890 resultados para project cost engineering


Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper analyzes the possibilities of integrating cost information and engineering design. Special emphasis is put on finding the potential of using the activity-based costing (ABC) method. Today, the problem of cost estimation in engineering design is that there are two separate extremes of knowledge. On the one extreme, the engineers model the technical parametres behindcosts in great detail but do not get appropriate cost information to their elegant models. On the other extreme, the accounting professionals are stuck with traditional cost accounting methods driven by the procedures and cycles of financial accounting. Therefore, in many cases, the cost information needs of various decision making groups, for example design engineers, are not served satisfactorily. This paper studies if the activity-based costing (ABC) method could offer a compromise between the two extremes. Recognizing activities and activity chains as well as activity and cost drivers could be specially beneficial for design engineers. Also, recognizing the accurate and reliable product costs of existing products helps when doing variant design. However, ABC is not at its best if the cost system becomes too complicated. This is why a comprehensive ABC-cost information system with detailed cost information for the use of design engineers should be examined critically. ABC is at its best when considering such issues as which activities drive costs, the cost of product complexity, allocating indirect costs on the products, the relationships between processes and costs, and the cost of excess capacity.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The purpose of the study is to find factors affecting projects' profitability in project business. The issue is approached from customer profitability and project management point of view. The study has been made for a big Finnish company acting in a global market place. The research method is quantitative. Research hypotheses are based on the literature. The used database is originated from the company's ERP- (enterprise resource planning) and project financial follow-up —system. The findings of the study supported the hypotheses weakly. Obviously profitability fluctuated depending on a customer and a project manager. The reasons could not be justified with the variables used in the research.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This master’s thesis was done for Andritz Inc. Atlanta Georgia. The purpose of the thesis was to develop a new trolley for a small portal log yard crane. In the beginning of the thesis the basic principles of the systematic design processes have been described, along which the design work of the trolley has proceeded. The second literature part consists of the design and dimensioning of the welded steel structures under fatigue loading. The design work of the trolley consists of the engineering and the selection of the mechanical components and the design of the load carrying structure for the trolley. The realization of the steel structure of the trolley is based on the fatigue and static dimensioning. The fatigue dimensioning is grounded in the life expectations estimated for the trolley and the static dimensioning is based on the CMAA guidelines. The computer aided element method was utilized in the design of the steel structure. The effective notch method and the hot spot method were used in the fatigue calculations. The trolley structure was carried out by using the sheet metal parts in order to manufacture the structure as effective and low cost way as possible. The corner stone of the dimensioning of the trolley structure was the utilization of the open profiles made of welded or cold formed sheet metals, which provide better weldability, weld inspection, access for repairs and corrosion protection. As a last part of the thesis a new trolley traveling system was developed. The distribution of the wheel loads of the trolley bogies on the main girder was also studied, which led to an innovative suspension arrangement between the trolley leg and the bogie. The new bogie solution increases the service life of the main girder of the crane and improves the stability of the bogies. The outcome of the thesis is an excellent trolley structure from the weight and the service life point of view.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The purpose of this study was to investigate the nature of co-operation between a project owner and an outside engineering consultant in combined heat and power plant implementation projects. Moreover, as another focal subject of the study was to familiarize the purchasing behavior of the energy producer and how an outside engineering consultant participated into different stages of the purchasing process. The study was carried out as a multiple case study including altogether six Finnish power plant implementation projects that had been taken into commercial use during 1995 – 2015. By adjusting the findings of empirical interview data and comparing those to the theoretical framework concerning, among others, Finnish energy production, engineering consulting businesses, delivery methods of construction project and finally the purchasing process, it can be concluded that especially in the power plant implementation projects in the past have a great influence to decisions made during the project. The role of the main engineering consultant is to act as an assistant, who helps to achieve the project goals successfully rather than an advisor who only knows how the project should be conducted. At least in these five project cases this was the case, meaning that the final decision power always remaining with project owner.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The aim of this study is to develop a suitable project control procedure for a target company that can be used in engineering, procurement, and construction or con-struction management contracts. This procedure contains suitable project control software and a model for the use of the software in practice. This study is divided into two main sections. Theoretical part deals with project management, focusing on cost and time dimensions in projects. Empirical part deals with the development of the project control procedure for the target compa-ny. This development takes place in two parts. In the first part, semi-structured interviews are used to find out the company’s employees’ demands and desires for the project control software which will then be used in the developed procedure. These demands and desires are compared to available software in the market and the most suitable one will be chosen. Interview results show that important factors are cost tracking, integration with other software, English language availability, references, helpdesk, and no need for regular updates. The most suitable one is CMPro5 cost control software. The chosen software is used in a pilot project, where its functions and use are analyzed. Project control procedure which will be used in the future is developed based on these procedures. The five steps in developed procedure include employment of a cost engineer, whose task is to maintain the procedure in the target company.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Objective: to describe and evaluate the acceptance of a low-cost chest tube insertion porcine model in a medical education project in the southwest of Paraná, Brazil. Methods: we developed a low-cost and low technology porcine model for teaching chest tube insertion and used it in a teaching project. Medical trainees - students and residents - received theoretical instructions about the procedure and performed thoracic drainage in this porcine model. After performing the procedure, the participants filled a feedback questionnaire about the proposed experimental model. This study presents the model and analyzes the questionnaire responses. Results: seventy-nine medical trainees used and evaluated the model. The anatomical correlation between the porcine model and human anatomy was considered high and averaged 8.1±1.0 among trainees. All study participants approved the low-cost porcine model for chest tube insertion. Conclusion: the presented low-cost porcine model for chest tube insertion training was feasible and had good acceptability among trainees. This model has potential use as a teaching tool in medical education.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This thesis investigated the contemporary phenomenon of detail engineering outsourcing. The case organization had pursued a new outsourcing approach with a trusted partner. The goal of this empirical study was to examine the impact of the consequential partnership outsourcing arrangement. Particularly, the beneficence of the arrangement was evaluated based on the underlying organizational routine and the long-term economic implications of its performance outcome. The case study was needed, as the unit will likely have to rely on such distance outsourcing arrangements more and more in the future, and understanding on the impact of such operations is needed. The main findings revealed that the new outsourcing arrangement is not currently a very attractive strategic option for organizing production. The benefits which stem from the emerged, unique engineering project routine are not significant enough to make the arrangement an advantageous one, especially since increasing partnering costs are being met. This conclusion was drawn via the extended transaction cost view. Benchmarking was done in reliance to an old arrangement from which the new pursuit was a departure from. The case study then enlightened the engineering unit on the impact of its strategic maneuver by combining the routines-theory framework with contemporary methods of governance structure evaluation. Through this, it was shown that greater efforts are needed to make the new outsourcing approach a more beneficial one. However, the studied arrangement was seen to inhold potential for better results. The findings can be used to capitalize on this.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This report summarizes the results of the survey HAVERI – Supply network risks in business. The survey was conducted in Finland during the spring and summer of year 2013. The survey is part of a large two-year research project started in June 2012 in Finland (on-going 06/2012–07/2014). The project is launched and financed by TEKES, the Finnish Funding Agency for Technology and Innovation, and executed together with the researchers from Lappeenranta University of Technology and Tampere University of Technology. The overall goal of this on-going research project is to find out the decision-making practices in the project-oriented companies in their purchasing decisions especially in the mechanical engineering and construction industries in Finland. The objective of the survey was to gain cross-sectional data concerning the challenges, risks and cost factors in Finnish project business companies. The results show that Finnish companies rely on their experience and supplier references in their risk management. In general, the understanding of the total cost structure varies among the industries and companies. The main cost factor in risk management was costs before the actual purchase decision. Overall, it seems that the monetary value of the whole project and capability of purchasing personnel are the main influencing factors on risk management activity in project purchasing.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The rapid growth of the optical communication branches and the enormous demand for more bandwidth require novel networks such as dense wavelength division multiplexing (DWDM). These networks enable higher bitrate transmission using the existing optical fibers. Micromechanically tunable optical microcavity devices like VCSELs, Fabry-Pérot filters and photodetectors are core components of these novel DWDM systems. Several air-gap based tunable devices were successfully implemented in the last years. Even though these concepts are very promising, two main disadvantages are still remaining. On the one hand, the high fabrication and integration cost and on the other hand the undesired adverse buckling of the suspended membranes. This thesis addresses these two problems and consists of two main parts: • PECVD dielectric material investigation and stress control resulting in membranes shape engineering. • Implementation and characterization of novel tunable optical devices with tailored shapes of the suspended membranes. For this purposes, low-cost PECVD technology is investigated and developed in detail. The macro- and microstress of silicon nitride and silicon dioxide are controlled over a wide range. Furthermore, the effect of stress on the optical and mechanical properties of the suspended membranes and on the microcavities is evaluated. Various membrane shapes (concave, convex and planar) with several radii of curvature are fabricated. Using this resonator shape engineering, microcavity devices such as non tunable and tunable Fabry-Pérot filters, VCSELs and PIN photodetectors are succesfully implemented. The fabricated Fabry-Pérot filters cover a spectral range of over 200nm and show resonance linewidths down to 1.5nm. By varying the stress distribution across the vertical direction within a DBR, the shape and the radius of curvature of the top membrane are explicitely tailored. By adjusting the incoming light beam waist to the curvature, the fundamental resonant mode is supported and the higher order ones are suppressed. For instance, a tunable VCSEL with 26 nm tuning range, 400µW maximal output power, 47nm free spectral range and over 57dB side mode suppresion ratio (SMSR) is demonstrated. Other technologies, such as introducing light emitting organic materials in microcavities are also investigated.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Software Engineering Team project introductory lecture and project start up for 2014-2015. it covers team working, infrastructure tools, and an outline of the agile methods, practices and principles that will be used.