921 resultados para Asset Management Contracts


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Preservation and enhancement of transportation infrastructure is critical to continuous economic development in Australia. Of particular importance are the road assets infrastructure, due to their high costs of setting up and their social and economic impact on the national economy. Continuous availability of road assets, however, is contingent upon their effective design, condition monitoring, maintenance, and renovation and upgrading. However, in order to achieve this data exchange, integration, and interoperability is required across municipal boundaries. On the other hand, there are no agreed reference frameworks that consistently describe road infrastructure assets. As a consequence, specifications and technical solutions being chosen to manage road assets do not provide adequate detail and quality of information to support asset lifecycle management processes and decisions taken are based on perception not reality. This paper presents a road asset information model, which works as reference framework to, link other kinds of information with asset information; integrate different data suppliers; and provide a foundation for service driven integrated information framework for community infrastructure and asset management.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to summarise a successfully defended doctoral thesis. The main purpose of this paper is to provide a summary of the scope, and main issues raised in the thesis so that readers undertaking studies in the same or connected areas may be aware of current contributions to the topic. The secondary aims are to frame the completed thesis in the context of doctoral-level research in project management as well as offer ideas for further investigation which would serve to extend scientific knowledge on the topic. Design/methodology/approach – Research reported in this paper is based on a quantitative study using inferential statistics aimed at better understanding the actual and potential usage of earned value management (EVM) as applied to external projects under contract. Theories uncovered during the literature review were hypothesized and tested using experiential data collected from 145 EVM practitioners with direct experience on one or more external projects under contract that applied the methodology. Findings – The results of this research suggest that EVM is an effective project management methodology. The principles of EVM were shown to be significant positive predictors of project success on contracted efforts and to be a relatively greater positive predictor of project success when using fixed-price versus cost-plus (CP) type contracts. Moreover, EVM's work-breakdown structure (WBS) utility was shown to positively contribute to the formation of project contracts. The contribution was not significantly different between fixed-price and CP contracted projects, with exceptions in the areas of schedule planning and payment planning. EVM's “S” curve benefited the administration of project contracts. The contribution of the S-curve was not significantly different between fixed-price and CP contracted projects. Furthermore, EVM metrics were shown to also be important contributors to the administration of project contracts. The relative contribution of EVM metrics to projects under fixed-price versus CP contracts was not significantly different, with one exception in the area of evaluating and processing payment requests. Practical implications – These results have important implications for project practitioners, EVM advocates, as well as corporate and governmental policy makers. EVM should be considered for all projects – not only for its positive contribution to project contract development and administration, for its contribution to project success as well, regardless of contract type. Contract type should not be the sole determining factor in the decision whether or not to use EVM. More particularly, the more fixed the contracted project cost, the more the principles of EVM explain the success of the project. The use of EVM mechanics should also be used in all projects regardless of contract type. Payment planning using a WBS should be emphasized in fixed-price contracts using EVM in order to help mitigate performance risk. Schedule planning using a WBS should be emphasized in CP contracts using EVM in order to help mitigate financial risk. Similarly, EVM metrics should be emphasized in fixed-price contracts in evaluating and processing payment requests. Originality/value – This paper provides a summary of cutting-edge research work and a link to the published thesis that researchers can use to help them understand how the research methodology was applied as well as how it can be extended.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to examine the quality of service of a South East Asian country's military facilities management organisation. Design/methodology/approach – An interview survey and questionnaire survey were used to obtain a description and summary of stakeholders’ expectations and the extent to which they were being satisfied by the services provided. Findings – The method provides a useful means of identifying and prioritising varying expectations between stakeholder groups and of indicating any mismatch in expectations in the management of military facilities. Social implications – The development and use of a method to test and improve the effectiveness and efficiency of the management of military facilities helps in providing better value for money. Originality/value – In addition to re-affirming Parasuraman's overall dimensions of service expectation, the empirical summary of the stakeholders’ expectations obtained in this way is of practical value for the service provider in developing a strategy for expectation management. For the case studied, it is also apparent that although the current processes in service delivery are well understood by all involved stakeholders, there is a need for further improvement with regards to their expectation levels. It is also one of the very few reported studies on the management of military facilities.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Optimal Asset Maintenance decisions are imperative for efficient asset management. Decision Support Systems are often used to help asset managers make maintenance decisions, but high quality decision support must be based on sound decision-making principles. For long-lived assets, a successful Asset Maintenance decision-making process must effectively handle multiple time scales. For example, high-level strategic plans are normally made for periods of years, while daily operational decisions may need to be made within a space of mere minutes. When making strategic decisions, one usually has the luxury of time to explore alternatives, whereas routine operational decisions must often be made with no time for contemplation. In this paper, we present an innovative, flexible decision-making process model which distinguishes meta-level decision making, i.e., deciding how to make decisions, from the information gathering and analysis steps required to make the decisions themselves. The new model can accommodate various decision types. Three industrial case studies are given to demonstrate its applicability.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The ability to forecast machinery health is vital to reducing maintenance costs, operation downtime and safety hazards. Recent advances in condition monitoring technologies have given rise to a number of prognostic models which attempt to forecast machinery health based on condition data such as vibration measurements. This paper demonstrates how the population characteristics and condition monitoring data (both complete and suspended) of historical items can be integrated for training an intelligent agent to predict asset health multiple steps ahead. The model consists of a feed-forward neural network whose training targets are asset survival probabilities estimated using a variation of the Kaplan–Meier estimator and a degradation-based failure probability density function estimator. The trained network is capable of estimating the future survival probabilities when a series of asset condition readings are inputted. The output survival probabilities collectively form an estimated survival curve. Pump data from a pulp and paper mill were used for model validation and comparison. The results indicate that the proposed model can predict more accurately as well as further ahead than similar models which neglect population characteristics and suspended data. This work presents a compelling concept for longer-range fault prognosis utilising available information more fully and accurately.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Cost implications related to the physical resources such as land and building in organisation is significant. Management entity of government or private sectors has often ignored the importance and the contribution gained from the physical resources towards their organisation. This source is a precious asset that can generate income if properly managed. This paper aims to explore the current trends in space management internationally, both from the government and private sector perspectives. A case study is conducted to study the level of effectiveness of space management in one of the government institutions in Malaysia. The findings from the case study will be compared with the current international trend of space management. The study will enrich the current understanding of space management in government properties, as well as to compare the level of space management effectiveness of government properties in Malaysia with the international trends and proposed suggestions to improve current practices of space management of Malaysian government’s properties. Keywords:

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The natural disasters incident that frequently hit Indonesia are floods, severe droughts, tsunamis, earth-quakes, volcano, eruptions, landslides, windstorm and forest fires. The impact of those natural disasters are significantly severe and affecting the quality of life of the community due to the breakdown of the public as-sets as one source to deliver public services. This paper is aimed to emphasis the importance of natural disaster risk-informed in relation to public asset management in Indonesian Central Government, particularly in asset planning stage where asset decision is made as the gate into the whole public asset management processes. A Case study in the Ministry of Finance Indonesia as the central government public asset manager and in 5 (five) line ministries/governmental agencies as public asset users was used as the approach to achieved the research objective. The case study devoured three data collection techniques i.e. interviews, observations and document archival which will be analysed by a content analysis approach. The result of the study indicates that Indonesian geographical position exposing many of public infra-structure assets as a high vulnerability to natural disasters. Information on natural-disaster trends and predictions to identify and measure the risks are available, however, such information are not utilise and integrated to the process of public infrastructure asset planning as the gate to the whole public asset management processes. Therefore, in order to accommodate and incorporate this natural disaster risk-information into public asset management processes, particularly in public asset planning, a public asset performance measurements framework should be adopted and applied in the process as one sources in making decision for infrastructure asset planning. Findings from this study provide useful input for the Ministry of Finance as public asset manager, scholars and private asset management practitioners in Indonesia to establish natural disaster risks awareness in public infrastructure asset management processes.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Climate change is predicted to increase the frequency and severity of extreme weather events which pose significant challenges to the ability of government and other relief agencies to plan for, cope with and respond to disasters. Consequently, it is important that communities in climate sensitive and potential disaster prone areas strengthen their resilience to natural disasters in order to expeditiously recover from potential disruptions and damage caused by disasters. Building self reliance and, particularly in the immediate aftermath of a disaster, can facilitate short-term and long-term community recovery. To build stronger and more resilient communities, it is essential to have a better understanding of their current resilience capabilities by assessing areas of strength, risks and vulnerabilities so that their strengths can be enhanced and the risks and vulnerability can be appropriately addressed and mitigated through capacity building programs. While a number of conceptual frameworks currently exist to assess the resilience level of communities to disasters, they have tended to differ on their emphasis, scope and definition of what constitutes community resilience and how community resilience can be most effectively and accurately assessed. These limitations are attributed to the common approach of viewing community resilience through a mono-disciplinary lens. To overcome this, this paper proposes an integrated conceptual framework that takes into account the complex interplay of environmental, social, governance, infrastructure and economic attributes associated with community resilience. The framework can be operationalised using a range of resilience indicators to suit the nature of a disaster and the specific characteristics of a study region.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Climate change is expected to increase earth’s temperatures and consequently result in more frequent extreme weather events such as cyclones, storms, droughts and floods and rising global sea levels. This phenomenon will affect all assets. This paper discusses the impact of climate change and its consequences on public buildings. Public building management encompasses the building life cycle from planning, procurement, operation, repair and maintenance and building disposal. This paper recommends climate change adaptation strategies to be integrated into public building management. The roles and responsibilities of asset managers and users are discussed within the framework of planning and implementation of public building management and the integration of climate change adaptation strategies. A key point is that climate change can induce premature obsolescence of public buildings and services, which will increase the maintenance and refurbishment costs. This in turn will affect the life cycle cost of the building. Furthermore, a business continuity plan is essential for public building management in the context of disasters. The paper also highlights the significant role that the occupants of public buildings can play in the development and implementation of climate change adaptation strategies.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

It is only in recent years that the critical role that spatial data can play in disaster management and strengthening community resilience has been recognised. The recognition of this importance is singularly evident from the fact that in Australia spatial data is considered as soft infrastructure. In the aftermath of every disaster this importance is being increasingly strengthened with state agencies paying greater attention to ensuring the availability of accurate spatial data based on the lessons learnt. For example, the major flooding in Queensland during the summer of 2011 resulted in a comprehensive review of responsibilities and accountability for the provision of spatial information during such natural disasters. A high level commission of enquiry completed a comprehensive investigation of the 2011 Brisbane flood inundation event and made specific recommendations concerning the collection of and accessibility to spatial information for disaster management and for strengthening community resilience during and after a natural disaster. The lessons learnt and processes implemented were subsequently tested by natural disasters during subsequent years. This paper provides an overview of the practical implementation of the recommendations of the commission of enquiry. It focuses particularly on the measures adopted by the state agencies with the primary role for managing spatial data and the evolution of this role in Queensland State, Australia. The paper concludes with a review of the development of the role and the increasing importance of spatial data as an infrastructure for disaster planning and management which promotes the strengthening of community resilience.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Research and practice has observed a shift toward service-oriented approaches that depend on input from users and community as co-producers of services. Yet, in delivering public infrastructure the focus is still on assets rather than services. The contribution of external stakeholders in the co-production of public services is still limited. Using the Policy Delphi with a panel of experts, we found that although practitioners understand the need for asset management to follow the service approach, guidelines and policies still lack that service-centric perspective. Findings revealed a range of obstacles to effective service delivery, related to the sub-optimal involvement of stakeholders’, asymmetric levels of power, the lack of accountability, transparency and availability of government, and the lack of genuine consultations between government and stakeholder groups. The paper concludes by offering directions and strategies for asset managers and policymakers to support and reconnect disengaged government-citizen relations for optimal service delivery outcomes in asset management.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The E&P sector can learn much about asset maintenance from the space and satellite industry. Practitioners from both the upstream oil and gas industry and the space and satellite sector have repeatedly noted several striking similarities between the two industries over the years, which have in turn resulted in many direct comparisons in the media and industry press. The similarities between the two industries have even resulted in a modest amount of cross-pollinating between the respective supply chains. Because the operating conditions of both industries are so extreme, some oil and gas equipment vendors have occasionally sourced motors and other parts from aerospace contractors. Also, satellites are now being used to assess oil fires, detect subsidence in oil fields, measure oil spills, collect and transmit operational data from oil and gas fields, and monitor the movement of icebergs that might potentially collide with offshore oil and gas installations.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Maintenance decisions for large-scale asset systems are often beyond an asset manager's capacity to handle. The presence of a number of possibly conflicting decision criteria, the large number of possible maintenance policies, and the reality of budget constraints often produce complex problems, where the underlying trade-offs are not apparent to the asset manager. This paper presents the decision support tool "JOB" (Justification and Optimisation of Budgets), which has been designed to help asset managers of large systems assess, select, interpret and optimise the effects of their maintenance policies in the presence of limited budgets. This decision support capability is realized through an efficient, scalable backtracking- based algorithm for the optimisation of maintenance policies, while enabling the user to view a number of solutions near this optimum and explore tradeoffs with other decision criteria. To assist the asset manager in selecting between various policies, JOB also provides the capability of Multiple Criteria Decision Making. In this paper, the JOB tool is presented and its applicability for the maintenance of a complex power plant system.