875 resultados para Graphic design Project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The QUT Team developed an idea for a new residential housing typology that is appropriate for sites where the best views are in the opposing direction to the preferable climatic orientation. The interlocking configuration creates a double height external living space in every apartment, creating further opportunities for cross ventilation and natural daylight. Unlike conventional double loaded housing typologies, the interlocking configuration only requires a continuous public circulation corridor every second level. The cores that service this corridor are separated to either end of the tower and open areas. The configuration of the interlocking apartments creates an interesting composition of solid and void when viewed externally. This undulating facade petternation assists in articulating the large building mass. The project was evaluated by independent consultants and found to be cost effective, and at the same time delivering energy efficient high density liveability. The project was presented to a meeting of the Australian Council on Tall Buildings seminar on 15 September 2010.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, an ‘ecological’ lens is applied to an independent living project aiming to provide ‘homes for life’ for adult children with disabilities. The qualities of the project as ecological praxis are highlighted along with the implications for an open-ended enquiry into ecologies for and of the interior. In terms of the ecological concern for intimate modes of being, interior design is shown to be well placed through its association with environments in which people spend most of their life and through powerful concepts such as ‘interiority’ and ‘home’ which link to fundamental existential notions of ‘self ’ and ‘identity’. However, despite the interior being a significant generative force, this has not happened to the exclusion of other disciplines. Ignoring territorial urges to claim areas and concepts as one’s own, the paper describes how the project has actively encouraged design disciplines to trespass in each other’s territories. Ecologies for and of the interior, while recognising the need for discipline emphasis, also demand an integrated and collective approach through what is in effect transdisciplinary practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Selecting an appropriate design-builder is critical to the success of DB projects. The objective of this study is to identify selection criteria for design-builders and compare their relative importance by means of a robust content analysis of 94 Request For Proposals (RFPs) for public DB projects. These DB projects had an aggregate contract value of over US$3.5 billion and were advertised between 2000 and 2010. This study summarized twenty-six selection criteria and classified into ten categories, i.e.: price, experience, technical approach, management approach, qualification, schedule, past performance, financial capability, responsiveness to the RFP, and legal status in descending order of their relative importance. The results showed that even though price still remains as the most important selection category, its relative importance declines significantly in the last decade. The categories of qualification, experience, past performance, by contrast, have been becoming more important to DB owners for selecting design-builders. Finally, it is found that the importance weighting of price in large projects is significantly higher than that in small projects. This study provides a useful reference for owners in selecting their preferred design-builders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The two-phrase best-value process has been widely used by public agencies for Design and Build (DB) procurement, with a key issue in the first phase of pre-qualification being the determination of evaluation criteria. This study identified a set of general qualification criteria for design-builders and compares their relative importance by a thorough content analysis of 97 Requests for Qualification (RFQ) for public DB projects advertised between 2000 and 2011 in various regions of the USA. The thirty-nine qualification criteria found are summarized and classified into eight categories comprising: experience; project understanding and approach; organizational structure and capacity; past performance record; professional qualifications; responsiveness to RFQs, office location and familiarity with local environment; and legal status in descending order of their relative importance. A comparative analysis of different types of projects shows that the relative weightings of the qualification criteria vary according to different characteristics of the DB projects involved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The design-build (DB) system has been demonstrated as an effective delivery method and has gained popularity worldwide. However it is observed that a number of operational variations of DB system have emerged since the last decade to cater for different client’s requirements. After the client decides to procure his project through the DB system, he still has to choose an appropriate configuration to deliver their projects optimally. However, there is little research on the selection of DB operational variations. One of the main reasons for this is the lack of evaluation criteria for determining the appropriateness of each operational variation. To obtain such criteria, a three-round Delphi survey has been conducted with 20 construction experts in the People’s Republic of China (PRC). Seven top selection criteria were identified. These are: (1) availability of competent design-builders; (2) client’s capabilities; (3) project complexity; (4) client’s control of project; (5) early commencement & short duration; (6) reduced responsibility or involvement; and (7) clearly defined end user’s requirements. These selection criteria were found to have a statistically significant agreement. These findings may furnish various stakeholders, DB clients in particular, with better insight to understand and compare the different operational variations of the DB system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many academic researchers have conducted studies on the selection of design-build (DB) delivery method; however, there are few studies on the selection of DB operational variations, which poses challenges to many clients. The selection of DB operational variation is a multi-criteria decision making process that requires clients to objectively evaluate the performance of each DB operational variation with reference to the selection criteria. This evaluation process is often characterized by subjectivity and uncertainty. In order to resolve this deficiency, the current investigation aimed to establish a fuzzy multicriteria decision-making (FMCDM) model for selecting the most suitable DB operational variation. A three-round Delphi questionnaire survey was conducted to identify the selection criteria and their relative importance. A fuzzy set theory approach, namely the modified horizontal approach with the bisector error method, was applied to establish the fuzzy membership functions, which enables clients to perform quantitative calculations on the performance of each DB operational variation. The FMCDM was developed using the weighted mean method to aggregate the overall performance of DB operational variations with regard to the selection criteria. The proposed FMCDM model enables clients to perform quantitative calculations in a fuzzy decision-making environment and provides a useful tool to cope with different project attributes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose-- DB clients play a vital role in the delivery of DB system and the clients’ competences are critical to the success of DB projects. Most of DB clients, however, remain inexperienced with the DB system. This study, therefore, aims to identify the key competences that DB clients should possess to ensure the success of DB projects in the construction market of China. Design/Methodology/Approach -- Five semi-structured face-to-face interviews and two rounds Delphi questionnaire survey were conducted in the construction market of China to identify the key competences of DB clients. Rankings have been assigned to these key competences on the basis of their relative importance. Findings-- Six ranked key competences of DB clients have been identified, which are, namely, (1) the ability to clearly define project scope and objectives; (2) financial capacity for the projects; (3) capacity in contract management; (4) adequate staff or consulting team; (5) effective coordination with DB contractors and (6) experience with similar design-build projects. Calculation of Kendall’s Coefficient of Concordance (W) indicates a statistically significant consensus of panel experts on these top six key competences. Practical implications—Clients should clearly understand the competence requirements in DB projects and should assess their DB capability before going for the DB option. Originality/Value-- The examination of DB client’s key competences will help the client deepen the understanding of the DB system. DB clients can also make use of the research findings as guidelines to improve their DB competence.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Design-Build (DB) system has been widely adopted overseas but it has not received the same popularity yet in the People’s Republic of China. The selection of design-build variant is regarded as one of the critical obstacles to the application of this alternative. This paper investigates categories of design-build variants in the construction market of China. The develop-and-construction, enhanced design-build, traditional-design-build and engineering procurement-construction (EPC) are the four current designbuild variants adopted by clients. Each of them is developed to meet a varying set of circumstances and has its own advantages and disadvantages. The develop-and-construction is mostly used in large, complex projects in housing industry and it will guarantee client’s great control over the project while still leave some design room for the contractor. The traditional-design-build and enhanced-design-build systems are mostly applied in projects that are comparatively simple, small-scale, and the DB contractors will have greater control of the projects. The EPC is the extension of pure design-build method and is widely adopted in the petrochemical, metallurgical and electronic fields because of the high-technique requirements and the necessity for one entity to control the design, construction, procurement and commissioning etc. Four corresponding design-build projects are also presented in this paper in order to better illustrate the operational process and provide the insight for understanding the design-build variants in Mainland China.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Video is commonly used as a method for recording embodied interaction for purposes of analysis and design and has been proposed as a useful ‘material’ for interaction designers to engage with. But video is not a straight forward reproduction of embodied activity – in themselves video recordings ‘flatten’ the space of embodied interaction, they impose a perspective on unfolding action, and remove the embodied spatial and social context within which embodied interaction unfolds. This does not mean that video is not a useful medium with which to engage as part of a process of investigating and designing for embodied interaction – but crucially, it requires that as people attempting to engage with video, designers own bodies and bodily understandings must be engaged with and brought into play. This paper describes and reflects upon our experiences of engaging with video in two different activities as part of a larger research project investigating the design of gestural interfaces for a dental surgery context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Although the design-build (DB) system has been demonstrated to be an effective delivery method and has gained popularity worldwide, it has not gained the same popularity in the construction market of China. The objective of this study was, theretofore, to investigate the barriers to entry in the DB market. A total of 22 entry barriers were first identified through an open-ended questionnaire survey with 15 top construction professionals in the construction market of China. A broad questionnaire survey was further conducted to prioritize these entry barriers. Statistical analysis of responses shows that the most dominant barriers to entry into the DB market are, namely, lack of design expertise, lack of interest from owners, lack of suitable organization structure, lack of DB specialists, and lack of credit record system. Analysis of variance indicates that there is no difference of opinions among the respondent groups of academia, government departments, state-owned company, and private company, at the 5% significance level, on most of the barriers to entry. Finally, the underlying dimensions of barriers to entry in the DB market were investigated through factor analysis. The results indicate that there are six major underlying dimensions of entry barriers in DB market, which include, namely, the competence of design-builders, difficulty in project procurement, characteristics of DB projects, lack of support from public sectors, the competence of DB owners, and the immaturity of DB market. These findings are useful for both potential and incumbent design-builders to understand and analyze the DB market in China.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide of a review of the theory and models underlying project management (PM) research degrees that encourage reflective learning. Design/methodology/approach – Review of the literature and reflection on the practice of being actively involved in conducting and supervising academic research and disseminating academic output. The paper argues the case for the potential usefulness of reflective academic research to PM practitioners. It also highlights theoretical drivers of and barriers to reflective academic research by PM practitioners. Findings – A reflective learning approach to research can drive practical results though it requires a great deal of commitment and support by both academic and industry partners. Practical implications – This paper suggests how PM practitioners can engage in academic research that has practical outcomes and how to be more effective at disseminating these research outcomes. Originality/value – Advanced academic degrees, in particular those completed by PM practitioners, can validate a valuable source of innovative ideas and approaches that should be more quickly absorbed into the PM profession’s sources of knowledge. The value of this paper is to critically review and facilitate a reduced adaptation time for implementation of useful reflective academic research to industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to present a cost-benefit interpretation of academic-practitioner research by describing and analysing several recent relevant examples of academic-practitioner research with a focus on doctoral theses carried out at universities and business schools in clusters of research centred in North America, Australia and Europe. Design/methodology/approach – Using case study examples, a value proposition framework for undertaking collaborative research for higher degree level study is developed and presented. Findings – Value proposition benefits from this level of collaborative research can be summarised as enhancing competencies at the individual and organisational level as well as providing participating universities with high-quality candidates/students and opportunities for industry engagement. The project management (PM) professional bodies can also extend PM knowledge but they need to be prepared to provide active support. Practical implications – A model for better defining the value proposition of collaborative research from a range of stakeholder perspectives is offered that can be adapted for researchers and industry research sponsors. Originality/value – Few papers offer a value proposition framework for explaining collaborative research benefits. This paper addresses that need.