978 resultados para residential construction costs


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years, there has been a growing interest from the design and construction community to adopt Building Information Models (BIM). BIM provides semantically-rich information models that explicitly represent both 3D geometric information (e.g., component dimensions), along with non-geometric properties (e.g., material properties). While the richness of design information offered by BIM is evident, there are still tremendous challenges in getting construction-specific information out of BIM, limiting the usability of these models for construction. In this paper, we describe our approach for extracting construction-specific design conditions from a BIM model based on user-defined queries. This approach leverages an ontology of features we are developing to formalize the design conditions that affect construction. Our current implementation analyzes the component geometry and topological relationships between components in a BIM model represented using the Industry Foundation Classes (IFC) to identify construction features. We describe the reasoning process implemented to extract these construction features, and provide a critique of the IFC’s to support the querying process. We use examples from two case studies to illustrate the construction features, the querying process, and the challenges involved in deriving construction features from an IFC model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Accelerating a project can be rewarding. The consequences, however, can be troublesome if productivity and quality are sacrificed for the sake of remaining ahead of schedule, such that the actual schedule benefits are often barely worth the effort. The tradeoffs and paths of schedule pressure and its causes and effects are often overlooked when schedule decisions are being made. This paper analyses the effects that schedule pressure has on construction performance, and focuses on tradeoffs in scheduling. A research framework has been developed using a causal diagram to illustrate the cause-and-effect analysis of schedule pressure. An empirical investigation has been performed by using survey data collected from 102 construction practitioners working in 38 construction sites in Singapore. The results of this survey data analysis indicate that advantages of increasing the pace of work—by working under schedule pressure—can be offset by losses in productivity and quality. The negative effects of schedule pressure arise mainly by working out of sequence, generating work defects, cutting corners, and losing the motivation to work. The adverse effects of schedule pressure can be minimized by scheduling construction activities realistically and planning them proactively, motivating workers, and by establishing an effective project coordination and communication mechanism.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Previous research on construction innovation has commonly recognized the importance of the organizational climate and key individuals, often called “champions,” for the success of innovation. However, it rarely focuses on the role of participants at the project level and addresses the dynamics of construction innovation. This paper therefore presents a dynamic innovation model that has been developed using the concept of system dynamics. The model incorporates the influence of several individual and situational factors and highlights two critical elements that drive construction innovations: (1) normative pressure created by project managers through their championing behavior, and (2) instrumental motivation of team members facilitated by a supportive organizational climate. The model is qualified empirically, using the results of a survey of project managers and their project team members working for general contractors in Singapore, by assessing casual relationships for key model variables. Finally, the paper discusses the implications of the model structure for fostering construction innovations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Downtime (DT) caused by non-availability of equipment and equipment breakdown has non-trivial impact on the performance of construction projects. Earlier research has often addressed this fact, but it has rarely explained the causes and consequences of DT – especially in the context of developing countries. This paper presents a DT model to address this issue. Using this model, the generic factors and processes related to DT are identified, and the impact of DT is quantified. By applying the model framework to nine road projects in Nepal, the impact of DT is explored in terms of its duration and cost. The research findings highlight how various factors and processes interact with each other to create DT, and mitigate or exacerbate its impact on project performance. It is suggested that construction companies need to adopt proactive equipment management and maintenance programs to minimize the impact of DT.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article analyses the inconsistent approaches taken by courts when interpreting provisions of the Corporations Act which address debts or expenses “incurred” by receivers, administrators and liquidators. The article contends for a consistent construction of these provisions which will enable the legislation to operate (as was intended) for the benefit of persons who supply goods, services or labour to companies in external administration. The article explains how and why debts can be “incurred” by insolvency practitioners continuing on pre-existing contracts. Specifically, the article contends for a construction of ss 419 and 443A of the Corporations Act which renders receivers and administrators personally liable for certain entitlements of employees (eg, wages and superannuation contributions) which become due and payable by reason of the decision of a receiver or administrator to continue a pre-existing contract rather than terminate it.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide a new type of entry mode decision-making model for construction enterprises involved in international business. Design/methodology/approach – A hybrid method combining analytic hierarchy process (AHP) with preference ranking organization method for enrichment evaluations (PROMETHEE) is used to aid entry mode decisions. The AHP is used to decompose the entry mode problem into several dimensions and determine the weight of each criterion. In addition, PROMETHEE method is used to rank candidate entry modes and carry out sensitivity analyses. Findings – The proposed decision-making method is demonstrated to be a suitable approach to resolve the entry mode selection decision problem. Practical implications – The research provides practitioners with a more systematic decision framework and a more precise decision method. Originality/value – The paper sheds light on the further development of entry strategies for international construction markets. It not only introduces a new decision-making model for entry mode decision making, but also provides a conceptual framework with five determinants for a construction company entry mode selection based on the unique properties of the construction industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The decision in the New South Wales Supreme Court in Boyce v McIntyre [2008] NSWSC 1218 involved determination of a number of issues relating to an assessment of costs under the Legal Profession Act 2004 (NSW). The issue of broad significance was whether a non-associated third party payer must pay the fixed fee that was agreed between the law practice and the client. The court found that the client agreement did not form the basis of assessing costs for the non-associated third party payer.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In BHP Coal Pty Ltd v K Orenstein & Koppel AG (No 2) [2009] QSC 64 McMurdo J considered the circumstances in which the ordinary rule under r 681 of the Uniform Civil Procedure Rules 1999 (Qld) (UCPR) that costs should follow the event should be departed from in favour of a party who was unsuccessful overall, but who succeeded on particular questions. When the court is satisfied that a departure from the usual order under r 681 of the UCPR is justified, it appears increasingly willing to exercise the power in r 684(2) to declare what percentage of costs was applicable to a particular issue

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Virgtel Ltd v Zabusky [2009] QCA 92 the Queensland Court of Appeal considered the scope of an order “as to costs only” within the meaning of s 253 of the Supreme Court Act 1995 (Qld) (‘the Act”). The Court also declined to accept submissions from one of the parties after oral hearing, and made some useful comments which serve as a reminder to practitioners of their obligations in that regard.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The decision of Applegarth J in Heartwood Architectural & Joinery Pty Ltd v Redchip Lawyers [2009] QSC 195 (27 July 2009) involved a costs order against solicitors personally. This decision is but one of several recent decisions in which the court has been persuaded that the circumstances justified costs orders against legal practitioners on the indemnity basis. These decisions serve as a reminder to practitioners of their disclosure obligations when seeking any interlocutory relief in an ex parte application. These obligations are now clearly set out in r 14.4 of the Legal Profession (Solicitors) Rule 2007 and r 25 of 2007 Barristers Rule. Inexperience or ignorance will not excuse breaches of the duties owed to the court.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The recent decision of the Court of Appeal in AGL Sales (Qld) Pty Ltd v Dawson Sales Pty Ltd [2009] QCA 262 provides clear direction on the Court’s expectations of a party seeking leave to appeal a costs order.This decision is likely to impact upon common practice in relation to appeals against costs orders. It sends a clear message to trial judges that they should not give leave as of course when giving a judgment in relation to costs, and that parties seeking leave under s 253 of the Supreme Court Act 1995 (Qld) should make a separate application. The application should be supported by material presenting an arguable case that the trial judge made an error in the exercise of the discretion of the kind described in House v King (1936) 55 CLR 499. A different, and interesting, aspect of this appeal is that it was the first wholly electronic civil appeal. The court-provided technology had been adopted at trial, and the Court of Appeal dispensed with any requirement for hard copy appeal record books.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the absence of a benchmarking mechanism specifically designed for local requirements and characteristics, a carbon dioxide footprint assessment and labelling scheme for construction materials is urgently needed to promote carbon dioxide reduction in the construction industry. This paper reports on a recent interview survey of 18 senior industry practitioners in Hong Kong to elicit their knowledge and opinions concerning the potential of such a carbon dioxide labelling scheme. The results of this research indicate the following. A well-designed carbon dioxide label could stimulate demand for low carbon dioxide construction materials. The assessment of carbon dioxide emissions should be extended to different stages of material lifecycles. The benchmarks for low carbon dioxide construction materials should be based on international standards but without sacrificing local integrity. Administration and monitoring of the carbon dioxide labelling scheme could be entrusted to an impartial and independent certification body. The implementation of any carbon dioxide labelling schemes should be on a voluntary basis. Cost, functionality, quality and durability are unlikely to be replaced by environmental considerations in the absence of any compelling incentives or penalties. There are difficulties in developing and operating a suitable scheme, particularly in view of the large data demands involved, reluctance in using low carbon dioxide materials and limited environmental awareness.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Contractors have to bid competitively for most of their work and at the same time deal with the risks and uncertainties connected with bid submission. This article examines the factors involved in tender pricing and how they interrelate. From this, a conceptual model of contractors’ pricing strategy is developed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Knowledge Management (KM) is a process that focuses on knowledge-related activities to facilitate knowledge creation, capture, transformation and use, with the ultimate aim of leveraging organisations’ intellectual capital to achieve organisational objectives. Organisational culture and climate have been identified as major catalysts to knowledge creation and sharing, and hence are considered important dimensions of KM research. The fragmented and hierarchical nature of the construction industry illustrates its difficulties to operate in a co-ordinated and homogeneous way when dealing with knowledge-related issues such as research and development, training and innovation. The culture and climate of organisations operating within the construction industry are profoundly shaped by the long-established characteristics of the industry, whilst also being influenced by the changes within the sector. Meanwhile, the special project-based structure of construction organisations constitutes additional challenges in facing knowledge production. The study this paper reports on addresses the impact of organisational culture and climate on the intensity of KM activities within construction organisations, with specific focus on the managerial activities that help to manage these challenges and to facilitate KM. A series of semi-structured interviews were undertaken to investigate the KM activities of the contractors operating in Hong Kong. The analysis on the qualitative data revealed that leadership on KM, innovation management, communication management and IT development were key factors that impact positively on the KM activities within the organisations under investigation.