoidut ja kohdistetut laatumuuttujat antavat mahdollisuuden kehittää esianalyysiä ja ICT - työvälineitä perustuen matemaattisen mallin käyttöön. Opinnäytetyön tavoitteiden saavuttamiseksi tehtiin ensin Business Intelligence -kirjallisuustutkimus. Hiekkojen signaalien prosessi ja systeemi perustuvat koottuun Business Intelligence - systeemiin. Keskeisinä kehitysalueina tarkasteltiin liiketoiminnan integraatiota ja systemaattisen menetelmän kehitysaluetta. Heikkojen signaalien menetelmien ja määritelmien kerääminen sekä integrointi määriteltyyn prosessiin luovat uuden konseptin perustan, johon tyypitys ja laatutekijät kytkeytyvät. Käytännöllisen toiminnan tarkastelun ja käyttöönoton mahdollistamiseksi toteutettiin Business Intelligence markkinatutkimus (n=156) sekä yhteenveto muihin saatavilla oleviin markkinatutkimuksiin. Syvähaastatteluilla (n=21) varmennettiin laadullisen tarkastelun oikeellisuus. Lisäksi analysoitiin neljä käytännön projektia, joiden yhteenvedot kytkettiin uuden konseptin kehittämiseen. Prosessi voidaan jakaa kahteen luokkaan: yritysten markkinasignaalit vuoden ennakoinnilla ja julkisen sektorin verkostoprojektit kehittäen ennakoinnin struktuurin luonnin 7-15 vuoden ennakoivalle toiminnalle. Tutkimus rajattiin koskemaan pääasiassa ulkoisen tiedon aluetta. IT työvälineet ja lopullisen laatusysteemin kehittäminen jätettiin tutkimuksen ulkopuolelle. Opinnäytetyön tavoitteena ollut heikkojen signaalien konseptin kehittäminen toteutti sille asetetut odotusarvot. Heikkojen signaalien systemaattista tarkastelua ja kehittämistyötä on mahdollista edistää Business Intelligence - systematiikan hyödyntämisellä. Business Intelligence - systematiikkaa käytetään isojen yritysten liiketoiminnan suunnittelun tukena.Organisaatioiden toiminnassa ei ole kuitenkaan yleisesti hyödynnetty laadulliseen analyysiin tukeutuvaa ennakoinnin weak signals - toimintaa. Ulkoisenja sisäisen tiedon integroinnin ja systematiikan hyödyt PK -yritysten tukena vaativat merkittävää panostusta julkishallinnon rahoituksen ja kehitystoiminnan tukimuotoina. Ennakointi onkin tuottanut lukuisia julkishallinnon raportteja, mutta ei käytännön toteutuksia. Toisaalta analysoitujen case-tapausten tuloksena voidaan nähdä, ettei organisaatioissa välttämättä tarvita omaa projektipäällikköä liiketoiminnan tuen kehittämiseksi. Business vastuun ottamiseksi ja asiaan sitoutumiseen on kuitenkin löydyttävä oikea henkilö
Resumo:
The purpose of the Master’s Thesis is to study the best practices to virtual project management from the project manager’ point of view. The best practices are divided according to a five-phase virtual project life cycle model. Each phase include concrete suggestions for actions. Research’s theoretical background is wide because of the broad subject matter. In the theoretical part topics such as virtual working, virtual project management challenges are examined and some concrete actions to tackle these challenges are introduced. Thesis’ approach is constructive, where a known problem is solved piece by piece after creating a pre-understanding of the topic. Existing research work is utilized when creating a model for virtual project team management. The basis of the model comes from various best practices read from literature and from the interviews conducted on experienced virtual project managers in the case organization. As a result the model combines both previous research and the organizations empirical experience. As an output of the thesis a model for virtual project team management is developed, which can be used as a guideline by the virtual project managers in their work. The model includes actions and practices what can be used to overcome the challenges of virtual project management.
Resumo:
The purpose of the study is to find factors affecting projects' profitability in project business. The issue is approached from customer profitability and project management point of view. The study has been made for a big Finnish company acting in a global market place. The research method is quantitative. Research hypotheses are based on the literature. The used database is originated from the company's ERP- (enterprise resource planning) and project financial follow-up —system. The findings of the study supported the hypotheses weakly. Obviously profitability fluctuated depending on a customer and a project manager. The reasons could not be justified with the variables used in the research.
Resumo:
The main goal of this thesis was to examine how the emotional intelligence skills and multicultural project leadership style of a project manager interrelate and affect the success of a project. The research methods used are literature review in theoretical part of the thesis and semi-structured interviews in empirical part of the thesis. This study is a single case study i.e. one case company was selected to be the secondary level of analysis. Within the case company, four project managers were selected as research units to form the primary level of analysis. Literature review formed the basis for the empirical research and the interview questions were derived from the literature. Findings from the interviews were mirrored against the literature review findings, based on which both conclusions and generalisations could be made. Thus, both deductive and inductive methods were utilised to get more complete picture about the research topic. In the first part of the literature review the general leadership theories and the project leadership terminology are introduced as a background for the concept of emotional intelligence and the integrated leadership model. Emotional intelligence and its interrelation to different leadership concepts are discussed during the literature review. Chinese cultural aspects affecting the way of making business, and the multicultural leadership styles of the Finnish project managers are introduced in the following part of the literature review. It was found that the most successfully used multicultural leadership styles in Finnish-Chinese context are synergistic and polycentric, and these require emotional intelligence skills. In the empirical part on this thesis the findings from the semi-structured interviews are introduced, discussed and analysed. Interviews were done in private meeting rooms, and they were recorded and transcripted to add reliability and validity. Although the sample was only four project managers, the results show that the sample is quite saturated as the responses to several questions followed the same pattern. It was found that Finnish project managers in the case company are democratic and take cultural differences into account in their project leadership. Both synergistic and polycentric leadership styles are used with Chinese team members. Emotional intelligence capabilities and the emphasis of those differ a bit depending on the interviewee. Though, the results show that EI skills and the multicultural project leadership style used in Chinese context are interrelated. The findings from the literature review and the empirical research in this thesis are similar. Though, there is need for further research as the sample was small, and this thesis is a single case study. It is recommendable to make a multi-company study with larger sample of project managers. Also multi-industry perspective is recommendable for further research.