985 resultados para LOB, repetitive construction, scheduling, work continuity, waste


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Office building retrofit projects are increasingly more intensified as existing buildings are aging. At the same time, building owners and occupants are looking for environmentally sustainable products. These retrofit projects usually take place in center business district (CBDs) with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors. Despite their large involvement, they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. Few research has been done on their performance of waste management operations. This paper identifies characteristics of on-site waste in office building retrofit projects. It examines the specific requirements for contractors to manage waste in the projects before exploring the existing performance of SMEs. By comparing requirements for SMEs and their potential areas for improvement, a framework is established for performance promotion of SMEs in on-site waste management of office building retrofit projects. The paper will raise the consciousness and commitment of SMEs as sub-contractors to waste management. It also explores ways of supporting SMEs for experience accumulation, performance promotion and project culture establishment towards effective and efficient on-site waste management in the growing sector of office building retrofit and upgrade.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Community-based activism against proposed construction projects is growing. Many protests are poorly managed and escalate into long-term and sometimes acrimonious disputes which damage communities, firms and the construction industry as a whole. Using a thematic storytelling approach which draws on ethnographic method, within a single case study framework, new insights into the social forces that shape and sustain community-based protest against construction projects are provided. A conceptual model of protest movement continuity is presented which highlights the factors that sustain protest continuity over time. The model illustrates how social contagion leads to common community perceptions of development risk and opportunity, to a positive internalization of collective values and identity, to a strategic utilization of social capital and an awareness of the need to manage the emotional dynamics of protest through mechanisms such as symbolic artefacts.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This work investigated the production of bio oil from plum seed (Zyziphus jujuba) by fixed bed pyrolysis technology. A fixed bed pyrolysis system has been designed and fabricated for production of bio oil. The major components of the system are: fixed bed reactor, liquid condenser and liquid collector. Nitrogen gas was used to maintain the inert atmosphere in the reactor where the pyrolysis reaction takes place. The feedstock considered in this study is plum seed as it is available waste material in Bangladesh. The reactor is heated by means of a cylindrical biomass external heater. Rice husk was used as the energy source. The products are oil, char and gas. The parameters varied are reactor bed temperature, running time and feed particle size. The parameters are found to influence the product yields significantly. The maximum liquid yield of 39 wt% at 5200C for a feed particle size of 2.36-4.75 mm and a gas flow rate of 8 liter/min with a running time of 120 minute. The pyrolysis oil obtained at these optimum process conditions are analyzed for some of their properties as an alternative fuel. The density of the liquid was closer with diesel. The viscosity of the plum seed liquid was lower than that of the conventional fuels. The calorific value of the pyrolysis oil is one half of the diesel fuel.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose – Rehearsing practical site operations is without doubt one of the most effective methods for minimising planning mistakes, because of the learning that takes place during the rehearsal activity. However, real rehearsal is not a practical solution for on-site construction activities, as it not only involves a considerable amount of cost but can also have adverse environmental implications. One approach to overcoming this is by the use of virtual rehearsals. The purpose of this paper is to investigate an approach to simulation of the motion of cranes in order to test the feasibility of associated construction sequencing and generate construction schedules for review and visualisation. Design/methodology/approach – The paper describes a system involving two technologies, virtual prototyping (VP) and four-dimensional (4D) simulation, to assist construction planners in testing the sequence of construction activities when mobile cranes are involved. The system consists of five modules, comprising input, database, equipment, process and output, and is capable of detecting potential collisions. A real-world trial is described in which the system was tested and validated. Findings – Feedback from the planners involved in the trial indicated that they found the system to be useful in its present form and that they would welcome its further development into a fully automated platform for validating construction sequencing decisions. Research limitations/implications – The tool has the potential to provide a cost-effective means of improving construction planning. However, it is limited at present to the specific case of crane movement under special consideration. Originality/value – This paper presents a large-scale, real life case of applying VP technology in planning construction processes and activities.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Accelerating a project can be rewarding. The consequences, however, can be troublesome if productivity and quality are sacrificed for the sake of remaining ahead of schedule, such that the actual schedule benefits are often barely worth the effort. The tradeoffs and paths of schedule pressure and its causes and effects are often overlooked when schedule decisions are being made. This paper analyses the effects that schedule pressure has on construction performance, and focuses on tradeoffs in scheduling. A research framework has been developed using a causal diagram to illustrate the cause-and-effect analysis of schedule pressure. An empirical investigation has been performed by using survey data collected from 102 construction practitioners working in 38 construction sites in Singapore. The results of this survey data analysis indicate that advantages of increasing the pace of work—by working under schedule pressure—can be offset by losses in productivity and quality. The negative effects of schedule pressure arise mainly by working out of sequence, generating work defects, cutting corners, and losing the motivation to work. The adverse effects of schedule pressure can be minimized by scheduling construction activities realistically and planning them proactively, motivating workers, and by establishing an effective project coordination and communication mechanism.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The market of building retrofits is increasingly more intensified as existing buildings are aging. The building retrofit projects involve existing buildings which impose constraints on stakeholders throughout the project process. They are also risky, complex, less predictable and difficult to be well planned with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors, but they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. This paper first discusses the requirements of waste management in building retrofit projects considering specific project characteristics and work natures, and highlights the importance of involving SMEs in waste planning and management through an appropriate way. By utilizing semi-structured interviews, this research develops a process model for SMEs to be applied in waste management. A collaboration scenario is also developed for collaborative waste planning and management by SMEs as subcontractors and large companies as main contractors. Findings from the paper will promote coordination of project delivery and waste management in building retrofit projects, and improve the involvement and performance of SMEs in dealing with waste problems.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Community-based protests against major construction and engineering projects are becoming increasingly common as concerns over issues such as corporate social accountability, climate change and corruption become more prominent in the public's mind. Public perceptions of risk associated with these projects can have a contagious effect, which mismanaged can escalate into long-term and sometimes acrimonious protest stand-offs that have negative implications for the community, firms involved and the construction industry as a whole. This paper investigates the role of core group members in sustaining community-based protest against construction and engineering projects. Using a thematic story telling approach which draws on ethnographic method and social contagion theories, it presents an in-depth analysis of a single case study - one of Australia's longest standing community protests against a construction project. It concludes that core group members play a critical role, within anarchic structures which provide a high degree of spontaneity and improvisation, in sustaining movement continuity by building collective identity, mobilising resources and a moving interface which developers find hard to communicate with.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A recurring feature of modern practice is the stress placed on project professionals, with both debilitating effects on the people concerned and indirectly affecting project success. Cost estimation, for example, is an essential task for successful project management involving a high level of uncertainty. It is not surprising, therefore, that young cost estimators especially can become stressful at work due to a lack of experience and the heavy responsibilities involved. However, the concept of work stress and the associated underlying dimensions has not been clearly defined in extant studies in the construction management field. To redress this situation, an updated psychology perceived stress questionnaire (PSQ) , first developed by Levenstein et al (1993) and revised by Fliege et al (2005), is used to explore the dimensions of work stress with empirical evidence from the construction industry in China. With 145 reliable responses from young (less than 5 years’ experience) Chinese cost estimators, this study explores the internal dimensions of work stress, identifying four dimensions of tension, demands, lack of joy and worries. It is suggested that this four-dimensional structure may also be applicable in a more general context.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose The purpose of this paper is to examine equal employment policies in Australia’s male-dominated construction industry and categorise the types of activities undertaken against an equal employment typology to identify links to outcomes for women in the form of increased participation and management. Design/methodology/approach To explore the issue of low representation of women in construction through the content analysis of 83 construction organisations’ equal employment opportunity (EEO) reports. Findings This industry is not engaging with equal employment issues and the numbers of women working in the industry and/or management are based on individual decision rather than an institutional commitment to equality in diversity. Research limitations/implications Australian legislation mandates organisational reporting of relevant data and offers public access to this information offering a unique data set. Practical implications An ageing population means that the predominately older male workforce is leaving construction in greater numbers with fewer potential replacements making new labour markets a vital consideration. Social implications Legislation and organisational policies designed to promote EEO for women have existed in numerous countries for decades. One objective of this legislation was to reduce male domination in senior positions and industries/occupations where women were under-represented. Despite this, few women are employed in construction in operational or management roles worldwide. Originality/value This study offers a comprehensive analysis of a male-dominated industry in one jurisdiction rather than a few selected cases and uses a broader rigorous typology for analysis that acknowledges both equal and different treatment options.