Determination of Optimal Preventive Maintenance Strategy for Serial Production Lines


Autoria(s): Ma, Lin; Mathew, Joseph; Sun, Yong
Contribuinte(s)

Mathew, J

Kennedy, J

Ma, L

Tan, A

Anderson, D

Data(s)

2006

Identificador

http://eprints.qut.edu.au/24266/

Publicador

Springer-Verlag London Ltd

Relação

Ma, Lin, Mathew, Joseph, & Sun, Yong (2006) Determination of Optimal Preventive Maintenance Strategy for Serial Production Lines. In Mathew, J, Kennedy, J, Ma, L, Tan, A, & Anderson, D (Eds.) Proceedings of the 1st World Congress on Engineering Asset Management (WCEAM), 11- 14 July 2006, Australia, Queensland, Gold Coast.

Fonte

Faculty of Built Environment and Engineering; School of Engineering Systems

Palavras-Chave #091399 Mechanical Engineering not elsewhere classified #099999 Engineering not elsewhere classified #Preventive Maintenance, Planning, Decision Making, Production Lines, Split System Approach
Tipo

Conference Paper