868 resultados para Project management Computer programs
Resumo:
Recent information systems development using agile project management has yielded a 50% reduction in effort, together with significant improvements in organisational skills, productivity, quality and business satisfaction.
Resumo:
ROBERT EVAPORATORS in Australian sugar factories are traditionally constructed with 44.45 mm outside diameter stainless steel tubes of ~2 m length for all stages of evaporation. There are a few vessels with longer tubes (up to 2.8 m) and smaller and larger diameters (38.1 and 50.8 mm). Queensland University of Technology is undertaking a study to investigate the heat transfer performance of tubes of different lengths and diameters for the whole range of process conditions typically encountered in the evaporator set. Incorporation of these results into practical evaporator designs requires an understanding of the cost implications for constructing evaporator vessels with calandrias having tubes of different dimensions. Cost savings are expected for tubes of smaller diameter and longer length in terms of material, labour and installation costs in the factory. However these savings must be considered in terms of the heat transfer area requirements for the evaporation duty, which will likely be a function of the tube dimensions. In this paper a capital cost model is described which provides a relative cost of constructing and installing Robert evaporators of the same heating surface area but with different tube dimensions. Evaporators of 2000, 3000, 4000 and 5000 m2 are investigated. This model will be used in conjunction with the heat transfer efficiency data (when available) to determine the optimum tube dimensions for a new evaporator at a specified evaporation duty. Consideration is also given to other factors such as juice residence time (and implications for sucrose degradation and control) and droplet de-entrainment in evaporators of different tube dimensions.
Resumo:
FOR SUGAR factories with cogeneration plants major changes to the process stations have been undertaken to reduce the consumption of exhaust steam from the turbines and maximise the generated power. In many cases the process steam consumption has been reduced from greater than 52% on cane to ~40% on cane. The main changes have been to install additional evaporation area at the front of the set, operate the pan stages on vapour from No 1 or No 2 effects and undertake juice heating using vapour bleed from evaporators as far down the set as the penultimate stage. Operationally, one of the main challenges has been to develop a control system for the evaporators that addresses the objectives of juice processing rate (throughput) and steam economy, while producing syrup consistently at the required brix and providing an adequate and consistent vapour pressure for the pan stage operations. The cyclic demand for vapour by batch pans causes process disturbances through the evaporator set and these must be regulated in an effective manner to satisfy the above list of objectives for the evaporator station. The impact of the cyclic pan stage vapour demand has been modelled to define the impact on juice rate, steam economy, syrup brix and head space pressures in the evaporators. Experiences with the control schemes used at Pioneer and Rocky Point Mills are discussed. For each factory the paper provides information on (a) the control system used, the philosophy behind the control system and experiences in reaching the current system for control (b) the performance of the control system to handle the disturbances imposed by the pan stage and operate within other constraints of the factory (c) deficiencies in the current system and plans for further improvements. Other processing changes to boost the performance of the evaporators are also discussed.
Resumo:
In project management today, sustainability considerations are becoming increasingly necessary as an inclusion into project discovery, design and delivery phase methodologies. However, sustainability cannot always be tacked on to traditional project management approaches and still achieve the best project outcomes. Throw in the particular considerations for a culturally specific project, as for Aboriginal and Torres Strait Islander people, and the traditional project management approach is at risk of not meeting the needs of stakeholders or their engagement. In this presentation, we will briefly demonstrate how from beginning with sustainability considerations and integrating both project management principles and Aboriginal and Torres Strait Islander va lu es that QUT's Oodgeroo Unit is actioning a 'means to ends' integration approach for stakeholder engagement in two national Aboriginal and Torres Strait Islander projects. The iterative discovery and design of the federally Higher Education Participation and Partnerships Program (HEPPP) funded Aboriginal and Torres Strait Islander Higher Education Social Marketing Strategy (Strategy) and the Aboriginal and Torres Strait Islander Higher Education Portal (Portal) projects is being informed through a 'means' to 'ends' user- and design -led project management approach for inclusivity, visioning, and participation informing these projects for susta inable national deliverables. This approach draws upon the integration of Sustain ability Development Pillars and Project Management Pillars with the contextual lens of our proposed Aboriginal and Torres Strait Islander Pillars as the underpinning methodology of the Strategy and Portal Project's Communication and Collaboration Plan and approach with stakeholders. These th ree Pillars are integrated further through participatory consideration and inclu sion of comparative models: Daly's Sustainability Triangle, Walker's Object Design, Maslow's Hierarchy of Human Needs, Olsen's Four Layers of Communication,Project Management In stitute's (PMI's) Integrated Framework for Organisational Project Management, with the Aborig inal and Torres Strait Islander six core research ethics values. This presentation invites participants to join us in envisioning the 'ultimate means' of Environment, Del ivery and Sovereignty, through Economy, Design and Self-determination to the 'ultimate ends' of Social, Discove ry and Cultural Safety principles through stakeholder engagement.
Resumo:
Customer Relationship Management (CRM) packaged software has become a key contributor to attempts at aligning business and IT strategies in recent years. Throughout the 1990s there was, in many organisations strategies, a shift from the need to manage transactions and toward relationship management. Where Enterprise Resource Planning packages dominated the management of transactions era, CRM packages lead in regard to relationships. At present, balanced views of CRM packages are scantly presented instead relying on vendor rhetoric. This paper uses case study research to analyse some of the issues associated with CRM packages. These issues include the limitations of CRM packages, the need for a relationship orientation and the problems of a dominant management perspective of CRM. It is suggested that these issues could be more readily accommodated by organisational detachment from beliefs in IT as utopia, consideration of prior IS theory and practice and a more informed approach to CRM package selection.
Resumo:
Megaprojects are described as large, complex and expensive construction projects. Recent studies have shown that megaprojects often result in cost overruns, time extensions and undesired outcomes. Regardless, megaprojects are common, particularly in developing countries, as they are a trigger for social and economic development (Li et al., 2010). Since 2007, the Government of Ecuador has begun an unprecedent investment in infrastructure. Through the National Water Secretary, the government has 16 projects in agenda accounting for over $ 3 billion, with 6 projects currently under construction. These projects are considered flagship infrastructure in the endeavour to enhance the country´s productivity.The Bulubulu-Naranjal-Cañar project, a $406 million multi-purpose hydraulic project for irrigation and flood control, consists of over 1,000 activities and was proposed to be completed by 2015. This novel project for Ecuador, presented as a case study, represents a challenge for project management and financing. The purpose of this preliminary study is to provide an insight to megaproject management in Ecuador, and propose improvements to megaproject management through optimization of stochastic project schedules.
Resumo:
A recurring feature of modern practice is the stress placed on project professionals, with both debilitating effects on the people concerned and indirectly affecting project success. Cost estimation, for example, is an essential task for successful project management involving a high level of uncertainty. It is not surprising, therefore, that young cost estimators especially can become stressful at work due to a lack of experience and the heavy responsibilities involved. However, the concept of work stress and the associated underlying dimensions has not been clearly defined in extant studies in the construction management field. To redress this situation, an updated psychology perceived stress questionnaire (PSQ) , first developed by Levenstein et al (1993) and revised by Fliege et al (2005), is used to explore the dimensions of work stress with empirical evidence from the construction industry in China. With 145 reliable responses from young (less than 5 years’ experience) Chinese cost estimators, this study explores the internal dimensions of work stress, identifying four dimensions of tension, demands, lack of joy and worries. It is suggested that this four-dimensional structure may also be applicable in a more general context.
Resumo:
Our research examined how projects can draw together the fields of human resource management (HRM) and risk management (RM) to consider workforce-related risks on projects; particularly those with a large contingent workforce. It is argued that RM frameworks could be enhanced by a more comprehensive understanding of the specific potential non-technical “people risks” in projects. The study focussed on the Oil and Gas industry and undertook interviews with experts in the field. The findings are considered within the framework of key HRM areas; Management Practices, General Employment Practices, Staffing, HR Development, and Compensation and Benefits, along with Project Completion. Drawing together RM and HRM in a project environment, our research provides a unique opportunity to identify critical workforce-related risks. Such identification is the first step towards a more comprehensive approach to risk assessment and planning for mitigation of such risks in projects.
Resumo:
With the increase in complexity of engineering projects and design quality in the construction industry, the traditional two-dimensional "Information Island" approach to design is becoming less able to meet current design needs due to its lack of coordination and information sharing. Collaborative design using a Build Information Modeling (BIM) technology platform promises to provide an effective means of designing and communicating through networking and real-time data sharing. This paper first analyzes the shortcomings of the two-dimensional design process and the potential application of collaborative design. By combining the attributes of BIM, a preliminary BIM-based building design collaborative platform is developed to improve the design approach and support a more collaborative design process. A real-life case is presented to demonstrate the feasibility and validity of the platform and its use in practice. From this, it is shown that BIM has the potential to realize effective information sharing and reduce errors, thereby improving design quality. The BIM-based building design collaborative platform presented is expected to provide the support needed for the extensive application of BIM in collaborative design and promote a new attitude to project management.
Resumo:
Recent literature acknowledges the need for new career development models to support the way that careers evolve in the 21st century workplace (Bloch 2005). This is particularly so within temporary organisation forms, and for those pursuing a career in project management (Hölzle 2010). Our research, explores how project managers working on projects and within temporary organisation forms and those working on project-linked contracts access the development opportunities they require to remain employable in an era of project-by-project employment. Set in Australia where a project-based economy (Crawford, French and Lloyd-Walker 2013) and contract work have led to casualisation of the workforce (Connell & Burgess, 2006; McKeown & Hanley (2009) the results suggest new approaches to career development may be required.
Resumo:
The continuous changing impacts appeared in all solution understanding approaches in the projects management field (especially in the construction field of work) by adopting dynamic solution paths. The paper will define what argue to be a better relational model for project management constraints (time, cost, and scope). This new model will increase the success factors of any complex program / project. This is a qualitative research adopting a new avenue of investigation by following different approach of attributing project activities with social phenomena, and supporting phenomenon with field of observations rather than mathematical method by emerging solution from human, and ants' colonies successful practices. The results will show the correct approach of relation between the triple constraints considering the relation as multi agents system having specified communication channels based on agents locations. Information will be transferred between agents, and action would be taken based on constraint agents locations in the project structure allowing immediate changes abilities in order to overcome issues of over budget, behind schedule, and additional scope impact. This is complex adaptive system having self organizes technique, and cybernetic control. Resulted model can be used for improving existing project management methodologies.
Resumo:
Rapid urbanization in developing countries such as China has been creating unprecedented opportunities for the adoption of sustainable construction (SC). Owner, as a key driver of urbanization, plays an influential role for other stakeholders to undertake SC practices. However, lacking their demands and requirements of owners were regarded as the main barriers for the adoption of SC. Notwithstanding the diversity of previous studies on the barriers to SC, there is a dearth of research from the owner’s perspective. This paper presents an empirical study identifying the critical factors impeding the adoption of SC from the owners’ point of view. A list of 25 factors was preliminarily identified through extensive literature review and interviews with industry professionals. This was followed by a questionnaire survey to collect owners’ opinions on the relative importance of these factors. Using factor analysis, seven most critical factors are identified, namely, economic feasibility, awareness, support from project stakeholders, legislation and regulation, operability of SC, resource risk, and project management model. The research findings show that economic feasibility, awareness, legislation and regulation are the most important factors impeding owners in adopting SC practices. This implied that the government plays a vital role in removing the barriers impeding the greater adoption of SC by building owners in China. This is helpful for a transition to the low carbon urbanization.
Resumo:
The quality of environmental decisions are gauged according to the management objectives of a conservation project. Management objectives are generally about maximising some quantifiable measure of system benefit, for instance population growth rate. They can also be defined in terms of learning about the system in question, in such a case actions would be chosen that maximise knowledge gain, for instance in experimental management sites. Learning about a system can also take place when managing practically. The adaptive management framework (Walters 1986) formally acknowledges this fact by evaluating learning in terms of how it will improve management of the system and therefore future system benefit. This is taken into account when ranking actions using stochastic dynamic programming (SDP). However, the benefits of any management action lie on a spectrum from pure system benefit, when there is nothing to be learned about the system, to pure knowledge gain. The current adaptive management framework does not permit management objectives to evaluate actions over the full range of this spectrum. By evaluating knowledge gain in units distinct to future system benefit this whole spectrum of management objectives can be unlocked. This paper outlines six decision making policies that differ across the spectrum of pure system benefit through to pure learning. The extensions to adaptive management presented allow specification of the relative importance of learning compared to system benefit in management objectives. Such an extension means practitioners can be more specific in the construction of conservation project objectives and be able to create policies for experimental management sites in the same framework as practical management sites.
Resumo:
While the growth in the number of IT investments remains strong, research in the IT investment field is limited, resulting in suboptimal practical guidance on effectively governing IT investments. Based on resource-based theory, this paper reports the initial work involved in developing a construct names IT investment governance (ITIG), because it can be used to measure organizations' capability to govern their IT investments. This paper then empirically examines the association of ITIG and corporate performance. The preliminary result is a four-factor, 16-item instrument for assessing the ITIG construct. This method's factors are IT investment value governance, IT investment value monitoring, IT investment appraisals and IT investment project management. The impact of ITIG on corporate performance was demonstrated with a significant and positive relationship found to exist between the ITIG construct and corporate performance, thus supporting the effectiveness of the ITIG construct. Corporations with higher levels of ITIG capability are more likely to maximize the contribution of their IT investments to firm value.