953 resultados para portfolio management process
Resumo:
The goal of this study is to create a new inventory valuation process for The Switch Drive Systems and to improve its inventory management practices. In the matter of inventories the main problems in the case company are that it doesn’t have consistent valuation methods throughout the company and that information received in ERP system isn’t trustful. The research is qualitative case study. The empirical data is gathered through observing and unstructured interviews. The research shows that material flow process and the inventory valuation must be divided and handled separately but they should interact with each other. The result is a new inventory valuation process which takes many factors of material process under the consideration in order to receive reliable value for inventories.
Resumo:
Presentation at Open Repositories 2013, DSpace User Group, on 12.7.2013 in Charlottetown, PEI, Canada
Resumo:
The purpose of the thesis is to classify suppliers and to enhance strategic purchasing in the case company. Supplier classification is conducted to fulfill the requirements of the company quality manual and international quality standards. To gain more benefit, a strategic purchasing tool, Kraljic’s purchasing portfolio and analytical hierarchy process are utilized for the base of supplier classification. Purchasing portfolio is used to give quick and easy visual insight on product group management form the viewpoint of purchasing. From the base on purchasing portfolio alternative purchasing and supplier strategies can be formed that enhance the strategic orientation of purchasing. Thus purchasing portfolio forces the company to orient on proactive and strategic purchasing. As a result a survey method for implementing purchasing portfolio in the company is developed that exploits analytical hierarchy process. Experts from the company appoint the categorization criteria and in addition, participate in the survey to categorize product groups on the portfolio. Alternative purchasing strategies are formed. Suppliers are classified depending on the importance and characteristics of the product groups supplied.
Resumo:
The concept of Process Management has been used by managers and consultants that search for the improvement of both operational or managerial industrial processes. Its strength is in focusing on the external client and on the optimization of the internal process in order to fulfill their needs. By the time the needs of internal clients are being sought, a set of improvements takes place. The Taguchi method, because of its claim for knowledge share between design engineers and people engaged in the process, is a candidate for process management implementation. The objective of this paper is to propose that kind of application aiming for improvements related with reliability of results revealed by the robust design of Taguchi method.
Resumo:
The aim of this thesis was to develop the category planning process in the case company operating in construction industry. As the interest in the field of research has just recently started to emerge towards the benefits of category management and planning, the theoretical background was derived from literature of subjects with a relation to category planning i.e. procurement strategy, purchasing portfolio model, information flow management and cost analysis. The background for the development of category planning process was derived from retail industry, to where the category planning is more researched. The empirical study was executed with mixed method approach: quantitative data of the categories was analyzed and qualitative data was gathered through semi-structured interview and discussions within the case company. As a result, the category planning process was critically analyzed and development proposals addressed for improving the process description. Additionally a tool was developed based on the empirical study to support the category planning process of the case company.
Resumo:
The aim of this thesis is to search how to match the demand and supply effectively in industrial and project-oriented business environment. The demand-supply balancing process is searched through three different phases: the demand planning and forecasting, synchronization of demand and supply and measurement of the results. The thesis contains a single case study that has been implemented in a company called Outotec. In the case study the demand is planned and forecasted with qualitative (judgmental) forecasting method. The quantitative forecasting methods are searched further to support the demand forecast and long term planning. The sales and operations planning process is used in the synchronization of the demand and supply. The demand forecast is applied in the management of a supply chain of critical unit of elemental analyzer. Different meters on operational and strategic level are proposed for the measurement of performance.
Resumo:
The case company in this study is a large industrial engineering company whose business is largely based on delivering a wide-range of engineering projects. The aim of this study is to create and develop a fairly simple Excel-based tool for the sales department. The tool’s main function is to estimate and visualize the profitability of various small projects. The study also aims to find out other possible and more long-term solutions for tackling the problem in the future. The study is highly constructive and descriptive as it focuses on the development task and in the creation of a new operating model. The developed tool focuses on estimating the profitability of the small orders of the selected project portfolio currently on the bidding-phase (prospects) and will help the case company in the monthly reporting of sales figures. The tool will analyse the profitability of a certain project by calculating its fixed and variable costs, then further the gross margin and operating profit. The bidding phase of small project is a phase that has not been covered fully by the existing tools within the case company. The project portfolio tool can be taken into use immediately within the case company and it will provide fairly accurate estimate of the profitability figures of the recently sold small projects.
Resumo:
The Finnish legislation requires for a safe and secure learning environment. However, the comprehensive, risk based safety and security management (SSM) and the management commitment in the implementation and development of the SSM are not mentioned in the legislation. Multiple institutions, operators and researchers have studied and developed safety and security in educational institutions over the past decade. Typically the approach has been fragmented and without bringing up the importance of the comprehensive SSM. The development needs of the safety and security operations in universities have been studied. However, in universities of applied sciences (UASs) and in elementary schools (ESs), the performance level, strengths and weaknesses of the comprehensive SSM have not been studied. The objective of this study was to develop the comprehensive, risk based SSM of educational institutions by developing the new Asteri consultative auditing process and study its effects on auditees. Furthermore, the performance level in the comprehensive SSM in UASs and ESs were studied using Asteri and the TUTOR model developed by the Keski-Uusimaa Department for Rescue Services. In addition, strengths, development needs and differences were identified. In total, 76 educational institutions were audited between the years 2011 and 2014. The study is based on logical empiricism, and an observational applied research design was used. Auditing, observation and an electronic survey were used for data collection. Statistical analysis was used to analyze the collected information. In addition, thematic analysis was used to analyze the development areas of the organizations mentioned by the respondents in the survey. As one of the main contributions, this research presents the new Asteri consultative auditing process. Organizations with low performance levels on the audited subject benefit the most from the Asteri consultative auditing process. Asteri may be usable in many different types of audits, not only in SSM audits. As a new result, this study provides new knowledge on attitudes related to auditing. According to the research findings, auditing may generate negative attitudes and the auditor should take them into account when planning and preparing for audits. Negative attitudes can be compensated by producing added value, objectivity and positivity for the audit and, thus, improve the positive effects of auditing on knowledge and skills. Moreover, as the results of this study shows, auditing safety and security issues do not increase feelings of insecurity, but rather increase feelings of safety and security when using the new Asteri consultative auditing process with the TUTOR model. The results showed that the SSM in the audited UASs was statistically significantly more advanced than that in the audited ESs. However, there is still room for improvement in the ESs and the UASs as the approach to the SSM was fragmented. It can be assumed that the majority of Finnish UASs and ESs do not likely meet the basic level of the comprehensive, risk based the SSM.
Resumo:
The objective of this research is to create a current state analysis of pulp supply chain processes from production planning to deliveries to customers. A cross-functional flowchart is being used to model these processes. These models help finding key performance indicators (KPIs) which enable examinations of the supply chain efficiency. Supply chain measures in different processes reveal the changes need processes that affect the whole supply chain and its efficiency and competitiveness. Structure of pulp supply chain differs from most of the other supply chains. The fact that there are big volumes of bulk products, small product variations and supply forecasts are made for the year ahead make the difference. This factor brings different benefits but also challenges when developing supply chain. This thesis divides pulp supply chain in three different main categories: production planning, warehousing and transportation. It provides tools for estimating the functionality of supply chain as well as developing the efficiency for different functions of supply chain. By having a better understanding of supply chain processes and measurement the whole supply chain structure can be developed significantly.