968 resultados para 290804 Construction Engineering
Resumo:
Noncompetitive bids have recently become a major concern in both public and private sector construction contract auctions. Consequently, several models have been developed to help identify bidders potentially involved in collusive practices. However, most of these models require complex calculations and extensive information that is difficult to obtain. The aim of this paper is to utilize recent developments for detecting abnormal bids in capped auctions (auctions with an upper bid limit set by the auctioner) and extend them to the more conventional uncapped auctions (where no such limits are set). To accomplish this, a new method is developed for estimating the values of bid distribution supports by using the solution to what has become known as the German Tank problem. The model is then demonstrated and tested on a sample of real construction bid data, and shown to detect cover bids with high accuracy. This paper contributes to an improved understanding of abnormal bid behavior as an aid to detecting and monitoring potential collusive bid practices.
Resumo:
This paper examines the extent to which engineers can influence the competitive behavior of bidders in Best Value or multi-attribute construction auctions, where both the (dollar) bid and technical non-price criteria are scored according to a scoring rule. From a sample of Spanish construction auctions with a variety of bid scoring rules, it is found that bidders are influenced by the auction rules in significant and predictable ways. The bid score weighting, bid scoring formula and abnormally low bid criterion are variables likely to influence the competitiveness of bidders in terms of both their aggressive/conservative bidding and concentration/dispersion of bids. Revealing the influence of the bid scoring rules and their magnitude on bidders’ competitive behavior opens the door for the engineer to condition bidder competitive behavior in such a way as to provide the balance needed to achieve the owner’s desired strategic outcomes.
Resumo:
The requirements for edge protection systems on most sloped work surfaces (class C, according to EN 13374-2013 code) in construction works are studied in this paper. Maximum deceleration suffered by a falling body and maximum deflection of the protection system were analyzed through finite-element models and confirmed through full-scale experiments. The aim of this work is to determine which value for deflection system entails a safe deceleration for the human body. This value is compared with the requirements given by the current version of EN 13374-2013. An additional series of experiments were done to determine the acceleration linked to minimum deflection required by code (200 mm) during the retention process. According to the obtained results, a modification of this value is recommended. Additionally, a simple design formula for this falling protection system is proposed as a quick tool for the initial steps of design.
Resumo:
The safety of workers in nighttime roadway work zones has become a major concern for state transportation agencies due to the increase in the number of work zone fatalities. During the last decade, several studies have focused on the improvement of safety in nighttime roadway work zones; but the element that is still missing is a set of tools for translating the research results into practice. This paper discusses: 1) the importance of translating the research results related to the safety of workers and safety planning of nighttime work zones into practice, and 2) examples of tools that can be used for translating the results of such studies into practice. A tool that can propose safety recommendations in nighttime work zones and a web-based safety training tool for workers are presented in this paper. The tools were created as a component of a five-year research study on the assessment of the safety of nighttime roadway construction. The objectives of both tools are explained as well as their functionalities (i.e., what the tools can do for the users); their components (e.g., knowledge base, database, and interfaces); and their structures (i.e., how the components of the tools are organized to meet the objectives). Evaluations by the proposed users of each tool are also presented.
Resumo:
Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this. In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.
Resumo:
Non-Destructive Testing (NDT) of deep foundations has become an integral part of the industry’s standard manufacturing processes. It is not unusual for the evaluation of the integrity of the concrete to include the measurement of ultrasonic wave speeds. Numerous methods have been proposed that use the propagation speed of ultrasonic waves to check the integrity of concrete for drilled shaft foundations. All such methods evaluate the integrity of the concrete inside the cage and between the access tubes. The integrity of the concrete outside the cage remains to be considered to determine the location of the border between the concrete and the soil in order to obtain the diameter of the drilled shaft. It is also economic to devise a methodology to obtain the diameter of the drilled shaft using the Cross-Hole Sonic Logging system (CSL). Performing such a methodology using the CSL and following the CSL tests is performed and used to check the integrity of the inside concrete, thus allowing the determination of the drilled shaft diameter without having to set up another NDT device. This proposed new method is based on the installation of galvanized tubes outside the shaft across from each inside tube, and performing the CSL test between the inside and outside tubes. From the performed experimental work a model is developed to evaluate the relationship between the thickness of concrete and the ultrasonic wave properties using signal processing. The experimental results show that there is a direct correlation between concrete thicknesses outside the cage and maximum amplitude of the received signal obtained from frequency domain data. This study demonstrates how this new method to measuring the diameter of drilled shafts during construction using a NDT method overcomes the limitations of currently-used methods. In the other part of study, a new method is proposed to visualize and quantify the extent and location of the defects. It is based on a color change in the frequency amplitude of the signal recorded by the receiver probe in the location of defects and it is called Frequency Tomography Analysis (FTA). Time-domain data is transferred to frequency-domain data of the signals propagated between tubes using Fast Fourier Transform (FFT). Then, distribution of the FTA will be evaluated. This method is employed after CSL has determined the high probability of an anomaly in a given area and is applied to improve location accuracy and to further characterize the feature. The technique has a very good resolution and clarifies the exact depth location of any void or defect through the length of the drilled shaft for the voids inside the cage. The last part of study also evaluates the effect of voids inside and outside the reinforcement cage and corrosion in the longitudinal bars on the strength and axial load capacity of drilled shafts. The objective is to quantify the extent of loss in axial strength and stiffness of drilled shafts due to presence of different types of symmetric voids and corrosion throughout their lengths.
Resumo:
This paper features a tool to carry out environmental performance evaluation in highway rehabilitation works, as a component of environmental supervision activities. The procedure involves (i) evidence gathering by conducting technical inspections and reviewing environmental compliance reports, (ii) ranking nonconformities according to a proposed weighting framework, and (iii) calculation of an environmental conformity index. For the sake of testing and calibration, the procedure was applied to five road segments that were submitted to rehabilitation works in Sao Paulo State and the results were treated qualitatively.
Resumo:
This Plan Reading Course was developed by the Department of Civil and Construction Engineering of Iowa State University under contract with the Iowa Highway Research Board, Project HR-324. It is intended to be an instructional tool for Iowa DOT, county and municipal employees within the state of Iowa. Under this contract, a previous Plan Reading Course, prepared for the Iowa State Highway Commission in 1965, has been completely revised using a new format, new plans, updated specifications, and new material. This course is a self-taught course consisting of two parts; Highway Plans, and Bridge and Culvert plans. Each part consists of a self-instruction book, a set of plans, a question booklet, and an answer booklet. This is the self-instruction book for the Bridge and Culvert Plans part of the course. The example structures included in this part of the course are a prestressed concrete beam bridge and a reinforced concrete box culvert.
Resumo:
This booklet is part of the Bridge Plan Reading Course developed by the Department of Civil and Construction Engineering of Iowa State University under contract with the Highway Research Advisory Board, Project HR-324. It is intended to be an instructional tool for Iowa DOT and county and municipal employees within the state of Iowa. The questions in this booklet are designed to test your knowledge of the material in the Bridge Plan Reading Course. You are free to use both the plans and the text material to assist you in answering these questions. There is a separate ANSWER BOOKLET which contains the answers to these questions. Consult that booklet to make sure you have answered these questions correctly. If you miss the answer to a question, go back and review the text material and the plans to make sure you understand the correct answer.
Resumo:
Project management has evolved in recent decades. Project portfolio management, together with multi project management, is an emerging area in the project management field in practice, and correspondingly in academic research and forums. In multi project management, projects cannot be handled isolated from each other, as they often have interdependencies that have to be taken into account. If the interdependencies between projects are evaluated during the selection process, the success rate of the project portfolio is increased. Interdependencies can be human resources, technological, and/or market based. Despite of the fact that interdependency as a phenomenon has roots in the 1960s and is related to famous management theories, it has not been much studied, although in practice most companies use it to great extent. There exists some research on interdependency, but prior publications have not emphasized the phenomenon per se, because a practical orientation practitioner techniques prevails in the literature. This research applies the method triangulation, electronic surveys and multiple case study. The research concentrates on small to large companies in Estonia and Finland, mainly in construction, engineering, ICT, and machinery industries. The literature review reveals that interdependencies are deeply involved in R&D and innovation. Survey analysis shows that companies are aware of interdependency issues in general, but they i have lack of detailed knowledge to use it thoroughly. Empirical evidence also indicates that interdependency techniques influence the success rate and other efficiency aspects to different extents. There are a lot of similarities in interdependency related managerial issues in companies of varying sizes and countries in Northern Europe. Differences found in the study are for instance the fact that smaller companies face more difficulties in implementing and evaluating interdependency procedures. Country differences between Estonia and Finland stem from working solutions to manage interdependencies on a daily basis.historical and cultural reasons, such as the special features of a transition country compared to a mature country. An overview of the dominant problems, best practices, and commonly used techniques associated with interdependency is provided in the study. Empirical findings show that many interdependency techniques are not used in practice. A multiple case study was performed in the study to find out how interdependencies are managed in real life on a daily basis. The results show that interdependencies are mostly managed in an informal manner. A description of managing the interdependencies and implementation procedures is given. Interdependency procedures are hard to implement, especially in smaller companies. Companies have difficulties in implementing interdependency procedures and evaluating them. The study contains detailed results on how companies have implemented working solutions to manage interdependencies on a daily basis
Resumo:
Durante la crisis financiera global de 2008 muchas organizaciones y mercados financieros tuvieron que terminar sus operaciones o replantearlas debido a los choques que golpearon el bienestar de sus empresas. A pesar de esta grave situación, en la actualidad se pueden encontrar empresas que se recuperaron y salieron del terrible panorama que les presentó la crisis, incluso encontrando nuevas oportunidades de negocio y fortaleciendo su futuro. Esta capacidad que algunas organizaciones tuvieron y que permitió su salida victoriosa de la crisis se denomina resiliencia, la cual es la capacidad de sobreponerse a los efectos negativos de choques internos o externos (Briguglio, Cordina, Farrugia & Vella 2009). Por tanto en el presente trabajo se estudiará esta capacidad tanto en la organización como en los líderes para hallar factores que mejoren el desempeño de las empresas en crisis como la que ocurrió en el 2008 – 2009. Primero se realizará un estudio sobre los sucesos y el desarrollo de la crisis subprime del año 2008 para tener un entendimiento claro de sus antecedentes, desarrollo, magnitud y consecuencias. Posteriormente se realizará un estudio profundo sobre la teoría de la resiliencia organizacional y la resiliencia en el líder como individuo y los estilos de liderazgo. Finalmente teniendo un sustento teórico tanto de la crisis como del concepto de resiliencia se tomarán casos de estudio de empresas que lograron perdurar en la crisis financiera del 2008 y empresas que no lograron sobrevivir para posteriormente hallar características del líder y del liderazgo que puedan aumentar o afectar la capacidad de resiliencia de las organizaciones con el objetivo de brindar herramientas a los líderes actuales para que manejen de forma eficiente y eficaz las empresas en un mundo complejo y variable como el actual.
Resumo:
El presente documento hace un análisis de la influencia que ejercen los diferentes tipos de liderazgo, carismático y transaccional, de un directivo de una organización sobre los subordinados de la misma, que a su vez afecta positiva o negativamente el nivel de resiliencia de los mismos. De la misma forma, se ha identificado la relación que existe entre el nivel de resiliencia de los subordinados de una organización y el cumplimiento de objetivos corporativos de la misma. Todo lo anterior se justifica en la economía globalizada de la que ahora hacemos parte que obliga a las empresas a generar nuevas estrategias de competitividad dentro de ambientes turbulentos y cambiantes donde, el desarrollar y motivar el recurso humano de la organización toma importancia para la ejecución exitosa de estrategias diferenciales.
Resumo:
Objetivo: Evaluar la percepción que tienen los trabajadores acerca del sistema de seguridad y salud en el trabajo en la población asistencial y administrativa en un Hospital de III nivel de atención., Bogotá-Colombia. Materiales y métodos: Estudio de corte transversal en población de trabajadores asistenciales y administrativos. Se aplicó el “Cuestionario Nórdico Sobre Seguridad en el Trabajo NOSACQ 50 Spanish” validado. La muestra fue probabilística estratificada aleatoria, en 308 trabajadores (230 asistenciales y 78 administrativos). Resultados: El promedio de edad fue 39.5± 12 años, con mayor frecuencia de género femenino (74.68%), estado civil soltero (38.96%) y nivel educativo técnico (34.40%). La percepción que tienen los trabajadores acerca del sistema de seguridad y salud en el trabajo fue independiente de su tipo de actividad laboral administrativa y asistencial (p>0.05), la mayor percepción en ambos grupos fue la confianza de los trabajadores en la eficacia del sistema de seguridad (2.71 y 2.77), y las de menor percepción presentaron el empoderamiento de seguridad de gestión (2.35 y 2.46) y la seguridad como prioridad de los empleados y rechazo del riesgo (2.35 y 2.40). Conclusiones: Los trabajadores del Hospital tienen un nivel adecuado de buena percepción acerca de los aspectos de seguridad y salud en el trabajo donde se evidenció que la fortaleza es la confianza de los trabajadores en la eficacia del sistema y la debilidad del sistema se encuentra en la falta de empoderamiento y rechazo al riesgo.
Resumo:
El presente trabajo tiene como propósito el estudio de la cultura, y el impacto que tiene esta en una red inter-organizacional. Para esto se realizó un estudio documental en el cual se hizo una revisión bibliográfica de los principales conceptos relacionados con la cultura y el enfoque de trabajo en red. Asimismo para dar cumplimiento al objetivo de la investigación, se realizó el análisis de varios estudios empíricos que muestran las relaciones entre cultura y redes y que a su vez reflejan las diferentes formas que existen de comprobar la efectividad de una red. Los resultados mostraron que variables de la cultura como la confianza, la comunicación y la similitud de las prácticas culturales influyen en el desempeño y la duración de la red inter-organizacional, de igual forma, se demostró que al momento de escoger un enfoque de trabajo en red, es importante tener en cuenta las diferencias entre las culturas organizacionales de los miembros de la red ya que es necesario hacer un ajuste cultural para garantizar el éxito de la misma.
Resumo:
La construcción es una de las industrias que mayores accidentes laborales genera, en esta investigación se realizó un análisis retrospectivo para determinar si existe alguna relación entre la ocurrencia de accidentes y la fecha de entrega de una meta, debido al incremento en la cantidad de trabajo expresado por la cantidad de días y horas extras trabajados, se cuenta con información de la accidentalidad de cinco empresas constructoras de un gran proyecto vial en Colombia en los años de 2012 y 2013. Se analizó la información correspondiente a la nómina de las mismas empresas, con el valor de la nómina mensual, el valor de las incapacidades mensuales y la cantidad de trabajadores por cada empresa en cada periodo. El manejo de los datos se hizo con EXCEL y el análisis estadístico con STATA 11.1, se usó la correlación de Spearman para encontrar la relación entre la cantidad de accidentes acumulados y: la cantidad acumulada de días trabajados en cada mes, la cantidad acumulada de horas extras trabajadas mensualmente y el costo acumulado en porcentaje de la nómina mensual, encontrándose en todos los casos una relación lineal. Por otra parte, se realizó una prueba binomial para establecer la relación de la fecha de entrega de la meta con la accidentalidad 30 días antes y después, encontrando que la accidentalidad aumenta en la proximidad previa a la entrega de la meta