904 resultados para Costing methodologies


Relevância:

70.00% 70.00%

Publicador:

Resumo:

In recent years, there has been growing emphasis on the need to provide transparency in the costs of engineering programmes, leading to growing emphasis on Whole Life Cost (WLC) modelling techniques. This has arisen largely due to the increased interested in longer timescale projects and programmes, combined with the emergence of system-of-systems and network enabled capability concepts. This change in the implementation and management of large scale projects has necessitated the development of alternative methods of evaluating performance. This work seeks to address the shortfalls in current costing methodologies when applied to these highly flexible environments, and to propose a conceptual model for dealing with the encountered complexities. The approach has a fundamental role and potential significance in the future of whole life costing for Network Enabled Capability (NEC) but can also offer a potential paradigm shift for costing in traditional engineering environments.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A implantação de sistemas de custos no setor público tem sido apontada como uma necessidade gerencial primordial para se alcançar as dimensões dos princípios da eficiência, eficácia e efetividade na administração pública, fato que proporcionaria a otimização do uso dos escassos recursos disponíveis. Com o advento da Lei de Responsabilidade Fiscal entrou em evidência a discussão sobre o tema no cenário nacional, sendo mais recentemente criada no governo federal uma comissão interministerial de custos com objetivo de elaborar estudos e propor diretrizes, métodos e procedimentos para subsidiar a implantação de Sistemas de Custos na Administração Pública Federal. Tendo em vistas essas necessidades, o presente trabalho tem por objetivo principal verificar a adequabilidade do Sistema Gerencial de Custos (SISCUSTOS) implantado no Exército Brasileiro permite a apuração de custos sob a ótica da teoria contábil e complementarmente analisar se o sistema de custos adequasse as metodologias do custeio ABC e fornece subsídios para a tomada de decisões. Para isso realizou-se um estudo de caso de natureza qualitativa, coletando-se dados de fontes primárias e secundárias, além de entrevistas com os servidores responsáveis pelo desenvolvimento, implantação e operacionalização do sistema. O resultado verificado foi que as funcionalidades disponibilizadas pelo SISCUSTOS vislumbram a aderência do sistema com o plano teórico, permitindo que as informações extraídas da contabilidade governamental contemporânea sejam ajustadas, para uma possível aproximação da contabilidade orçamentária com a contabilidade patrimonial, necessitando apenas de alguns ajustes para itens aqui denominados como peculiares da contabilidade governamental. No caso do método de custeio ABC observou-se que a metodologia está sendo subtilizada, e que o grau desejado em extrair todas as contribuições disponibilizadas pelo ABC somente virá com a maturidade da gestão de custos, sendo que, para atingir tais objetivos haverá a necessidade de se fixar como atributos cognitivos os 4C - Cultura de Custos, Comprometimento, Competição e Confiabilidade - entre os usuários do sistema e a alta administração.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

RESUMO - Introdução: A integração vertical de cuidados surge em Portugal em 1999 com a criação da primeira Unidade Local de Saúde (ULS) em Matosinhos. Este modelo de gestão tem como principal objetivo reorganizar o sistema para responder de forma mais custo-efetiva às necessidades atuais. Objetivo: Analisar o impacto da criação das ULS nos custos do internamento hospitalar português. Metodologia: Para apurar o custo médio estimado por episódio de internamento hospitalar utilizou-se a metodologia dos Custos Estimados com base na Contabilidade Analítica. Contudo, não foram imputados custos por diária de internamento por centro de produção, mas apenas por doente saído em determinado hospital. Para efeitos de comparação dos modelos de gestão organizacionais consideraram-se variáveis demográficas e variáveis de produção. Resultados: Da análise global, os hospitais integrados em ULS apresentam um custo médio estimado por episódio de internamento inferior quando comparados com os restantes. Em 2004 os hospitais sem modelo de integração vertical de cuidados apresentam uma diferença de custos de aproximadamente 714,00€. No ano 2009, último ano em análise, esta diferença é mais ténue situando-se nos 232,00€ quando comparados com hospitais integrados em ULS. Discussão e Conclusão: Não existe uma tendência definida no que respeita à diferença de custos quando se comparam os diferentes modelos organizacionais. É importante que em estudos futuros se alargue a amostra ao total de prestadores e se aprofundem os fatores que influênciam os custos de internamento. A compreensão dos indicadores sociodemográficos, demora média, e produção realizada, numa ótica de custo efetividade e qualidade, permitirá resultados com menor grau de viés.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Supply Chain Simulation (SCS) is applied to acquire information to support outsourcing decisions but obtaining enough detail in key parameters can often be a barrier to making well informed decisions.
One aspect of SCS that has been relatively unexplored is the impact of inaccurate data around delays within the SC. The impact of the magnitude and variability of process cycle time on typical performance indicators in a SC context is studied.
System cycle time, WIP levels and throughput are more sensitive to the magnitude of deterministic deviations in process cycle time than variable deviations. Manufacturing costs are not very sensitive to these deviations.
Future opportunities include investigating the impact of process failure or product defects, including logistics and transportation between SC members and using alternative costing methodologies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El estudio de la calidad de servicio en transporte público ha tenido distintos enfoques, tanto en la investigación como en sus aplicaciones prácticas, tales como el desarrollo del método SERVQUAL, los proyectos QUATTRO y EQUIP de la Comisión Europea, el Transit Capacity and Quality of Service Manual y finalmente el estándar EN 13816, siendo la consideración principal la calidad desde el punto de vista del usuario, es decir, la calidad percibida, cuyo objetivo en la práctica trata de obtener un Índice de Satisfacción del Cliente como medida de la calidad global. Esta aproximación deja de lado aspectos tanto sobre calidad suministrada como sobre los suministradores del servicio, las administraciones y los operadores, particularmente en cuanto a las implicaciones económicas. El objetivo principal de la presente tesis es la estimación del impacto económico real de la mejora de atributos de calidad para un operador de autobús urbano. En el capítulo 2, se lleva a cabo un análisis del estado del arte sobre el estudio de la calidad, tanto de los métodos de estudio, como de su aplicación al campo de transporte público, y, específicamente, del estudio de costes. En los capítulos 3 y 4 se propone la aplicación de la metodología ABC (Activity Based Costing) para el caso de un contrato de servicio de transporte público en autobús en la Comunidad de Madrid, concretamente la conexión de Tres Cantos. Para ello se utilizan datos de encuestas de calidad esperada y percibida por los usuarios, junto con información económica y de actividad, así como entrevistas a personal de la empresa, conformando todo ello una metodología compacta de investigación y análisis. Los resultados de las encuestas y los análisis posteriores identificaron la frecuencia de servicio, la puntualidad de los autobuses y la seguridad de la conducción como las tres variables mas importantes desde el punto de vista del usuario, y ha sido en referencia a estas tres variables sobre las que se ha desarrollado la aplicación del método ABC contenida en el capítulo 5. Los resultados descritos en el capítulo 6 muestran la consistencia y la aplicabilidad de esta metodología, superando las simplificaciones de los procedimientos tradicionales contables. En cuanto a los resultados obtenidos, se ha comprobado que una aproximación tradicional basada en costes por kilometro puede llegar a sobrevalorar los costes asociados a mejoras de calidad hasta tres veces los costes calculados según el método ABC. Finalmente en el capítulo 7 se recogen las principales conclusiones y se apuntan algunas líneas futuras de investigación basadas en mejoras sobre la aplicación y transferibilidad de los resultados. The study of service quality and its implication for transport contracts has several approaches in research and practical applications, such as the development of the SERVQUAL method, the UE QUATTRO and EQUIP research projects, the Transit Capacity and Quality of Service Manual and finally the EN 13816 standard. In all cases the main stream is the consideration of quality from the user’s point of view, thus obtaining a Customer Satisfaction Index as a measurement of the overall service quality. This approach ignores quality consequences for transport providers, authorities and operators, particularly economic implications. The main target of this thesis is to estimate the real economic impact of improving quality attributes for a bus operator. Chapter 2 includes a thorough analysis of the state of the art of general methodologies on service quality, their applications for public transport, and particularly for quality costing. In chapters 3 and 4, the Activity Based Costing (ABC) methodology is proposed for a suburban bus contract in Madrid, Tres Cantos. Perceived and expected quality surveys are used together with economic and performance information, as well as interviews with key staff from the operator. The whole set of surveys, interviews and ABC methodology puts together a comprehensive approach for analysis and research. Surveys and subsequent analysis shows service headway, punctuality and safety as the three most important service attributes from the user’s point of view. The proposed methodology has been applied to these three variables, as described in chapter 5. Results obtained in chapter 6 show the consistency and practicality of this methodology, overcoming simplifications from traditional accounting procedures. According to the latter, a calculation of costs based on mileage can overvalue quality improvements up to three times the results following ABC methodology. Finally, in chapter 7, the main conclusions are highlighted and some future research is suggested in terms of application improvements as well as results transferability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Queensland Department of Main Roads, Australia, spends approximately A$ 1 billion annually for road infrastructure asset management. To effectively manage road infrastructure, firstly road agencies not only need to optimise the expenditure for data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. This paper presents the results of case studies in using the probability-based method for an integrated approach (i.e. assessing optimal costs of pavement strength data collection; calibrating deterioration prediction models that suit local condition and assessing risk-adjusted budget estimates for road maintenance and rehabilitation for assessing life-cycle budget estimates). The probability concept is opening the path to having the means to predict life-cycle maintenance and rehabilitation budget estimates that have a known probability of success (e.g. produce budget estimates for a project life-cycle cost with 5% probability of exceeding). The paper also presents a conceptual decision-making framework in the form of risk mapping in which the life-cycle budget/cost investment could be considered in conjunction with social, environmental and political issues.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper is the second in a pair that Lesh, English, and Fennewald will be presenting at ICME TSG 19 on Problem Solving in Mathematics Education. The first paper describes three shortcomings of past research on mathematical problem solving. The first shortcoming can be seen in the fact that knowledge has not accumulated – in fact it has atrophied significantly during the past decade. Unsuccessful theories continue to be recycled and embellished. One reason for this is that researchers generally have failed to develop research tools needed to reliably observe, document, and assess the development of concepts and abilities that they claim to be important. The second shortcoming is that existing theories and research have failed to make it clear how concept development (or the development of basic skills) is related to the development of problem solving abilities – especially when attention is shifted beyond word problems found in school to the kind of problems found outside of school, where the requisite skills and even the questions to be asked might not be known in advance. The third shortcoming has to do with inherent weaknesses in observational studies and teaching experiments – and the assumption that a single grand theory should be able to describe all of the conceptual systems, instructional systems, and assessment systems that strongly molded and shaped by the same theoretical perspectives that are being used to develop them. Therefore, this paper will describe theoretical perspectives and methodological tools that are proving to be effective to combat the preceding kinds or shortcomings. We refer to our theoretical framework as models & modeling perspectives (MMP) on problem solving (Lesh & Doerr, 2003), learning, and teaching. One of the main methodologies of MMP is called multi-tier design studies (MTD).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Machine downtime, whether planned or unplanned, is intuitively costly to manufacturing organisations, but is often very difficult to quantify. The available literature showed that costing processes are rarely undertaken within manufacturing organisations. Where cost analyses have been undertaken, they generally have only valued a small proportion of the affected costs, leading to an overly conservative estimate. This thesis aimed to develop a cost of downtime model, with particular emphasis on the application of the model to Australia Post’s Flat Mail Optical Character Reader (FMOCR). The costing analysis determined a cost of downtime of $5,700,000 per annum, or an average cost of $138 per operational hour. The second section of this work focused on the use of the cost of downtime to objectively determine areas of opportunity for cost reduction on the FMOCR. This was the first time within Post that maintenance costs were considered along side of downtime for determining machine performance. Because of this, the results of the analysis revealed areas which have historically not been targeted for cost reduction. Further exploratory work was undertaken on the Flats Lift Module (FLM) and Auto Induction Station (AIS) Deceleration Belts through the comparison of the results against two additional FMOCR analysis programs. This research has demonstrated the development of a methodical and quantifiable cost of downtime for the FMOCR. This has been the first time that Post has endeavoured to examine the cost of downtime. It is also one of the very few methodologies for valuing downtime costs that has been proposed in literature. The work undertaken has also demonstrated how the cost of downtime can be incorporated into machine performance analysis with specific application to identifying high costs modules. The outcome of this report has both been the methodology for costing downtime, as well as a list of areas for cost reduction. In doing so, this thesis has outlined the two key deliverables presented at the outset of the research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sustainable development is about making societal investments. These investments should be in synchronization with the natural environment, trends of social development, as well as organisational and local economies over a long time span. Traditionally in the eyes of clients, project development will need to produce the required profit margins, with some degrees of consideration for other impacts. This is being changed as all citizens of our society are becoming more aware of concepts and challenges such as the climate change, greenhouse footprints, and social dimensions of sustainability, and will in turn demand answers to these issues in built facilities. A large number of R&D projects have focused on the technical advancement and environmental assessment of products and built facilities. It is equally important address the cost/benefit issue, as developers in the world would not want to loose money by investing in built assets. For infrastructure projects, due to its significant cost of development and lengthy delivery time, presenting the full money story of going green is of vital importance. Traditional views of life-cycle costing tend to focus on the pure economics of a construction project. Sustainability concepts are not broadly integrated with the current LCCA in the construction sector. To rectify this problem, this paper reports on the progress to date of developing and extending contemporary LCCA models in the evaluation of road infrastructure sustainability. The suggested new model development is based on sustainability indicators identified through previous research, and incorporating industry verified cost elements of sustainability measures. The on-going project aims to design and a working model for sustainability life-cycle costing analysis for this type of infrastructure projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With increasing pressure to provide environmentally responsible infrastructure products and services, stakeholders are putting significant foci on the early identification of financial viability and outcome of infrastructure projects. Traditionally, there has been an imbalance between sustainable measures and project budget. On one hand, the industry tends to employ the first-cost mentality and approach to developing infrastructure projects. On the other, environmental experts and technology innovators often push for the ultimately green products and systems without much of a concern for cost. This situation is being quickly changed as the industry is under pressure to continue to return profit, while better adapting to current and emerging global issues of sustainability. For the infrastructure sector to contribute to sustainable development, it will need to increase value and efficiency. Thus, there is a great need for tools that will enable decision makers evaluate competing initiatives and identify the most sustainable approaches to procuring infrastructure projects. In order to ensure that these objectives are achieved, the concept of life-cycle costing analysis (LCCA) will play significant roles in the economics of an infrastructure project. Recently, a few research initiatives have applied the LCCA models for road infrastructure that focused on the traditional economics of a project. There is little coverage of life-cycle costing as a method to evaluate the criteria and assess the economic implications of pursuing sustainability in road infrastructure projects. To rectify this problem, this paper reviews the theoretical basis of previous LCCA models before discussing their inability to determinate the sustainability indicators in road infrastructure project. It then introduces an on-going research aimed at developing a new model to integrate the various new cost elements based on the sustainability indicators with the traditional and proven LCCA approach. It is expected that the research will generate a working model for sustainability based life-cycle cost analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Curriculum evaluation, as a field of study, is dynamic. For over the years it has been responsive to the developments in the conceptualization of curriculum and the associated processes of curriculum change. The concept of curriculum is integral to curriculum evaluation and can be defined in terms of what can and shall be taught to whom, when, where, how, and why. Much of the decision making relates to what knowledge is to be selected for inclusion in the curriculum.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The global impact of an ever-increasing population-base combined with dangerously depleted natural resources highlights the urgent need for changes in human lifestyles and land-use patterns. To achieve more equitable and sustainable land use, it is imperative that populations live within the carrying capacity of their natural assets in a manner more accountable to and ethically responsible for the land which sustains them. Our society’s very survival may well depend on worldwide acceptance of the carrying capacity imperative as a principle of personal, political, economic, educational and planning responsibility. This theoretically-focused research identifies, examines and compares a range of methodological approaches to carrying capacity assessment and considers their relevance to future spatial planning. It also addresses existing gaps in current methodologies and suggests avenues for improvement. A set of eleven key criteria are employed to compare various existing carrying capacity assessment models. These criteria include whole-systems analysis, dynamic responses, levels of impact and risk, systemic constraints, applicability to future planning and the consideration of regional and local boundary delineation. This research finds that while some existing methodologies offer significant insights into the assessment of population carrying capacities, a comprehensive model is yet to be developed. However, it is suggested that by combining successful components from various authors, and collecting a range of interconnected data, a practical and workable systems-based model may be achievable in the future.