917 resultados para Real environment
Resumo:
The learning experiences of student nurses undertaking clinical placement are reported widely, however little is known about the learning experiences of health professionals undertaking continuing professional development (CPD) in a clinical setting, especially in palliative care. The aim of this study, which was conducted as part of the national evaluation of a professional development program involving clinical attachments with palliative care services (The Program of Experience in the Palliative Approach [PEPA]), was to explore factors influencing the learning experiences of participants over time. Thirteen semi-structured, one-to-one telephone interviews were conducted with five participants throughout their PEPA experience. The analysis was informed by the traditions of adult, social and psychological learning theories and relevant literature. The participants' learning was enhanced by engaging interactively with host site staff and patients, and by the validation of their personal and professional life experiences together with the reciprocation of their knowledge with host site staff. Self-directed learning strategies maximised the participants' learning outcomes. Inclusion in team activities aided the participants to feel accepted within the host site. Personal interactions with host site staff and patients shaped this social/cultural environment of the host site. Optimal learning was promoted when participants were actively engaged, felt accepted and supported by, and experienced positive interpersonal interactions with, the host site staff.
Resumo:
Many infrastructure and necessity systems such as electricity and telecommunication in Europe and the Northern America were used to be operated as monopolies, if not state-owned. However, they have now been disintegrated into a group of smaller companies managed by different stakeholders. Railways are no exceptions. Since the early 1980s, there have been reforms in the shape of restructuring of the national railways in different parts of the world. Continuous refinements are still conducted to allow better utilisation of railway resources and quality of service. There has been a growing interest for the industry to understand the impacts of these reforms on the operation efficiency and constraints. A number of post-evaluations have been conducted by analysing the performance of the stakeholders on their profits (Crompton and Jupe 2003), quality of train service (Shaw 2001) and engineering operations (Watson 2001). Results from these studies are valuable for future improvement in the system, followed by a new cycle of post-evaluations. However, direct implementation of these changes is often costly and the consequences take a long period of time (e.g. years) to surface. With the advance of fast computing technologies, computer simulation is a cost-effective means to evaluate a hypothetical change in a system prior to actual implementation. For example, simulation suites have been developed to study a variety of traffic control strategies according to sophisticated models of train dynamics, traction and power systems (Goodman, Siu and Ho 1998, Ho and Yeung 2001). Unfortunately, under the restructured railway environment, it is by no means easy to model the complex behaviour of the stakeholders and the interactions between them. Multi-agent system (MAS) is a recently developed modelling technique which may be useful in assisting the railway industry to conduct simulations on the restructured railway system. In MAS, a real-world entity is modelled as a software agent that is autonomous, reactive to changes, able to initiate proactive actions and social communicative acts. It has been applied in the areas of supply-chain management processes (García-Flores, Wang and Goltz 2000, Jennings et al. 2000a, b) and e-commerce activities (Au, Ngai and Parameswaran 2003, Liu and You 2003), in which the objectives and behaviour of the buyers and sellers are captured by software agents. It is therefore beneficial to investigate the suitability or feasibility of applying agent modelling in railways and the extent to which it might help in developing better resource management strategies. This paper sets out to examine the benefits of using MAS to model the resource management process in railways. Section 2 first describes the business environment after the railway 2 Modelling issues on the railway resource management process using MAS reforms. Then the problems emerge from the restructuring process are identified in section 3. Section 4 describes the realisation of a MAS for railway resource management under the restructured scheme and the feasible studies expected from the model.
Resumo:
The term “cloud computing” has emerged as a major ICT trend and has been acknowledged by respected industry survey organizations as a key technology and market development theme for the industry and ICT users in 2010. However, one of the major challenges that faces the cloud computing concept and its global acceptance is how to secure and protect the data and processes that are the property of the user. The security of the cloud computing environment is a new research area requiring further development by both the academic and industrial research communities. Today, there are many diverse and uncoordinated efforts underway to address security issues in cloud computing and, especially, the identity management issues. This paper introduces an architecture for a new approach to necessary “mutual protection” in the cloud computing environment, based upon a concept of mutual trust and the specification of definable profiles in vector matrix form. The architecture aims to achieve better, more generic and flexible authentication, authorization and control, based on a concept of mutuality, within that cloud computing environment.
Resumo:
Purpose of study: Traffic conflicts occur when trains on different routes approach a converging junction in a railway network at the same time. To prevent collisions, a right-of-way assignment is needed to control the order in which the trains should pass the junction. Such control action inevitably requires the braking and/or stopping of trains, which lengthens their travelling times and leads to delays. Train delays cause a loss of punctuality and hence directly affect the quality of service. It is therefore important to minimise the delays by devising a suitable right-of-way assignment. One of the major difficulties in attaining the optimal right-of-way assignment is that the number of feasible assignments increases dramatically with the number of trains. Connected-junctions further complicate the problem. Exhaustive search for the optimal solution is time-consuming and infeasible for area control (multi-junction). Even with the more intelligent deterministic optimisation method revealed in [1], the computation demand is still considerable, which hinders real-time control. In practice, as suggested in [2], the optimality may be traded off by shorter computation time, and heuristic searches provide alternatives for this optimisation problem.
Resumo:
Successful construction project managers often stress the importance of team working, relationship management, project environment and senior management commitment as being key determinants of project success. However, it is generally accepted that the construction industry has stronger preference for displaying distrust rather than emancipating the full benefits of cooperation. In the research domain, the impact of culture and organisation on project performance is becoming an increasingly important topic for the establishment of a sound relational approach to projects. Relational procurement strategies emphasise the importance of sustainable relationships. However, the efficacy of relational contracting is, so far, unproven. This study examines the organisational factors that facilitates sustainable relationship between project organisations and hence, lead to long-term business success. Initial findings captured from a survey undertaken with construction contracting organisations in Australia, where the perceptions of professional personnel and supply chain relationships are reported in this paper. A four-level project performance effectiveness model developed in this research is also presented.
Resumo:
Popular wireless network standards, such as IEEE 802.11/15/16, are increasingly adopted in real-time control systems. However, they are not designed for real-time applications. Therefore, the performance of such wireless networks needs to be carefully evaluated before the systems are implemented and deployed. While efforts have been made to model general wireless networks with completely random traffic generation, there is a lack of theoretical investigations into the modelling of wireless networks with periodic real-time traffic. Considering the widely used IEEE 802.11 standard, with the focus on its distributed coordination function (DCF), for soft-real-time control applications, this paper develops an analytical Markov model to quantitatively evaluate the network quality-of-service (QoS) performance in periodic real-time traffic environments. Performance indices to be evaluated include throughput capacity, transmission delay and packet loss ratio, which are crucial for real-time QoS guarantee in real-time control applications. They are derived under the critical real-time traffic condition, which is formally defined in this paper to characterize the marginal satisfaction of real-time performance constraints.
Resumo:
The need to better understand and deal with workplace stress has major implications for the construction industry, especially on a project level, because of its potential to directly impact on site productivity and safety, and ultimately, the achievement of project objectives. While there has been some understanding of the effect of workplace stress within the construction industry, the majority of these studies have explored individual determinants of workplace stress among construction professionals such as architects, engineers, quantity surveyors etc. To date, very little research has focused on workplace stress as encountered by construction site operatives. This is an important research deficiency as construction site operatives typically make up a significant percentage of on-site workforce and contribute most directly to project success. To address this imbalance in research, this paper proposes a theoretical framework to better understand site operatives’ experience of stress from a cultural perspective on three levels: individual, project and organizational which has been largely neglected in previous studies.
Resumo:
For a mobile robot to operate autonomously in real-world environments, it must have an effective control system and a navigation system capable of providing robust localization, path planning and path execution. In this paper we describe the work investigating synergies between mapping and control systems. We have integrated development of a control system for navigating mobile robots and a robot SLAM system. The control system is hybrid in nature and tightly coupled with the SLAM system; it uses a combination of high and low level deliberative and reactive control processes to perform obstacle avoidance, exploration, global navigation and recharging, and draws upon the map learning and localization capabilities of the SLAM system. The effectiveness of this hybrid, multi-level approach was evaluated in the context of a delivery robot scenario. Over a period of two weeks the robot performed 1143 delivery tasks to 11 different locations with only one delivery failure (from which it recovered), travelled a total distance of more than 40km, and recharged autonomously a total of 23 times. In this paper we describe the combined control and SLAM system and discuss insights gained from its successful application in a real-world context.
Resumo:
Infrastructure organisations such as airport, seaport, rail and road are operating in an increasingly challenging business environment as a result of globalisation, privatisation and deregulation. These organisations must ensure that their main resource i.e. their infrastructure assets are well managed in order to support their business operations. Brisbane Airport is used as a case study to understand the challenges faced in the management of infrastructure assets as well as the approaches used to overcome them. The findings can be useful in helping asset managers to identify the resources they should seek to manipulate in order to make improvement to their activities and contribute to the overall performance of their organisation.
Resumo:
Purpose: To undertake rigorous psychometric testing of the newly developed contemporary work environment measure (the Brisbane Practice Environment Measure [B-PEM]) using exploratory factor analysis and confirmatory factor analysis. Methods: Content validity of the 33-item measure was established by a panel of experts. Initial testing involved 195 nursing staff using principal component factor analysis with varimax rotation (orthogonal) and Cronbach's alpha coefficients. Confirmatory factor analysis was conducted using data from a further 983 nursing staff. Results: Principal component factor analysis yielded a four-factor solution with eigenvalues greater than 1 that explained 52.53% of the variance. These factors were then verified using confirmatory factor analysis. Goodness-of-fit indices showed an acceptable fit overall with the full model, explaining 21% to 73% of the variance. Deletion of items took place throughout the evolution of the instrument, resulting in a 26-item, four-factor measure called the Brisbane Practice Environment Measure-Tested. Conclusions: The B-PEM has undergone rigorous psychometric testing, providing evidence of internal consistency and goodness-of-fit indices within acceptable ranges. The measure can be utilised as a subscale or total score reflective of a contemporary nursing work environment. Clinical Relevance: An up-to-date instrument to measure practice environment may be useful for nursing leaders to monitor the workplace and to assist in identifying areas for improvement, facilitating greater job satisfaction and retention.
Resumo:
Various countries have been introducing sustainable assessment tools for real estate design to produce integrated sustainability components not just for the building, but also the landscape component of the development. This paper aims to present the comparison between international and local assessment tools of landscape design for housing estate developments in Bangkok Metropolitan Region (BMR), Thailand. The methodologies used are to review, then compare and identify discrepancy indicators among the tools. This paper will examine four international tools; LEED for Neighbourhood Development (LEED – ND) of United State of America (USA), EnviroDevelopment standards of Australia, Residential Landscape Sustainability of United Kingdom (UK) and Green Mark for Infrastructure of Singapore; and three BMR’s existing tools; Land Subdivision Act B.E. 2543, Environmental Impact Assessment Monitoring Awards (EIA-MA) and Thai’s Rating for Energy and Environmental Sustainability of New construction and major renovation (TREES-NC). The findings show that there are twenty two elements of three categories which are neighbourhood design, community management, and environmental condition. Moreover, only one element in neighbourhood designs different between the international and local tools. The sustainable assessment tools have existed in BMR but they are not complete in only one assessment tool. Thus, the development of new comprehensive assessment tool will be necessary in BMR; however, it should meet the specific environment and climate condition for housing estate development at BMR.
Resumo:
In many countries, the main providers for major infrastructure projects are government or public agencies. Public infrastructure projects includes economic and social infrastructure such as transportation, education and health facilities. Most decision-making models for delivery of public infrastructure projects are heavily weighted towards financial/economic factors. In Australia, public participation is an essential instrument in the procurement of infrastructure and development within Australia. This study reviews the public participation, values and interests in the procurement of infrastructure projects in Australia, and identifies the research direction in this research area in order to improve the decision-making models that capture stakeholder social, economical and environmental concerns in infrastructure projects.
Resumo:
The detached housing scheme is a unique and exclusive segment of the residential property market in Malaysia. Generally, the product is expensive and for many Malaysians who can afford them, owning a detached house is a once in a lifetime opportunity. In spite of this, most of the owners fail to fully comprehend the specific need of this type of housing scheme, increasing the risk of it being a problematic project. Unlike other types of pre-designed ‘mass housing’ schemes, the detached housing scheme may be built specifically to cater the needs and demands of its owner. Therefore, maximum owner participation is vital as the development progresses to guarantee the success of the project. In addition, due to it’s unique design the house would have to individually comply with the requirements and regulations of relevant authorities. Failure of owner to recognise this will result in delays, fines and penalties, disputes and ultimately cost overruns. These circumstances highlight the need for a model to guide the owner through the entire development process of a detached house. Therefore, this research aims to develop a model for a successful detached housing development in Malaysia through maximising owner participation during it’s various development stages. To achieve this, questionnaire surveys and case studies methods shall be employed to acquire the detached housing owners’ experiences in developing their detached houses in Malaysia. Relevant statistical tools shall be applied to analyse the responses. The results gained from this study shall be synthesised into a model of successful detached housing development for the reference of future detached housing owners in Malaysia.
Resumo:
Staff and students of the Surveying and Spatial Sciences discipline at QUT have worked collaboratively with the Institute of Sustainable Resources in the creation and development of spatial information layers and infrastructure to support multi-disciplinary research efforts at the Samford Ecological Research Facility (SERF). The SERF property is unique in that it provides staff and students with a semi-rural controlled research base for multiple users. This paper aims to describe the development of a number of spatial information layers and network of survey monuments that assist and support research infrastructure at SERF. A brief historical background about the facility is presented along with descriptions of the surveying and mapping activities undertaken. These broad ranging activities include introducing monument infrastructure and a geodetic control network; surveying activities for aerial photography ground-control targets including precise levelling with barcode instruments; development of an ortho-rectified image spatial information layer; Real-Time-Kinematic Global Positioning Systems (RTK-GPS) surveying for constructing 100metre confluence points/monuments to support science-based disciplines to undertake environmental research transects and long-term ecological sampling; and real-world learning initiative to assist with water engineering projects and student experiential learning. The spatial information layers and physical infrastructure have been adopted by two specific yet diverse user groups with an interest in the long-term research focus of SERF.
Resumo:
Computer simulation has been widely accepted as an essential tool for the analysis of many engineering systems. It is nowadays perceived to be the most readily available and feasible means of evaluating operations in real railway systems. Based on practical experience and theoretical models developed in various applications, this paper describes the design of a general-purpose simulation system for train operations. Its prime objective is to provide a single comprehensive computer-aided engineering tool for most studies on railway operations so that various aspects of the railway systems with different operation characteristics can be investigated and analysed in depth. This system consists of three levels of simulation. The first is a single-train simulator calculating the running time of a train between specific points under different track geometry and traction conditions. The second is a dual-train simulator which is to find the minimum headway between two trains under different movement constraints, such as signalling systems. The third is a whole-system multi-train simulator which carries out process simulation of the real operation of a railway system according to a practical or planned train schedule or headway; and produces an overall evaluation of system performance.