Critical factors for waste management in office building retrofit projects in Australia
Data(s) |
01/12/2014
|
---|---|
Resumo |
Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention. |
Formato |
application/pdf |
Identificador | |
Publicador |
Elsevier BV |
Relação |
http://eprints.qut.edu.au/79015/1/Accepted_final_draft.pdf DOI:10.1016/j.resconrec.2014.10.007 Li, Mei & Yang, Jay (2014) Critical factors for waste management in office building retrofit projects in Australia. Resources, Conservation and Recycling, 93, pp. 85-98. |
Direitos |
Copyright 2014 Elsevier B.V. NOTICE: this is the author’s version of a work that was accepted for publication in Resources, Conservation and Recycling. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in Resources, Conservation and Recycling, Volume 93, (December 2014), DOI: 10.1016/j.resconrec.2014.10.007 |
Fonte |
School of Civil Engineering & Built Environment; Science & Engineering Faculty |
Palavras-Chave | #120201 Building Construction Management and Project Planning #Waste management #Building retrofit #Critical factor |
Tipo |
Journal Article |