Precast Concrete Elements for Accelerated Bridge Construction Final Report Volume 2. Laboratory Testing, Field Testing, and Evaluation of a Precast Concrete Bridge: Madison County Bridge, January 2009


Autoria(s): Desconhecido
Data(s)

01/01/2009

Resumo

The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed in 2007 over a stream. The bridge’s precast elements included precast cap beams and precast box girders. Precast element fabrication and bridge construction were observed, two precast box girders were tested in the laboratory, and the completed bridge was field tested in 2007 and 2008.

Formato

pdf

Identificador

http://publications.iowa.gov/13620/1/TR-561_Vol_2.pdf

(2009) Precast Concrete Elements for Accelerated Bridge Construction Final Report Volume 2. Laboratory Testing, Field Testing, and Evaluation of a Precast Concrete Bridge: Madison County Bridge, January 2009. Transportation, Department of

Idioma(s)

en

Relação

http://publications.iowa.gov/13620/

Palavras-Chave #Research #Concrete #Roads and highways #Design and Construction #Transportation
Tipo

Newsletter

NonPeerReviewed