994 resultados para Portfolio strategy


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Facing with the difficulty in information propagation and synthesizing from conceptual to embodiment design, this paper introduces a function-oriented, axiom based conceptual modeling scheme. Default logic reasoning is exploited for recognition and reconstitution of conceptual product geometric and topological information. The proposed product modeling system and reasoning approach testify a methodology of "structural variation design", which is verified in the implementation of a GPAL (Green Product All Life-cycle) CAD system. The GPAL system includes major enhancement modules of a mechanism layout sketching method based on fuzzy logic, a knowledge-based function-to-form mapping mechanism and conceptual form reconstitution paradigm based on default geometric reasoning. A mechanical hand design example shows a more than 20 times increase in design efficacy with these enhancement modules in the GPAL system on a general 3D CAD platform.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The chapter will set out to explain the KBUD and urban policy making processes in Queensland, Australia. This chapter will draw on providing a clear understanding on policy frameworks and relevant ICT applications of the Queensland ‘Smart State’ experience. The chapter is consisted of six sections. The first section following the introduction provides background information. The second section focuses on the KBUD processes in Queensland. The third section offers a comprehensive analysis of the ‘Queensland Smart State’ initiative, and it also identifies actors and goals of the agenda of Smart State experience. The fourth section reviews knowledge based development and ICT applications and policies of the Queensland Smart State and Brisbane Smart City experiences, and their impacts on Brisbane’s successful KBUD. The fifth section discusses knowledge hubs and ICT developments within the Brisbane metropolitan area. Then the chapter concludes with future trends and conclusion sections.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study is to demonstrate the appropriateness of “Japanese Manufacturing Management” (JMM) strategies in the Asian, ASEAN and Australasian automotive sectors. Secondly, the study assessed JMM as a prompt, effective and efficient global manufacturing management practice for automotive manufacturing companies to learn; benchmark for best practice; acquire product and process innovation, and enhance their capabilities and capacities. In this study, the philosophies, systems and tools that have been adopted in various automotive manufacturing assembly plants and their tier 1 suppliers in the three Regions were examined. A number of top to middle managers in these companies were located in Thailand, Indonesia, Malaysia, Singapore, Philippines, Viet Nam, and Australia and were interviewed by using a qualitative methodology. The results confirmed that the six pillars of JMM (culture change, quality at shop floor, consensus, incremental continual improvement, benchmarking, and backward-forward integration) are key enablers to success in adopting JMM in both automotive and other manufacturing sectors in the three Regions. The analysis and on-site interviews identified a number of recommendations that were validated by the automotive manufacturing company’s managers as the most functional JMM strategies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.