963 resultados para 290804 Construction Engineering


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Pragmatic construction professionals, accustomed to intense price competition and focused on the bottom line, have difficulty justifying investments in advanced technology. Researchers and industry professionals need improved tools to analyze how technology affects the performance of the firm. This paper reports the results of research to begin answering the question, “does technology matter?” The researchers developed a set of five dimensions for technology strategy, collected information regarding these dimensions along with four measures of competitive performance in five bridge construction firms, and analyzed the information to identify relationships between technology strategy and competitive performance. Three technology strategy dimensions—competitive positioning, depth of technology strategy, and organizational fit—showed particularly strong correlations with the competitive performance indicators of absolute growth in contract awards and contract award value per technical employee. These findings indicate that technology does matter. The research also provides ways to analyze options for approaching technology and ways to relate technology to competitive performance for use by managers. It also provides a valuable set of research measures for technology strategy.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper extends the understanding of working-time changes and work-life balance (WLB) through analyzing a case study where a reduction in working hours designed to assist the workforce in balancing work and nonwork life was implemented. An alliance project in the Australian construction industry was established initially with a 5-day working week, a departure from the industry-standard 6-day week. However, a range of factors complicated the success of this initiative, and the industry-standard 6-day working week was reinstated for the project. The authors argue that this case is valuable in determining the complex mix of influences that work against a wholesale or straightforward adoption of working-time adjustments and work-life balance practices. It is concluded that although the prevailing workplace culture is considered an important factor in the determination of working time, structural and workplace principles and practices may also be critical in working to secure the successful introduction of working-time reduction and work-life balance initiatives in the construction industry in the future.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The focus of knowledge management (KM) in the construction industry is moving towards capability building for value creation. The study reported by this paper is motivated by recent assertions about the genesis and evolution of knowledge management capability (KMC) in the strategic management field. It attempts to shed light on the governance of learning mechanisms that develop KMC within the context of construction firms. A questionnaire survey was administered to a sample of construction contractors operating in the very dynamic Hong Kong market to elicit opinions on the learning mechanisms and business outcomes of targeted firms. On the basis of a total of 149 usable responses, structural equation modeling (SEM) analysis identified relationships among knowledge-governance mechanisms, knowledge processes, and business performance, thereby supporting the existence of strategic learning loops. The study findings provide evidence from the construction context for capability assertions that knowledge-governance mechanisms and processes form learning mechanisms that carry out strategic learning to create value, effect performance outcomes, and ultimately drive the evolution of KMC. The findings imply that it is feasible for managing construction firms to govern learning mechanisms through managing the capability-based holistic KM system, thereby reconfiguring KMC to match needs in the dynamic market environment over time.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A firm, as a dynamic, evolving, and quasi-autonomous system of knowledge production and application, develops knowledge management capability (KMC) through strategic learning in order to sustain competitive advantages in a dynamic environment. Knowledge governance mechanisms and knowledge processes connect and interact with each other forming learning mechanisms, which carry out double loop learning that drives genesis and evolution of KMC to modify operating routines that effect desired performance. This paper reports a study that was carried out within a context of construction contractors, a type of project-based firms, operating within the dynamic Hong Kong construction market. A multiple-case design was used to incorporate evidence from the literature and interviews, with the help of system dynamics modeling, to visualize the evolution of KMC. The study demonstrates the feasibility to visualize how a firm's KMC matches its operating environment over time. The findings imply that knowledge management (KM) applications can be better planned and controlled through evaluation of KM performance over time from a capability perspective.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Accelerating a project can be rewarding. The consequences, however, can be troublesome if productivity and quality are sacrificed for the sake of remaining ahead of schedule, such that the actual schedule benefits are often barely worth the effort. The tradeoffs and paths of schedule pressure and its causes and effects are often overlooked when schedule decisions are being made. This paper analyses the effects that schedule pressure has on construction performance, and focuses on tradeoffs in scheduling. A research framework has been developed using a causal diagram to illustrate the cause-and-effect analysis of schedule pressure. An empirical investigation has been performed by using survey data collected from 102 construction practitioners working in 38 construction sites in Singapore. The results of this survey data analysis indicate that advantages of increasing the pace of work—by working under schedule pressure—can be offset by losses in productivity and quality. The negative effects of schedule pressure arise mainly by working out of sequence, generating work defects, cutting corners, and losing the motivation to work. The adverse effects of schedule pressure can be minimized by scheduling construction activities realistically and planning them proactively, motivating workers, and by establishing an effective project coordination and communication mechanism.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Downtime (DT) caused by non-availability of equipment and equipment breakdown has non-trivial impact on the performance of construction projects. Earlier research has often addressed this fact, but it has rarely explained the causes and consequences of DT – especially in the context of developing countries. This paper presents a DT model to address this issue. Using this model, the generic factors and processes related to DT are identified, and the impact of DT is quantified. By applying the model framework to nine road projects in Nepal, the impact of DT is explored in terms of its duration and cost. The research findings highlight how various factors and processes interact with each other to create DT, and mitigate or exacerbate its impact on project performance. It is suggested that construction companies need to adopt proactive equipment management and maintenance programs to minimize the impact of DT.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The internationalization of construction companies has become of significant interest as the global construction market continues to be integrated into a more competitive and turbulent business environment. However, due to the complicated and multifaceted nature of international business and performance, there is as yet no consensus on how to evaluate the performance of international construction firms (ICFs). The purpose of this paper, therefore, is to develop a practical framework for measuring the performance of ICFs. Based on the balanced scorecard (BSC), a framework with detailed measures is developed, investigated, and tested using a three-step research design. In the first step, 27 measures under six dimensions (financial, market, customer, internal business processes, stakeholders, and learning and growth) are determined by literature review, interviews with academics, and seminar discussions. Subsequently, a questionnaire survey is conducted to investigate weights of these 27 performance measures. The questionnaire survey also supports the importance of measuring intangible aspects of international construction performance from the practitioner’s viewpoint. Additionally, a case study is described to test the framework’s robustness and usefulness. This is achieved by benchmarking the performance of a Chinese ICF with nine other counterparts worldwide. It is found that the framework provides an effective basis for benchmarking ICFs to effectively monitor their performance and support the development of strategies for improved competitiveness in the international arena. This paper is the first attempt to present a balanced and practically tested framework for evaluating the performance of ICFs. It contributes to the practice of performance measurement and related internationalization in the construction industry in general.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

It is well-known that the use of off-site manufacture (OSM) techniques can assist in timely completion of a construction project though the utilisation of such techniques may have other disadvantages. Currently, OSM uptake within the Australian construction industry is limited. To successfully incorporate OSM practices within a construction project, it is crucial to understand the impact of OSM adoption on the processes used during a construction project. This paper presents how a systematic process-oriented approach may be able to support OSM utilisation within a construction project. Process modelling, analysis and automation techniques which are well-known within the Business Process Management (BPM) discipline have been applied to develop a collection of construction process models that represent the end-to-end generic construction value chain. The construction value chain enables researchers to identify key activities, resources, data, and stakeholders involved in construction processes in each defined construction phase. The collection of construction process models is then used as a basis for identification of potential OSM intervention points in collaboration with domain experts from the Australian construction industry. This ensures that the resulting changes reflect the needs of various stakeholders within the construction industry and have relevance in practice. Based on the input from the domain experts, these process models are further refined and operational requirements are taken into account to develop a prototype process automation (workflow) system that can support and coordinate OSM-related process activities. The resulting workflow system also has the potential to integrate with other IT solutions used within the construction industry (e.g., BIM, Acconex). As such, the paper illustrates the role that process-oriented thinking can play in assisting OSM adoption within the industry.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Earthwork planning has been considered in this article and a generic block partitioning and modelling approach has been devised to provide strategic plans of various levels of detail. Conceptually this approach is more accurate and comprehensive than others, for instance those that are section based. In response to environmental concerns the metric for decision making was fuel consumption and emissions. Haulage distance and gradient are also included as they are important components of these metrics. Advantageously the fuel consumption metric is generic and captures the physical difficulties of travelling over inclines of different gradients, that is consistent across all hauling vehicles. For validation, the proposed models and techniques have been applied to a real world road project. The numerical investigations have demonstrated that the models can be solved with relatively little CPU time. The proposed block models also result in solutions of superior quality, i.e. they have reduced fuel consumption and cost. Furthermore the plans differ considerably from those based solely upon a distance based metric thus demonstrating a need for industry to reflect upon their current practices.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The interaction between head contractor and subcontractor in modern construction often contributes to the degree of success or failure of any large-scale construction project. In this paper, previous research on the relationship and interaction between head contractor and subcontractor is examined in order to establish how these relationships will affect the overall performance of a project. Based on the review, research questions on how to best manage the interaction and relationship between these two vital project participants are proposed and future research direction discussed.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry has long been burdened with inherent adversarial relationships among the parties and the resulting disputes. Dispute review boards (DRBs) have emerged as alternatives to settle construction-related disputes outside courts. Although DRBs have found support in some quarters of the construction industry, the quantitative assessment of the impact of DRBs has not been adequately addressed. This paper presents the results of a research project undertaken to assess the impact of DRBs on the construction program of a large-scale highway agency. Three dimensions of DRB impact were assessed: (1) influence on project cost and schedule performance, (2) effectiveness of DRBs in preventing and resolving construction disputes, and (3) costs of DRB implementation. The analyses encompass data from approximately 3,000 projects extending over a 10-year period (2000–2009). Quantitative measures of performance were developed and analyzed for each category. Projects that used DRBs faced reduced costs and schedule growth (6.88 and 12.92%, respectively) when compared to non-DRB projects (11.53 and 28.96%). DRBs were also found to be effective in avoiding and settling disputes; the number of arbitration cases reduced consistently after DRB implementation, and DRBs have a success rate of 97% in settling disputes for which DRBs were used. Moreover, costs of DRBs were found to comprise a relatively small fraction (i.e., approximately 0.3%) of total project budgets. It was concluded that DRBs were effective dispute prevention and resolution alternatives with no significant adverse effects on project performance.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The complex supply chain relations of the construction industry, coupled with the substantial amount of information to be shared on a regular basis between the parties involved, make the traditional paper-based data interchange methods inefficient, error prone and expensive. The successful information technology (IT) applications that enable seamless data interchange, such as the Electronic Data Interchange (EDI) systems, have generally failed to be successfully implemented in the construction industry. An alternative emerging technology, Extensible Markup Language (XML), and its applicability to streamline business processes and to improve data interchange methods within the construction industry are analysed, as is the EDI technology to identify the strategic advantages that XML technology provides to overcome the barriers to implementation. In addition, the successful implementation of XML-based automated data interchange platforms for a large organization, and the proposed benefits thereof, are presented as a case study.