US 30 Proposed Expansion Benton County, Iowa, Enviornmental Assessment and Section 4(f) De Minimis Impact Finding, June 11, 2012
Data(s) |
11/06/2012
|
---|---|
Resumo |
The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary. |
Formato |
|
Identificador |
http://publications.iowa.gov/13634/1/US_30_Benton_Co_Complete_EA_Jun_2012_to_FHWA.pdf (2012) US 30 Proposed Expansion Benton County, Iowa, Enviornmental Assessment and Section 4(f) De Minimis Impact Finding, June 11, 2012. Transportation, Department of |
Idioma(s) |
en |
Relação |
http://publications.iowa.gov/13634/ |
Palavras-Chave | #Research #Roads and highways #Design and Construction #Transportation |
Tipo |
Newsletter NonPeerReviewed |