816 resultados para Will to Power


Relevância:

90.00% 90.00%

Publicador:

Resumo:

To ensure the small-signal stability of a power system, power system stabilizers (PSSs) are extensively applied for damping low frequency power oscillations through modulating the excitation supplied to synchronous machines, and increasing interest has been focused on developing different PSS schemes to tackle the threat of damping oscillations to power system stability. This paper examines four different PSS models and investigates their performances on damping power system dynamics using both small-signal eigenvalue analysis and large-signal dynamic simulations. The four kinds of PSSs examined include the Conventional PSS (CPSS), Single Neuron based PSS (SNPSS), Adaptive PSS (APSS) and Multi-band PSS (MBPSS). A steep descent parameter optimization algorithm is employed to seek the optimal PSS design parameters. To evaluate the effects of these PSSs on improving power system dynamic behaviors, case studies are carried out on an 8-unit 24-bus power system through both small-signal eigenvalue analysis and large-signal time-domain simulations.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Digital tablets have been identified as a tool for enabling blended learning and supporting online teaching and learning. A small scale trial was undertaken to assess the effectiveness of this technology when applied to power engineering education. Critical findings and experiences gained from this trial, including potential benefits, presentation techniques and the resulting student feedback are presented in this paper.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The trust and credibility gap between institutional regulators and the public is based on fundamental social and cultural differences related to power and authority. It is also associated with the 'distance' of a bureaucracies from those whom they serve. The nature of public concern about risk may be investigated by considering specific cognitive decision making 'rules' such as 'familiarity' of a hazard or 'voluntariness' of exposure. A more complete appreciation of the 'how' and 'why' of public response to danger from industrial hazards can be gained by appreciating these 'rules' within the broader context of mis-communication between 'elite' regulators and a highly diverse public. If the results of risk assessments are expressed in technical terms alone, it is unlikely that any real communication will occur. Further, if issues related to the 'remote' nature of much institutional decision making are not addressed, closure of the 'gap' may be difficult to bring about.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A comparison of relay power minimisation subject to received signal-to-noise ratio (SNR) at the receiver and SNR maximisation subject to the total transmitted power of relays for a typical wireless network with distributed beamforming is presented. It is desirable to maximise receiver quality-of-service (QoS) and also to minimise the cost of transmission in terms of power. Hence, these two optimisation problems are very common and have been addressed separately in the literature. It is shown that SNR maximisation subject to power constraint and power minimisation subject to SNR constraint yield the same results for a typical wireless network. It proves that either one of the optimisation approaches is sufficient.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Double-pulse tests are commonly used as a method for assessing the switching performance of power semiconductor switches in a clamped inductive switching application. Data generated from these tests are typically in the form of sampled waveform data captured using an oscilloscope. In cases where it is of interest to explore a multi-dimensional parameter space and corresponding result space it is necessary to reduce the data into key performance metrics via feature extraction. This paper presents techniques for the extraction of switching performance metrics from sampled double-pulse waveform data. The reported techniques are applied to experimental data from characterisation of a cascode gate drive circuit applied to power MOSFETs.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

As fossil fuel prices increase and environmental concerns gain prominence, the development of alternative fuels from biomass has become more important. Biodiesel produced from microalgae is becoming an attractive alternative to share the role of petroleum. Currently it appears that the production of microalgal biodiesel is not economically viable in current environment because it costs more than conventional fuels. Therefore, a new concept is introduced in this article as an option to reduce the total production cost of microalgal biodiesel. The integration of biodiesel production system with methane production via anaerobic digestion is proved in improving the economics and sustainability of overall biodiesel stages. Anaerobic digestion of microalgae produces methane and further be converted to generate electricity. The generated electricity can surrogate the consumption of energy that require in microalgal cultivation, dewatering, extraction and transesterification process. From theoretical calculations, the electricity generated from methane is able to power all of the biodiesel production stages and will substantially reduce the cost of biodiesel production (33% reduction). The carbon emissions of biodiesel production systems are also reduced by approximately 75% when utilizing biogas electricity compared to when the electricity is otherwise purchased from the Victorian grid. The overall findings from this study indicate that the approach of digesting microalgal waste to produce biogas will make the production of biodiesel from algae more viable by reducing the overall cost of production per unit of biodiesel and hence enable biodiesel to be more competitive with existing fuels.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This book focuses on how evolutionary computing techniques benefit engineering research and development tasks by converting practical problems of growing complexities into simple formulations, thus largely reducing development efforts. This book begins with an overview of the optimization theory and modern evolutionary computing techniques, and goes on to cover specific applications of evolutionary computing to power system optimization and control problems.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Disconnector switch operation in GIS generates VFT voltages in the system. It is important, for insulation co-ordination purposes, to obtain accurate VFT V-t data for typical gap geometries found in GIS. This paper presents experimentally obtained VFT V-t data for a 180/1 lOmm co-axial gap. The VFT has a time to first peak of 35 ns and a oscillation frequency of 13,6 MHz. Due to the location of the voltage divider in a compartment adjacent to the gap, a correction factor of 1.1 is used to relate the measured breakdown voltage to that in the gap. Positive polarity VFT V-t data is presented for 1, 2, 3 and 4 bar absolute and negative polarity VFT data for 3 and 4 bar absolute. Two methods of generating the VFT's are used. The first is to power up the test transformer at power frequency. The second is to generate a switching impulse by discharging a capacitor into the primary of the test transformer.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This study analyses British military planning and actions during the Suez Crisis in 1956. It seeks to find military reasons for the change of concepts during the planning and compares these reasons with the tactical doctrines of the time. The thesis takes extensive advantage of military documents preserved in the National Archives, London. In order to expand the understanding of the exchange of views during the planning process, the private papers of high ranking military officials have also been consulted. French military documents preserved in the Service Historique de la Defence, Paris, have provided an important point of comparison. The Suez Crisis caught the British armed forces in the middle of a transition phase. The main objective of the armed forces was to establish a credible deterrence against the Soviet Union. However, due to overseas commitments the Middle East playing a paramount role because of its economic importance the armed forces were compelled to also prepare for Limited War and the Cold War. The armed forces were not fully prepared to meet this demand. The Middle Eastern garrison was being re-organised after the withdrawal from the Canal Base and the concept for a strategic reserve was unimplemented. The tactical doctrines of the time were based on experiences from the Second World War. As a result, the British view of amphibious operations and the subsequent campaigns emphasised careful planning, mastery of the sea and the air, sufficient superiority in numbers and firepower, centralised command and extensive administrative preparations. The British military had realized that Nasser could nationalise the Suez Canal and prepared an outline plan to meet this contingency. Although the plan was nothing more than a concept, it was accepted as a basis for further planning when the Canal was nationalised at the end of July. This plan was short-lived. The nominated Task Force Commanders shifted the landing site from Port Said to Alexandria because it enabled faster expansion of the bridgehead. In addition, further operations towards Cairo the hub of Nasser s power would be easier to conduct. The operational concept can be described as being traditional and was in accordance with the amphibious warfare doctrine. This plan was completely changed at the beginning of September. Apparently, General Charles Keightley, the Commander-in-Chief, and the Chairman of the Chiefs of Staff Committee developed the idea of prolonged aerial operations. The essence of the concept was to break the Egyptian will to resist by attacking the oil facilities, the transportation system and the armed forces. This victory through air concept would be supported by carefully planned psychological operations. This concept was in accordance with the Royal Air Force doctrine, which promoted a bomber offensive against selected target categories. General Keightley s plan was accepted despite suspicions at every planning level. The Joint Planning Staff and the Task Force Commanders opposed the concept from the beginning to the end because of its unpredictability. There was no information that suggested the bombing would persuade the Egyptians to submit. This problem was worsened by the fact that British intelligence was unable to provide reliable strategic information. The Task Force Commanders, who were responsible for the tactical plans, were not able to change Keightley s mind, but the concept was expanded to include a traditional amphibious assault on Port Said due to their resistance. The bombing campaign was never tested as the Royal Air Force was denied authorisation to destroy the transportation and oil targets. The Chiefs of Staff and General Keightley were too slow to realise that the execution of the plan depended on the determination of the Prime Minister. However, poor health, a lack of American and domestic support and the indecisiveness of the military had ruined Eden s resolve. In the end, a very traditional amphibious assault, which was bound to succeed at the tactical level but fail at the strategic level, was launched against Port Said.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Introduction and Objectives Joint moments and joint powers during gait are widely used to determine the effects of rehabilitation programs as well as prosthetic fitting. Following the definition of power (dot product of joint moment and joint angular velocity) it has been previously proposed to analyse the 3D angle between both vectors, αMw. Basically, joint power is maximised when both vectors are parallel and cancelled when both vectors are orthogonal. In other words, αMw < 60° reveals a propulsion configuration (more than 50% of the moment contribute to positive power) while αMw > 120° reveals a resistance configuration (more than 50% of the moment contribute to negative power). A stabilisation configuration (less than 50% of the moment contribute to power) corresponds to 60° < αMw < 120°. Previous studies demonstrated that hip joints of able-bodied adults (AB) are mainly in a stabilisation configuration (αMw about 90°) during the stance phase of gait. [1, 2] Individuals with transfemoral amputation (TFA) need to maximise joint power at the hip while controlling the prosthetic knee during stance. Therefore, we tested the hypothesis that TFAs should adopt a strategy that is different from a continuous stabilisation. The objective of this study was to compute joint power and αMw for TFA and to compare them with AB. Methods Three trials of walking at self-selected speed were analysed for 8 TFAs (7 males and 1 female, 46±10 years old, 1.78±0.08 m 82±13 kg) and 8 ABs (males, 25±3 years old, 1.75±0.04, m 67±6 kg). The joint moments are computed from a motion analysis system (Qualisys, Goteborg, Sweden) and a multi-axial transducer (JR3, Woodland, USA) mounted above the prosthetic knee for TFAs and from a motion analysis system (Motion Analysis, Santa Rosa, USA) and force plates (Bertec, Columbus, USA) for ABs. The TFAs were fitted with an OPRA (Integrum, AB, Gothengurg, Sweden) osseointegrated implant system and their prosthetic designs include pneumatic, hydraulic and microprocessor knees. Previous studies showed that the inverse dynamics computed from the multi-axial transducer is the proper method considering the absorption at the foot and resistance at the knee. Results The peak of positive power at loading response (H1) was earlier and lower for TFA compared to AB. Although the joint power is lower, the 3D angle between joint moment and joint angular velocity, αMw, reveals an obvious propulsion configuration (mean αMw about 20°) for TFA compared to a stabilisation configuration (mean αMw about 70°) for AB. The peaks of negative power at midstance (H2) and of positive power at preswing / initial swing (H3) occurred later, lower and longer for TFA compared to AB. Again, the joint powers are lower for TFA but, in this case, αMw is almost comparable (with a time lag), demonstrating a stabilisation (almost a resistance for TFA, mean αMw about 120°) and a propulsion configuration, respectively. The swing phase is not analysed in the present study. Conclusion The analysis of hip joint power may indicate that TFAs demonstrated less propulsion and resistance than ABs during the stance phase of gait. This is true from a quantitative point of view. On the contrary, the 3D angle between joint moment and joint angular velocity, αMw, reveals that TFAs have a remarkable propulsion strategy at loading response and almost a resistance strategy at midstance while ABs adopted a stabilisation strategy. The propulsion configuration, with αMw close to 0°, seems to aim at maximising the positive joint power. The configuration close to resistance, with αMw far from 180°, might aim at unlocking the prosthetic knee before swing while minimising the negative power. This analysis of both joint power and 3D angle between the joint moment and the joint angular velocity provides complementary insights into the gait strategies of TFA that can be used to support evidence-based rehabilitation and fitting of prosthetic components.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In this paper a modified Heffron-Phillip's (K-constant) model is derived for the design of power system stabilizers. A knowledge of external system parameters, such as equivalent infinite bus voltage and external impedances or their equivalent estimated values is required for designing a conventional power system stabilizer. In the proposed method, information available at the secondary bus of the step-up transformer is used to set up a modified Heffron-Phillip's (ModHP) model. The PSS design based on this model utilizes signals available within the generating station. The efficacy of the proposed design technique and the performance of the stabilizer has been evaluated over a range of operating and system conditions. The simulation results have shown that the performance of the proposed stabilizer is comparable to that could be obtained by conventional design but without the need for the estimation and computation of external system parameters. The proposed design is thus well suited for practical applications to power system stabilization, including possibly the multi-machine applications where accurate system information is not readily available.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This memoir was written for educational purposes, particularly for its use in schools (7th and 8th grade), which is reflected in the style it was written. It also includes a map showing his emigration route from Vienna to Shanghai, a photograph, and many resources for teachers. It was originally published in the State of New Jersey Holocaust/Genocide Curriculum in 2002. The memoir starts with the family’s departure from Vienna, on January 23, 1939. It later on describes daily life in Shanghai and the later Jewish ghetto. The memoir ends with the Seiden family’s departure to Israel on January 1, 1949.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Inadvertent failure of power transformers has serious consequences on the power system reliability, economics and the revenue accrual. Insulation is the weakest link in the power transformer prompting periodic inspection of the status of insulation at different points in time. A close Monitoring of the electrical, chemical and such other properties on insulation as are sensitive to the amount of time-dependent degradation becomes mandatory to judge the status of the equipment. Data-driven Diagnostic Testing and Condition Monitoring (DTCM) specific to power transformer is the aspect in focus. Authors develop a Monte Carlo approach for augmenting the rather scanty experimental data normally acquired using Proto-types of power transformers. Also described is a validation procedure for estimating the accuracy of the Model so developed.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Electricity generation is vital in developed countries to power the many mechanical and electrical devices that people require. Unfortunately electricity generation is costly. Though electricity can be generated it cannot be stored efficiently. Electricity generation is also difficult to manage because exact demand is unknown from one instant to the next. A number of services are required to manage fluctuations in electricity demand, and to protect the system when frequency falls too low. A current approach is called automatic under frequency load shedding (AUFLS). This article proposes new methods for optimising AUFLS in New Zealand’s power system. The core ideas were developed during the 2015 Maths and Industry Study Group (MISG) in Brisbane, Australia. The problem has been motivated by Transpower Limited, a company that manages New Zealand’s power system and transports bulk electricity from where it is generated to where it is needed. The approaches developed in this article can be used in electrical power systems anywhere in the world.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In this paper we employ the phenomenon of bending deformation induced transport of cations via the polymer chains in the thickness direction of an electro-active polymer (EAP)-metal composite thin film for mechanical energy harvesting. While EAPs have been applied in the past in actuators and artificial muscles, promising applications of such materials in hydrodynamic and vibratory energy harvesting are reported in this paper. For this, functionalization of EAPs with metal electrodes is the key factor in improving the energy harvesting efficiency. Unlike Pt-based electrodes, Ag-based electrodes have been deposited on an EAP membrane made of Nafion. The developed ionic metal polymer composite (IPMC) membrane is subjected to a dynamic bending load, hydrodynamically, and evaluated for the voltage generated against an external electrical load. An increase of a few orders of magnitude has been observed in the harvested energy density and power density in air, deionized water and in electrolyte solutions with varying concentrations of sodium chloride (NaCl) as compared to Pt-based IPMC performances reported in the published literature. This will have potential applications in hydrodynamic and residual environmental energy harvesting to power sensors and actuators based on micro-andn nano-electro-mechanical systems (MEMS and NEMS) for biomedical,maerospace and oceanic applications.