974 resultados para Construction Planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most counties have bridges that are no longer adequate, and are faced with large capital expenditure for replacement structures of the same size. In this regard, low water stream crossings (LWSCs) can provide an acceptable, low cost alternative to bridges and culverts on low volume and reduced maintenance level roads. In addition to providing a low cost option for stream crossings, LWSCs have been designed to have the additional benefit of streambed stabilization. Considerable information on the current status of LWSCs in Iowa, along with insight of needs for design assistance, was gained from a survey of county engineers that was conducted as part of this research (Appendix A). Copies of responses and analysis are included in Appendix B. This document provides guidelines for the design of LWSCs. There are three common types of LWSCs: unvented ford, vented ford with pipes, and low water bridges. Selection among these depends on stream geometry, discharge, importance of road, and budget availability. To minimize exposure to tort liability, local agencies using low water stream crossings should consider adopting reasonable selection and design criteria and certainly provide adequate warning of these structures to road users. The design recommendations included in this report for LWSCs provide guidelines and suggestions for local agency reference. Several design examples of design calculations are included in Appendix E.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most Iowa counties maintain low volume roads with at least one bridge or culvert that is structurally deficient or obsolete. In some counties the percentage of deficient drainage structures may be as high as 62%. Replacement with structures of similar size would require large capital expenditures that many counties cannot afford. Low water stream crossings (LWSCs) may be an acceptable lowcost alternative in some cases.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In July 2006, construction began on an accelerated bridge project in Boone County, Iowa that was composed of precast substructure elements and an innovative, precast deck panel system. The superstructure system consisted of full-depth deck panels that were prestressed in the transverse direction, and after installation on the prestressed concrete girders, post-tensioned in the longitudinal direction. Prior to construction, laboratory tests were completed on the precast abutment and pier cap elements. The substructure testing was to determine the punching shear strength of the elements. Post-tensioning testing and verification of the precast deck system was performed in the field. The forces in the tendons provided by the contractor were verified and losses due to the post-tensioning operation were measured. The stress (strain) distribution in the deck panels due to the post-tensioning was also measured and analyzed. The entire construction process for this bridge system was documented. Representatives from the Boone County Engineers Office, the prime contractor, precast fabricator, and researchers from Iowa State University provided feedback and suggestions for improving the constructability of this design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed in 2007 over a stream. The bridge’s precast elements included precast cap beams and precast box girders. Precast element fabrication and bridge construction were observed, two precast box girders were tested in the laboratory, and the completed bridge was field tested in 2007 and 2008.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Black Hawk County (BHC) has developed a precast modified beam-in-slab bridge (PMBISB) system for use with accelerated construction. A typical PMBISB is comprised of five to six precast MBISB panels and is used on low volume roads, on short spans, and is installed and fabricated by county forces. Precast abutment caps and a precast abutment backwall were also developed by BHC for use with the PMBISB. The objective of the research was to gain knowledge of the global behavior of the bridge system in the field, to quantify the strength and behavior of the individual precast components, and to develop a more time efficient panel-to-panel field connection. Precast components tested in the laboratory include two precast abutment caps, three different types of deck panel connections, and a precast abutment backwall. The abutment caps and backwall were tested for behavior and strength. The three panel-to-panel connections were tested in the lab for strength and were evaluated based on cost and constructability. Two PMBISB were tested in the field to determine stresses, lateral distribution characteristics, and overall global behavior.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project combined various datasets, existing and created for this project, into an Interactive Mapping Service (IMS) for use by Iowa DOT personnel, county planning and zoning departments and the public in order to make more informed decisions regarding aggregate sources and future access to them. Iowa DOT Technical Advisory Committee meetings were held, along with public forum presentations, in order to understand better the social, ecological and economic limitations to extracting aggregate. The information needed by potential users was conveyed and integrated into a single informational source, the Aggregate Planning IMS.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The need to construct bridges that last longer, are less expensive, and take less time to build has increased. The importance of accelerated bridge construction (ABC) technologies has been realized by the Federal Highway Administration (FHWA) and the Iowa Department of Transportation (DOT) Office of Bridges and Structures. This project is another in a series of ABC bridge projects undertaken by the Iowa DOT. Buena Vista County, Iowa, with the assistance of the Iowa Department of Transportation (DOT) and the Bridge Engineering Center (BEC) at Iowa State University, constructed a two-lane single-span precast box girder bridge, using rapid construction techniques. The design involved the use of precast, pretensioned components for the bridge superstructure, substructure, and backwalls. This application and demonstration represents an important step in the development and advancement of these techniques in Iowa as well as nationwide. Prior funding for the design and construction of this bridge (including materials) was obtained through the FHWA Innovative Bridge Research and Deployment (IBRD) Program. The Iowa Highway Research Board (IHRB) provided additional funding to test and evaluate the bridge. This project directly addresses the IBRD goal of demonstrating (and documenting) the effectiveness of innovative materials and construction techniques for the construction of new bridge structures. Evaluation of performance was formulated through comparisons with design assumptions and recognized codes and standards including American Association of State Highway and Transportation Officials (AASHTO) specifications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In addition to the Fair Housing Act of 1968, other legislation has expanded protection from discrimination for individuals with disabilities, including the Rehabilitation Act of 1973 and the Americans with Disabilities Act of 1990. Notably, the Fair Housing Amendments Act (FHAA), signed into law by Ronald Reagan in 1988, expanded equal housing protection to individuals with disabilities. The legislative history behind the 1988 Amendments notes that one aim of the law was to address both purposeful discrimination as well as what is sometimes unintentional discrimination caused by the design and construction of inaccessible housing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa Code Section 216A.135 requires the Criminal and Juvenile Justice Planning Advisory Council (CJJPAC) to submit a long-range plan for Iowa's justice system to the Governor and General Assembly every five years. The Criminal and Juvenile Justice Advisory Council directed that the 2005 plan be developed with input from the public. A public hearing was held in September 2004, utilizing the Iowa Communications Network at five sites across Iowa. Using the information gained, the Council developed new goals and strategies and modified others from the 2000 plan. The 2005 Long Range Goals for Iowa’s Criminal and Juvenile Justice Systems, organized as follows, are meant to facilitate analyses and directions for justice system issues and concerns in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This 2012 Annual Report further summarizes the work of the Commission during the last year and provides planning recommendations for the future of the Capitol Complex. Please note that Iowa Code Chapter 8A.373 provides that before any physical changes are made to the state capitol complex "it shall be the duty of the officers, commissions, and councils charged by law with the duty of determining such questions to call upon" the Capitol Planning Commission for advice. The Capitol Planning Commission members, as well as DAS Staff, welcome the opportunity to discuss future projects at the request of any legislator.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report describes the highway construction program, actual expenditures of the program and contractual obligations of the program for FY 2012.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Chariton Valley Planning & Development Council of Governments in Centerville, Iowa for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

L'époque charnière de la fin du xive siècle, début du xve siècle, voit émerger des voix auctoriales de plus en plus engagées, subjectives et conscientes de leur talent. Cet article tend à montrer en quoi la notion d'ethos issue de la linguistique moderne permet de caractériser l'évolution d'une de ces voix médiévales, celle d'un traducteur du xve siècle, Laurent de Premierfait, au regard de la tradition. L'étude des prologues de ses traductions témoigne d'une forte influence de la situation de communication et de la scène d'énonciation, celle du patronage et de la tradition poétique héritée de la traduction du xive siècle, qui oblige le traducteur à négocier sa propre image dans son texte. Ainsi, l'auteure de cet article propose de caractériser à travers différents indices rhétoriques, poétiques, discursifs, voire extra-discursifs, les deux êthê qui émanent de ces prologues : un ethos de moraliste, conforme aux attentes du public et un ethos d'humaniste, révélant un positionnement singulier et individuel du traducteur dans la communauté des écrivains.