945 resultados para Project implementation


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Travail dirigé présenté à la Faculté des études supérieures et postdoctorales en vue de l’obtention du grade de Maître ès sciences (M. SC.) en Criminologie, option Sécurité Intérieure

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Travail dirigé présenté à la Faculté des études supérieures et postdoctorales en vue de l’obtention du grade de Maître ès sciences (M. SC.) en Criminologie, option Sécurité Intérieure

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The goal of this EPS@ISEP project proposed in the Spring of 2014 was to develop a flapping wing flying robot. The project was embraced by a multinational team composed of four students from different countries and fields of study. The team designed and implemented a robot inspired by a biplane design, constructed from lightweight materials and battery powered. The prototype, called MyBird, was built with a 250 € budget, reuse existing materials as well as low cost solutions. Although the team's initial idea was to build a light radio controlled robot, time limitations along with setbacks involving the required electrical components led to a light but not radio controlled prototype. The team, from the experience gathered, made a number of future improvement suggestions, namely, the addition of radio control and a camera and the adoption of articulated monoplane design instead of the current biplane design for the wings.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper presents the development of a fish-like robot called Bro-Fish. Bro-Fish aims to be an educational toy dedicated to teaching mechanics, programming and the physics of floating objects to youngsters. The underlying intention is to awaken the interest of children for technology, especially biomimetic (biologically inspired) approaches, in order to promote sustainability and raise the level of ecological awareness. The main focus of this project was to create a robot with carangiform locomotion and controllable swimming, providing the opportunity to customize parts and experiment with the physics of floating objects. Therefore, the locomotion principles of fishes and mechanisms developed in related projects were analysed. Inspired by this background knowledge, a prototype was designed and implemented. The main achievement is the new tail mechanism that propels the robot. The tail resembles the undulation motion of fish bodies and is actuated in an innovative way, triggered by an elegant movement of a rotating helicoidal. First experimental tests revealed the potential of the proposed methodology to effectively generate forward propulsion.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

RESUMO: Antecendentes: Uma avaliação dos serviços de abuso de substâncias em Barbados identificou a necessidade de programas e serviços que são projetados especificamente para crianças e adolescentes. Objetivo: Realizar programa com base em evidências para reduzir a incidência de abuso de drogas entre crianças e adolescentes por meio do fortalecimento da unidade familiar através de parentalidade positiva, de maior funcionamento familiar e de resistência dos jovens. Método: Dois projetos-piloto foram realizadas com base no programa "Fortalecer as Famílias para Pais e Jovens de 12 a 16 anos (SFPY). O programa de nove semanas foi empregado como uma intervenção para criar laços familiares mais fortes, aumentar a resistência dos jovens e reduzir o abuso de drogas entre crianças e adolescentes de idades de 11 a 16 anos. A decisão foi tomada para incluir participantes de 11 anos desde que as crianças possam estar no primeiro ano da escola secundária nessa idade. IMPLEMENTATION OF SUBSTANCE ABUSE PILOT PROJECT FOR CHILDREN AND ADOLESCENTS 5 Resultados: Quinze famílias participaram em dois projetos-piloto e a avaliação final mostrou que os jovens após o programa, geralmente tornaram-se mais positivos sobre o seu lugar na unidade familiar e sentiram que sua participação no programa foi benéfica. Os pais, da mesma forma, relataram que eles conquistaram, com o programa uma relação mais positiva, uma melhor compreensão das necessidades, e consciência das mudanças de desenvolvimento de seus jovens. Desta forma, considera-se que o programa atingiu o resultado desejado de criar unidades familiares mais fortes. Conclusão: O Projeto Piloto “SFPY” foi bem sucedido em fazer pais e jovens mais conscientes de suas necessidades individuais e de responsabilidades dentro da unidade familiar. Como resultado, o relacionamentos das respectivas famílias melhorou. Estudos baseados em evidências têm demonstrado que um relação familiar mais forte diminui a incidência de uso e abuso de drogas na população adolescente, aumentando os fatores de proteção e diminuindo os fatores de risco. A implementação do programa, que foi desenvolvido e testado no ambiente norte-americano, demonstrou que era transferível para a sociedade de Barbados. No entanto, seu impacto total só pode ser determinado através de um estudo comparativo envolvendo um grupo de controle e / ou uma intervenção alternativa ao abuso de substâncias. Portanto, é recomendável que um estudo comparativo da intervenção SFPY deve envolver uma amostra representativa de adolescentes que estão em estágio de desenvolvimento anterior mais cedo. Evidências já demonstram que o programa é mais eficaz, com impacto mais longo sobre os jovens que participam em uma idade maisABSTRACT:Background: An evaluation of substance abuse services in Barbados has identified the need for programmes and services that are specifically designed for children and adolescents. Aim: To conduct an evidence-based programme to reduce the incidence of substance abuse among children and adolescents by strengthening the family unit through positive parenting, enhanced family functioning and youth resilience. Method: Two pilot projects were conducted based on the ‘Strengthening Families for Parents and Youths 12– 16’ (SFPY) programme. The nine-week programme was employed as an intervention to create stronger family connections, increase youth resiliency and reduce drug abuse among children and adolescents between the ages of 11 to 16. The decision was made to include participants from age 11 since children may be in the first year of secondary school at this age. IMPLEMENTATION OF SUBSTANCE ABUSE PILOT PROJECT FOR CHILDREN AND ADOLESCENTS 3 Results: Fifteen families participated in two pilot projects and an evaluation conducted at the conclusion showed that the youth were generally more positive about their perceived place in the family unit and felt that the being in the programme was generally beneficial. The parents similarly reported they had a more positive relationship with their youths and also had a better understanding of their needs, and an awareness of their developmental changes. This affirmed that the programme had achieved its desired outcome to create stronger family units. Conclusion: The SFPY Pilot Project was successful in making parents and youths more aware of their individual needs and responsibilities within the family unit. As a result relationships within their respective families were strengthened. Evidence-based studies have shown that enhanced family functioning decreases the incidence of substance use and abuse in the adolescent population by increasing protective factors and decreasing risk factors. The implementation of the programme, which was developed and tested in the North American environment, demonstrated that it was transferable to the Barbadian society. However, its full impact can only be determined through a comparative study involving a control group and/or an alternative substance abuse intervention. It is therefore recommended that a comparative study of the SFPY intervention should be delivered to a representative sample of adolescents who are at an earlier developmental stage. Evidence has shown that the programme is more effective, with longer impact on youths who participate at a younger age.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Companies from the motorcycles components branch are dealing with a dynamic environment, resulting from the introduction of new products and the increase of market demand. This dynamic environment requires frequent changes in production lines and requires flexibility in the processes, which can cause reductions in the level of quality and productivity. This paper presents a Lean Six Sigma improvement project performed in a production line of the company's machining sector, in order to eliminate losses that cause low productivity, affecting the fulfillment of the production plan and customer satisfaction. The use of Lean methodology following the DMAIC stages allowed analyzing the factors that influence the line productivity loss. The major problems and causes that contribute to a reduction on productivity and that were identified in this study are the lack of standardization in the setup activities and the excessive stoppages for adjustment of the processes that caused an increase of defects. Control charts, Pareto analysis and cause-and-effect diagrams were used to analyze the problem. On the improvement stage, the changes were based on the reconfiguration of the line layout as well as the modernization of the process. Overall, the project justified an investment in new equipment, the defective product units were reduced by 84% and an increase of 29% of line capacity was noticed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Ireland's future economic growth and competitiveness will increasingly depend on the extent to which it can support high value knowledge based industries. Mathematics is essential for disciplines such as science, technology, engineering and finance, but it also promotes the ability to think rationally, analyse and solve problems, and process data clearly and accurately. In a globalised competitive economy it is important that Ireland moves beyond being “average” at mathematics towards the promotion of advanced levels of skills, creativity and innovation. We urgently need to improve attainment levels in mathematics generally and to encourage more students to take Higher Level Mathematics. In addition, mathematics is an essential life skill for citizenship and economic and social participation in an increasingly complex world.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This report describes the continuation of the development of performance measures for the Iowa Department of Transportation (DOT) Offices of Construction. Those offices are responsible for administering transportation construction projects for the Iowa DOT. Researchers worked closely with the Benchmark Steering Team which was formed during Phase I of this project and is composed of representatives of the Offices of Construction. The research team conducted a second survey of Offices of Construction personnel, interviewed numerous members of the Offices and continued to work to improve the eight key processes identified during Phase I of this research. The eight key processes include Inspection of Work, Resolution of Technical Issues, Documentation of Work Progress and Pay Quantities, Employee Training and Development, Continuous Feedback for Improved Contract Documents, Provide Safe Traffic Control, External/Public Communication, and Providing Pre-Letting Information. Three to four measurements were specified for each key process. Many of these measurements required opinion surveys of employees, contractors, and others. During Phase II, researchers concentrated on conducting surveys, interviewing respondents to improve future surveys, and facilitating Benchmark Steering Team monthly meetings. Much effort was placed on using the information collected during the first year's research to improve the effectiveness and efficiency of the Offices of Construction. The results from Process Improvement Teams that studied Traffic Control and Resolution of Technical Issues were used to improve operations.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The purpose of this study was to investigate the nature of co-operation between a project owner and an outside engineering consultant in combined heat and power plant implementation projects. Moreover, as another focal subject of the study was to familiarize the purchasing behavior of the energy producer and how an outside engineering consultant participated into different stages of the purchasing process. The study was carried out as a multiple case study including altogether six Finnish power plant implementation projects that had been taken into commercial use during 1995 – 2015. By adjusting the findings of empirical interview data and comparing those to the theoretical framework concerning, among others, Finnish energy production, engineering consulting businesses, delivery methods of construction project and finally the purchasing process, it can be concluded that especially in the power plant implementation projects in the past have a great influence to decisions made during the project. The role of the main engineering consultant is to act as an assistant, who helps to achieve the project goals successfully rather than an advisor who only knows how the project should be conducted. At least in these five project cases this was the case, meaning that the final decision power always remaining with project owner.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The application of information technology (IT) in customer relationship management (CRM) is growing rapidly as many companies implement CRM systems to support their numerous customer facing activities. However, failure rates of CRM projects remain notably high as they deliver scant solutions and poor user acceptance. As a consequence, it is justified to study previously researched CRM success factors and apply them to CRM system implementation. The aim of this master’s thesis was to get acquainted with relevant academic theories, frameworks and practices concerning CRM and agile development, and use them to generate a modified CRM project strategy to support the successful execution of the case company’s, Process Vision Oy, CRM implementation project. The empirical CRM system implementation project was conducted simultaneously with writing this thesis. Its theoretical findings could be transferred into practice through active participation in the CRM system development and deployment work. The project’s main goal was to produce and take into use a functioning CRM system. The goal was met, since at the time of printing this thesis the first system release was successfully published to its users at Process Vision’s marketing and sales departments. The key success elements in the CRM project were cyclic, iterative system development, customer oriented approach, user inclusion and flexible project management. Implying agile development practices ensured being able to quickly respond to changes arising during the progress of the CRM project. Throughout modelling of the core sales process formed a strong basis, on which the CRM system’s operational and analytical functionalities were built. End users were included in the initial specification of system requirements and they provided feedback on the system’s usage. To conclude, the chosen theoretical CRM roadmaps and agile development practices proved as beneficial in the successful planning and execution of the agile CRM system implementation project at Process Vision.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

According to several surveys and observations, the percentage of successfully conducted IT projects without over-budgeting and delays in time schedule are extremely low. Many projects also are evaluated as failures in terms of delivered functionality. Nuldén (1996) compares IT projects with bad movies; after watching for 2 hours, one still tries to finish it even though one understands that it is a complete waste of time. The argument for that is 'I've already invested too much time to terminate it now'. The same happens with IT projects: sometimes the company continues wasting money on these projects for a long time, even though there are no expected benefits from these projects. Eventually these projects are terminated anyway, but until this moment, the company spends a lot. The situation described above is a consequence of “escalation of commitment” - project continuation even after a manager receives negative feedback of the project’s success probability. According to Keil and Mähring (2010), even though escalation can occur in any type of project, it is more common among complex technological projects, such as IT projects. Escalation of commitment very often results in runaway projects. In order to avoid it, managers use de-escalation strategies, which allow the resources to be used in more effective. These strategies lead to project termination or turning around, which stops the flow of wasted investments. Numbers of researches explore escalation of commitment phenomena based on experiments and business cases. Moreover, during the last decade several frameworks were proposed for de-escalation strategy. However, there is no evidence of successful implementation of the de-escalation of commitment strategy in the literature. In addition, despite that fact that IT project management methodologies are widely used in the companies, none of them cover the topic of escalation of commitment risks. At the same time, there are no researches proposing the way to implement de-escalation of commitment strategy into the existing project management methodology The research is focused on a single case of large ERP implementation project by the consulting company. Hence, the main deliverables of the study include suggestions of improvement in de-escalation methods and techniques in the project and in the company. Moreover, the way to implement these methods into existing project management methodology and into the company general policies is found.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In the market where companies similar in size and resources are competing, it is challenging to have any advantage over others. In order to stay afloat company needs to have capability to perform with fewer resources and yet provide better service. Hence development of efficient processes which can cut costs and improve performance is crucial. As business expands, processes become complicated and large amount of data needs to be managed and available on request. Different tools are used in companies to store and manage data, which facilitates better production and transactions. In the modern business world the most utilized tool for that purpose is ERP - Enterprise Resource Planning system. The focus of this research is to study how competitive advantage can be achieved by implementing proprietary ERP system in the company; ERP system that is in-house created, tailor made to match and align business needs and processes. Market is full of ERP software, but choosing the right one is a big challenge. Identifying the key features that need improvement in processes and data management, choosing the right ERP, implementing it and the follow-up is a long and expensive journey companies undergo. Some companies prefer to invest in a ready-made package bought from vendor and adjust it according to own business needs, while others focus on creating own system with in-house IT capabilities. In this research a case company is used and author tries to identify and analyze why organization in question decided to pursue the development of proprietary ERP system, how it has been implemented and whether it has been successful. Main conclusion and recommendation of this research is for companies to know core capabilities and constraints before choosing and implementing ERP system. Knowledge of factors that affect system change outcome is important, to make the right decisions on strategic level and implement on operational level. Duration of the project in the case company has lasted longer than anticipated. It has been reported that in cases of buying ready product from vendor, projects are delayed and completed over budget as well. In general, in case company implementation of proprietary ERP has been successful both from business performance figures and usability of system by employees. In terms of future research, conducting a study to calculate statistically ROI of both approaches; of buying ready product and creating own ERP will be beneficial.