Time and cost overruns of industrial projects in kerala


Autoria(s): Suresh, V N; Dr.Wilson, P R
Data(s)

28/03/2014

28/03/2014

01/06/2000

Resumo

Poor project planning, implementation and control and the subsequent cost and time overruns are ubiquitous features that have been posing serious concern at all levels - state, national and international. It results in wastage of the nation's scarce resources and retards the socio-economic progress. Although several studies peripheral on project overruns have been made at the national level, no serious attempt has been made at the state level to identify the magnitude of overruns, their causes and impacts on industrial projects. The present study "Time and Cost Overruns of Industrial Projects in Kerala" is an earnest attempt to probe in depth the time and cost overruns and their impact on industrial projects. The study places emphasise on the identification of the real reasons behind the cost and time overruns. It also covers the present project management practices of industrial projects in Kerala.

School of management studies, Cochin University of Science And Technology

Cochin University of Science And Technology

Identificador

http://dyuthi.cusat.ac.in/purl/3423

Idioma(s)

en

Publicador

Cochin University of Science And Technology

Palavras-Chave #Industrial projects #Time overrun #Cost estimate #Project
Tipo

Thesis