831 resultados para Supply contract


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of the study is to determine general features of the supply chain performance management system, to assess the current state of performance management in the case company mills and to make proposals for improvement – how the future state of performance management system would look like. The study covers four phases which consist of theory and case company parts. Theoretical review gives understanding about performance management and measurement. Current state analysis assesses the current state of performance management in the mills. Results and proposals for improvement are derived from current state analysis and finally the conclusions with answers to research questions are presented. Supply chain performance management system consists of five areas: perfor-mance measurement and metrics, action plans, performance tracking, performance dialogue and rewards, consequences and actions. The result of the study revealed that all mills were quite average level in performance management and there is a room for improvement. Created performance improvement matrix served as a tool in assessing current performance management and could work also as a tool in the future in mapping the current state after transformation process. Limited harmonization was revealed as there were different ways to work and manage performance in the mills. Lots of good ideas existed though actions are needed to make a progress. There is also need to harmonize KPI structure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research report illustrates and examines new operation models for decreasing fixed costs and transforming them into variable costs in the field of paper industry. The report illustrates two cases – a new operation model for material logistics in maintenance and an examination of forklift truck fleet outsourcing solutions. Conventional material logistics in maintenance operation is illustrated and some problems related to conventional operation are identified. A new operation model that solves some of these problems is presented including descriptions of procurement and service contracts and sources of added value. Forklift truck fleet outsourcing solutions are examined by illustrating the responsibilities of a host company and a service provider both before and after outsourcing. The customer buys outsourcing services in order to improve its investment productivity. The mechanism of how these services affect the customer company’s investment productivity is illustrated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Forest biomass represents a geographically distributed feedstock, and geographical location affects the greenhouse gas (GHG) performance of a given forest-bioenergy system in several ways. For example, biomass availability, forest operations, transportation possibilities and the distances involved, biomass end-use possibilities, fossil reference systems, and forest carbon balances all depend to some extent on location. The overall objective of this thesis was to assess the GHG emissions derived from supply and energy-utilization chains of forest biomass in Finland, with a specific focus on the effect of location in relation to forest biomass’s availability and the transportation possibilities. Biomass availability and transportation-network assessments were conducted through utilization of geographical information system methods, and the GHG emissions were assessed by means of lifecycle assessment. The thesis is based on four papers in which forest biomass supply on industrial scale was assessed. The feedstocks assessed in this thesis include harvesting residues, smalldiameter energy wood and stumps. The principal implication of the findings in this thesis is that in Finland, the location and availability of biomass in the proximity of a given energyutilization or energy-conversion plant is not a decisive factor in supply-chain GHG emissions or the possible GHG savings to be achieved with forest-biomass energy use. Therefore, for the greatest GHG reductions with limited forest-biomass resources, energy utilization of forest biomass in Finland should be directed to the locations where most GHG savings are achieved through replacement of fossil fuels. Furthermore, one should prioritize the types of forest biomass with the lowest direct supply-chain GHG emissions (e.g., from transport and comminution) and the lowest indirect ones (in particular, soil carbon-stock losses), regardless of location. In this respect, the best combination is to use harvesting residues in combined heat and power production, replacing peat or coal.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Few people see both opportunities and threats coming from IT legacy in current world. On one hand, effective legacy management can bring substantial hard savings and smooth transition to the desired future state. On the other hand, its mismanagement contributes to serious operational business risks, as old systems are not as reliable as it is required by the business users. This thesis offers one perspective of dealing with IT legacy – through effective contract management, as a component towards achieving Procurement Excellence in IT, thus bridging IT delivery departments, IT procurement, business units, and suppliers. It developed a model for assessing the impact of improvements on contract management process and set of tools and advices with regards to analysis and improvement actions. The thesis conducted case study to present and justify the implementation of Lean Six Sigma in IT legacy contract management environment. Lean Six Sigma proved to be successful and this thesis presents and discusses all the steps necessary, and pitfalls to avoid, to achieve breakthrough improvement in IT contract management process performance. For the IT legacy contract management process two improvements require special attention and can be easily copied to any organization. First is the issue of diluted contract ownership that stops all the improvements, as people do not know who is responsible for performing those actions. Second is the contract management performance evaluation tool, which can be used for monitoring, identifying outlying contracts and opportunities for improvements in the process. The study resulted in a valuable insight on the benefits of applying Lean Six Sigma to improve IT legacy contract management, as well as on how Lean Six Sigma can be applied in IT environment. Managerial implications are discussed. It is concluded that the use of data-driven Lean Six Sigma methodology for improving the existing IT contract management processes is a significant addition to the existing best practices in contract management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To describe the change of purchasing moving from administrative to strategic function academics have put forward maturity models which help practitioners to compare their purchasing activities to industry top performers and best practices. However, none of the models aim to distinguish the purchasing maturity from the after-sales point of view, even though after-sales activities are acknowledged as a relevant source of revenue, profit and competitive advantage in most manufacturing firms. The maturity of purchasing and supply management practices have a large impact to the overall performance of the spare parts supply chain and ultimately to the value creation and relationship building for the end customer. The research was done as a case study for a European after-sales organization which is part of a globally operating industrial firm specialized in heavy machinery. The study mapped the current state of the purchasing practices in the case organization and also distinguished the relevant areas for future development. The study was based on the purchasing maturity model developed by Schiele (2007) and investigated also how applicable is the maturity model in the spare parts supply chain context. Data for the assessment was gathered using five expert interviews inside the case organization and other parties involved in the company’s spare parts supply chain. Inventory management dimension was added to the original maturity model in order to better capture the important areas in a spare parts supply chain. The added five questions were deduced from the spare parts management literature and verified as relevant areas by the case organization’s personnel. Results indicate that largest need for development in the case organization are: better collaboration between sourcing and operative procurement functions, use of installed base information in the spare parts management, training plan development for new buyers, assessment of aligned KPI’s between the supply chain parties and better defining the role of after-sales sourcing. The purchasing maturity model used in this research worked well in H&R Leading, Controlling and Inventory Management dimensions. The assessment was more difficult to conduct in the Supplier related processes, Process integration and Organizational structure –dimensions, mainly because the assessment in these sections would for some parts require more company-wide assessment. Results indicate also that the purchasing maturity model developed by Schiele (2007) captures the relevant areas in the spare parts supply as well.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This Master’s Thesis studies performance management system and its benefits, risks and costs. Objective of the thesis is to describe and evaluate currently used supply chain performance management system (SCPMS) in a Finnish paper mill and its interfaces with its business unit’s SCPMS. As a result, the host company has improvement road map for improving its SCPMS. Used SCPMS in the host company and its interfaces to business unit’s SCPMS are described based on interviews held in the host company and the business unit. Evaluation of the host company’s SCPMS is based on literature study. For improvement road map, three areas in need of improvements are chosen. The study shows the need of high level top management commitment in successful performance management system implementation and usage, especially when the system is deployed to lower levels in the organization.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Implementing an enterprise resource planning (ERP) system often means a major change to an organization and involves significant risks. It is typical that many of the ERP system implementations fail resulting in tremendous damage to the business. Moreover, running normal business operations during an ERP system implementation is far more complicated than normally. This thesis focuses on how an organization should manage the ERP system implementation process in order to maintain supply performance during the implementation phase. The theoretical framework in this thesis focuses on ERP system implementations with a critical success factor approach. Critical success factors can be divided into strategic and tactical level success factors. By considering these critical success factors, ERP system implementation project’s timeline and best practices of an ERP implementation, a critical success factor based ERP system implementation management framework is presented. The framework can be used as a theoretical framework when the goal is to avoid ERP system implementation phase issues that are driven by the ERP system implementation project and that may decrease organization’s supply performance. This thesis is a case study that was written on an assignment to a confectionary company Cloetta Suomi Oy. In order to collect data, interviews of the case company personnel were conducted. In addition, several other data collection methods were used throughout the research process. These data collection methods include examination of presentations and archival records as well as direct observations in case company meetings and in various work duties. The results of this thesis indicate that there are several factors that may decrease organization’s supply performance during the ERP system implementation. These issues are categorized under external and internal issues and further into six risk drivers that are suppliers, customers, products, staff, information systems and other projects. After the description and categorization of each issue, the thesis focuses on finding solutions on how to avoid or mitigate the impact of these issues on the organization’s supply performance. This examination leads to several operational activities that are also practical to business practitioners. It is also stated that a successful ERP system implementation that also causes minimal disturbance to organization’s supply performance during the ERP system implementation, is achieved by considering three levels of actions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The role of contract manufacturing and subcontracting has been seen in black and white in product and service point of view. It used to be seen either as a product or a service. In the thesis product-service system, offering combining products and services, was discussed. Theory was created from two perspectives; Service productization via Business Model generation and product servitization via New Service Development process. Target for the case study was to point out new ways of service thinking and ways for changing business environment in contract manufacturing, especially in customer satisfaction and profitability point of view. The case study is following the New Service Development process phases. First ideas were collected from literature and via sales management interviews. Service offering and tool for service requirement evaluation was created. Last financial results of example service scenarios were calculated. It is recommended to take service offering into internal use and further develop it into modular service model. It is also recommended to take created customer service requirement evaluation tool into use for capturing customer service needs but also for communicating those internally.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Finnish electricity distribution sector, rural areas in particular, is facing major challenges because of the economic regulation, tightening supply security requirements and the ageing network asset. Therefore, the target in the distribution network planning and asset management is to develop and renovate the networks to meet these challenges in compliance with the regulations in an economically feasible way. Concerning supply security, the new Finnish Electricity Market Act limits the maximum duration of electricity supply interruptions to six hours in urban areas and 36 hours in rural areas. This has a significant impact on distribution network planning, especially in rural areas where the distribution networks typically require extensive modifications and renovations to meet the supply security requirements. This doctoral thesis introduces a methodology to analyse electricity distribution system development. The methodology is based on and combines elements of reliability analysis, asset management and economic regulation. The analysis results can be applied, for instance, to evaluate the development of distribution reliability and to consider actions to meet the tightening regulatory requirements. Thus, the methodology produces information for strategic decision-making so that DSOs can respond to challenges arising in the electricity distribution sector. The key contributions of the thesis are a network renovation concept for rural areas, an analysis to assess supply security, and an evaluation of the effects of economic regulation on the strategic network planning. In addition, the thesis demonstrates how the reliability aspect affects the placement of automation devices and how the reserve power can be arranged in a rural area network.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report summarizes the results of the survey HAVERI – Supply network risks in business. The survey was conducted in Finland during the spring and summer of year 2013. The survey is part of a large two-year research project started in June 2012 in Finland (on-going 06/2012–07/2014). The project is launched and financed by TEKES, the Finnish Funding Agency for Technology and Innovation, and executed together with the researchers from Lappeenranta University of Technology and Tampere University of Technology. The overall goal of this on-going research project is to find out the decision-making practices in the project-oriented companies in their purchasing decisions especially in the mechanical engineering and construction industries in Finland. The objective of the survey was to gain cross-sectional data concerning the challenges, risks and cost factors in Finnish project business companies. The results show that Finnish companies rely on their experience and supplier references in their risk management. In general, the understanding of the total cost structure varies among the industries and companies. The main cost factor in risk management was costs before the actual purchase decision. Overall, it seems that the monetary value of the whole project and capability of purchasing personnel are the main influencing factors on risk management activity in project purchasing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Nowadays the Western companies are considered responsible for the social and environmental issues in their whole supply chains. To influence the practices of their suppliers the Western companies have created suppliers codes of conduct (SCCs) which express their requirements. Suppliers’ compliance with the SCCs is checked through audits. The purpose of this thesis is to analyze SCCs as a means for Western companies to ensure socially and environmentally responsible actions in their global supply chains, and the sub-objectives are to find out 1) how well do the SCCs and their auditing work at suppliers’ production sites and 2) how can possible problems related to SCCs and their auditing be solved. This is a qualitative research carried out in the form of a case study with two case companies. In this study both primary and secondary data is used. The primary data is collected in the form of interviews of the case company representatives and three external experts. Based on a theoretical framework of previous research in the fields of corporate social responsibility and supply chain management, a model with eleven factors, which influence the success of SCC implementation and the auditing of SCC –implementation, is drafted. Also several different best-practices to help to solve and avoid possible problems related to SCC -implementation and auditing have been identified from previous research. Based on the findings of this study the theoretical model has been updated adding two new influential factors. It seems that how well the SCC and its auditing work at suppliers’ production sites depends on the joint effect of thirteen influential factors: buyer’s purchasing policy, supplier’s motivation, buyer’s commitment, the solving of agency problems, the contents of the SCC, supplier’s role and the buyer-supplier –relationship, complexity of supply chain, the limitations of the smaller buyers, cooperation through a business association or multi-stakeholder system, the role of supplier’s employees, SCC –related communication and supplier’s understanding, cheating in audits and the auditors. The possible problems related to SCCs and their auditing can be solved by adopting best-practices. Nine of the theoretical best-practices stand out from the findings of this study: 1) two-way communication and collecting feedback from suppliers, 2) the philosophy of continuous improvement, 3) long-term business relationships with the supplier, 4) informing the supplier about the advantages of SCC –compliance, 5) rewarding code-compliant suppliers, 6) building collaborative, good buyer-supplier relationships, 7) supporting and advising the supplier, 8) joining a business association or multi-stakeholder system and 9) interviewing supplier’s employees as a part of the audits.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tiivistelmä: Elinkaaren palvelumallit ovat suosittuja julkisten palveluiden hankintamuotoja Iso-Britanniassa. PPP–malli on yksi monista julkisten palvelujen kumppanuusmalleista, josta on tullut joissakin kunnissa yhä suositumpi hankintamalli myös Suomessa. Tämä on seurausta kuntien tiukasta taloustilanteesta, jossa PPP–hankkeen katsotaan mahdollistavan julkisen sektorin investoinnit joutumatta leikkaamaan muita pakollisia hankintoja. Kuitenkin koko elinkaaren kattavat palvelutarjonnan hankintamallit ovat vielä melko uusia malleja ja meillä on tarve löytää toimivia sopimusmalleja ja käytäntöjä, jotta hankkeista saadaan rakennusliikettä kiinnostavia liiketoimintamalleja. Ulkomailla elinkaarihankkeista on tehty monia tutkimuksia ja konsultit ovat kääntäneet niitä omiin tarkoituksiinsa sopiviksi. Kuitenkin Suomen lainsäädäntö on erilainen julkisten palveluiden tuottamisessa, erityisesti lakisääteisissä terveydenhuoltopalveluissa, vesi- ja jätevesihuollossa, vankeinhoidossa, ja niin edelleen. Tästä näkökulmasta ulkomailla tehdyt tutkimukset eivät sellaisenaan sovi Suomeen käytettäviksi. Esimerkiksi tutkimuksissa esitetään, että elinkaarihankkeet tuottavat pitkän aikavälin kassavirtaan, mutta tämä etu koskee vain rahoittaja ja kiinteistöpalvelu yrityksiä - ei rakennusyritystä. Tutkimuksissa mainitaan myös muista elinkaarihankkeiden mahdollisuuksista, jotka jäävät kuitenkin rakennusliikkeen näkökulmasta epäselviksi. Perinteisiin rakennuttamisen malleihin verrattuna elinkaarihankkeiden sopimusmenettelyt ovat monimutkaisempia sekä aikaa vievempiä ja sopijaosapuolten yhteistyö elinkaarihankkeissa on välttämätöntä. Käytännössä elinkaarihankkeiden riskienjako nähdään julkisen sektorin ja yksityisen sektorin välillä yksipuoliseksi. Jotta elinkaarimalli yleistyisi Suomessa, niin elinkaarisopimuksen riskienjaosta on tehtävä tasapuolinen ja käyttäjä pitää saada myös riskejä kantamaan. Tässä työssä keskitytään arvioimaan elinkaarimallien keskeisiä menestystekijöitä ja riskitekijöitä ja löytää mahdollisia tapoja tehdä hankintaprosessista helppoa ja sujuvaa. Samalla yritetään selvittää, miten elinkaarihankkeesta saadaan rakennusliikkeen kannalta menestyvää liiketoimintaa. Johtopäätökset perustuvat aikaisempiin tutkimuksiin ja empiiriseen tapaustutkimukseen. Työssä arvioidaan niitä seikkoja, jotka vaikuttavat yksityisen sektorin tarjouspäätökseen. Arvioinnissa erotetaan toisistaan kolme erillistä riskitekijää; tarjouksen tekemisen riskit, rakennushankkeen riskit ja elinkaaren aikaiset riskit. Työssä todetaan, että aikaisemmat tutkimukset ovat riittämättömiä rakennusliikkeen riskien arvioimiseen.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

(Response of Dalbergia miscolobium Benth. seedlings, a cerrado tree species, to a mineral nutrient supply). The soil under the Brazilian cerrado vegetation is very poor in nutrients. The aim of this study was to investigate the effect of the addition of a nutrient solution in the early growth of D. miscolobium, a typical cerrado tree species, cultivated in cerrado soil. Seeds were germinated in Petri dishes and seven-day old seedlings were transfered to pots containing cerrado soil. These were supplied once a week with a normal, 1/2 or 1/10 strength nutrient solution. Four growth analysis were done over a period of 145 days from seed imbibition, in terms of dry mass, leaf area and carbohydrate and nitrogen contents. Other derived parameters were also analysed. The addition of a nutrient solution promoted early growth with a preferential separation of dry matter towards the tops; in the control seedlings (no nutrient addition) more dry matter accumulated in the root system. This suggests a preferential investment in root growth in poor soils such as the cerrado ones. Reliable evidence of this is given by the level of carbohydrate and protein which was higher in the roots than in the tops of plants growing in cerrado soil without the addition of nutrients.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study examines the practice of supply chain management problems and the perceived demand information distortion’s (the bullwhip effect) reduction with the interfirm information system, which is delivered as a cloud service to a company operating in the telecommunications industry. The purpose is to shed light in practice that do the interfirm information system have impact on the performance of the supply chain and in particularly the reduction of bullwhip effect. In addition, a holistic case study of the global telecommunications company's supply chain is presented and also the challenges it’s facing, and this study also proposes some measures to improve the situation. The theoretical part consists of the supply chain and its management, as well as increasing the efficiency and introducing the theories and related previous research. In addition, study presents performance metrics for the bullwhip effect detection and tracking. The theoretical part ends in presenting cloud -based business intelligence theoretical framework used in the background of this study. The research strategy is a qualitative case study, supported by quantitative data, which is collected from a telecommunication sector company's databases. Qualitative data were gathered mainly with two open interviews and the e-mail exchange during the development project. In addition, other materials from the company were collected during the project and the company's web site information was also used as the source. The data was collected to a specific case study database in order to increase reliability. The results show that the bullwhip effect can be reduced with the interfirm information system and with the use of CPFR and S&OP models and in particularly combining them to an integrated business planning. According to this study the interfirm information system does not, however, solve all of the supply chain and their effectiveness -related problems, because also the company’s processes and human activities have a major impact.