952 resultados para Full-scale Physical Modelling
Resumo:
In this contribution, original limit analysis numerical results are presented dealing with some reinforced masonry arches tested at the University of Minho-UMinho, PT. Twelve in-scale circular masonry arches were considered, reinforced in various ways at the intrados or at the extrados. GFRP reinforcements were applied either on undamaged or on previously damaged elements, in order to assess the role of external reinforcements even in repairing interventions. The experimental results were critically discussed at the light of limit analysis predictions, based on a 3D FE heterogeneous upper bound approach. Satisfactory agreement was found between experimental evidences and the numerical results, in terms of failure mechanisms and peak load.
Resumo:
Introduction: Following a disaster, up to 50% of mass casualties are children. The number of disaster increases worldwide, including in Switzerland. Following national order, the mapping of the various risks of disaster in Switzerland will be completed by the end of 2012. Pre-hospital disaster drills and plans are well established and regularly tested. In-hospital disaster plans are much less frequently tested, if only available. Pediatric in-hospital full scale disaster exercises have never been reported in Switzerland. Based on our local constraints, we set up and evaluated a disaster plan during two full scale exercises. Methods: In a university hospital treating more than 35 000 pediatric emergencies per year, two exercises involving mock victims of a disaster aged 9 to 14 years old were successively set up over a period of 3 years. The exercises were planned during the day, without modification of the normal emergency room activities. The hospital staff was informed and trained in advance. Variables such as the alarm timing and transmission, triage set-up and function, special disaster medical records utilization, communication and victims' identification were assessed. Family members participated in the second exercise. An evaluation team observed and record exercises activities, identifying strength and weaknesses. Results: On two separate occasions, a total of 44 mock patients participated, were triaged, admitted and treated in the hospital according to usual standards of care. Alarm transmission was not appropriate during the first exercise. Triage overload occurred on one occasion. In-hospital communication needed readjustment. Identification and in-hospital tracking of the children remained problematic. Hospital employees showed great enthusiasm and stressed the positive effect of full scale exercises on their knowledge of the hospital disaster plan. Conclusions: Performing real life disaster exercises in a pediatric hospital was very beneficial. The disaster plan was adapted to local needs and updated accordingly. An alarm transmission protocol was elaborated and tested. Triage set-up was adapted and tested. A hospital identification plan for injured children was created and tested. Full scale hospital exercises evaluating disaster plans revealed several weaknesses in the system. Practice readjustments based on local experience were made. A tested pediatric disaster plan adapted to local constraints could minimize chaos, optimize care and support in the event of a real disaster. Children's identification and family reunification following a disaster remains a challenge.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges are scheduled for removal. Five of these are old high-truss single-lane bridges, each bridge having several simple spans. The other bridge is a fairly modern (1955) double 4-span continuous beam-and-slab composite highway bridge. The availability of these bridges affords an unusual opportunity for study of the behavior of full-scale bridges. Because of the magnitude of the potential testing program, a feasibility study was initiated and the results are presented in this two-part final report. Part I summarizes the findings and Part II presents the supporting detailed information.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. One of these, an old pin-connected, high-truss, single-lane bridge, was selected for a comprehensive testing program which included ultimate load tests, service load tests, and a supplementary test program. A second bridge was used for a limited service load test program. The results of the research are detailed in two interim reports. The first interim report outlines the ultimate load tests and the second interim report details the results of the service load and supplementary test program. This report presents a summary of these findings along with recommendations for implementation of the findings.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. One of these, an old pinconnected high-truss single-lane bridge, was selected for a testing program which included ultimate load tests. The purpose of the ultimate load tests, which are summarized in this report, was to relate design and rating procedures presently used in bridge design to the field behavior of this type of truss bridge. The ultimate load tests consisted of ultimate load testing of one span of the bridge, of two I-shaped floorbeams, and of two panels of the timber deck. The theoretical capacity of each of these components is compared with the results from the field tests.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. Two of these were incorporated into a comprehensive test program to study the behavior of old pin-connected high-truss single-lane bridges. The test program consisted of ultimate load tests, service load tests and a supplementary test program. The results reported in this report cover the service load tests on the two bridges as well as the supplementary tests, both static and fatigue, of eyebar members removed from the two bridges. The field test results of the service loading are compared with theoretical results of the truss analysis.
Resumo:
We present a detailed evaluation of the seasonal performance of the Community Multiscale Air Quality (CMAQ) modelling system and the PSU/NCAR meteorological model coupled to a new Numerical Emission Model for Air Quality (MNEQA). The combined system simulates air quality at a fine resolution (3 km as horizontal resolution and 1 h as temporal resolution) in north-eastern Spain, where problems of ozone pollution are frequent. An extensive database compiled over two periods, from May to September 2009 and 2010, is used to evaluate meteorological simulations and chemical outputs. Our results indicate that the model accurately reproduces hourly and 1-h and 8-h maximum ozone surface concentrations measured at the air quality stations, as statistical values fall within the EPA and EU recommendations. However, to further improve forecast accuracy, three simple bias-adjustment techniques mean subtraction (MS), ratio adjustment (RA), and hybrid forecast (HF) based on 10 days of available comparisons are applied. The results show that the MS technique performed better than RA or HF, although all the bias-adjustment techniques significantly reduce the systematic errors in ozone forecasts.
Resumo:
Similarities between the anatomies of living organisms are often used to draw conclusions regarding the ecology and behaviour of extinct animals. Several pterosaur taxa are postulated to have been skim-feeders based largely on supposed convergences of their jaw anatomy with that of the modern skimming bird, Rynchops spp. Using physical and mathematical models of Rynchops bills and pterosaur jaws, we show that skimming is considerably more energetically costly than previously thought for Rynchops and that pterosaurs weighing more than one kilogram would not have been able to skim at all. Furthermore, anatomical comparisons between the highly specialised skull of Rynchops and those of postulated skimming pterosaurs suggest that even smaller forms were poorly adapted for skim-feeding. Our results refute the hypothesis that some pterosaurs commonly used skimming as a foraging method and illustrate the pitfalls involved in extrapolating from limited morphological convergence.
Resumo:
Similarities between the anatomies of living organisms are often used to draw conclusions regarding the ecology and behaviour of extinct animals. Several pterosaur taxa are postulated to have been skim-feeders based largely on supposed convergences of their jaw anatomy with that of the modern skimming bird, Rynchops spp. Using physical and mathematical models of Rynchops bills and pterosaur jaws, we show that skimming is considerably more energetically costly than previously thought for Rynchops and that pterosaurs weighing more than one kilogram would not have been able to skim at all. Furthermore, anatomical comparisons between the highly specialised skull of Rynchops and those of postulated skimming pterosaurs suggest that even smaller forms were poorly adapted for skim-feeding. Our results refute the hypothesis that some pterosaurs commonly used skimming as a foraging method and illustrate the pitfalls involved in extrapolating from limited morphological convergence.
Resumo:
The main aim of this project is to develop an ESES lab on a full scale system. The solar combisystem used is available most of the time and is only used twice a year to carry out some technical courses. At the moment, there are no other laboratories about combisystems. The experiments were designed in a way to use the system to the most in order to help the students apply the theoretical knowledge in the solar thermal course as well as make them more familiar with solar systems components. The method adopted to reach this aim is to carry out several test sequences on the system, in order to help formulating at the end some educating experiments. A few tests were carried out at the beginning of the project just for the sake of understanding the system and figuring out if any additional measuring equipment is required. The level of these tests sequences was varying from a simple energy draw off or collector loop controller respond tests to more complicated tests, such as the use of the ‘collector’ heater to simulate the solar collector effect on the system. The tests results were compared and verified with the theoretical data wherever relevant. The results of the experiment about the use of the ‘collector’ heater instead of the collector were positively acceptable. Finally, the Lab guide was developed based on the results of these experiments and also the experience gotten while conducting them. The lab work covers the theories related to solar systems in general and combisystems in particular.
Resumo:
Gli impianti di depurazione rappresentano, nei contesti urbani, elementi di imprescindibile importanza nell’ambito di una corretta gestione e tutela della risorsa idrica e dell’ambiente. Il crescente grado di antropizzazione delle aree urbanizzate e parallelamente le sempre minori disponibilità in termini di spazi utilizzabili a fini depurativi comportano sempre di più la necessità di ottimizzare i processi di dimensionamento degli impianti. Inoltre, l’obiettivo di aumentare l’efficienza del ciclo depurativo andando a minimizzare i costi correlati alla gestione degli stessi indirizza verso una omogeneizzazione nei criteri di dimensionamento adottati. In questo senso, la normativa tecnica di settore risulta carente, andandosi a concentrare prevalentemente sul rispetto di fissati standard ambientali senza però fornire indicazioni precise sui criteri di progettazione da adottare per perseguire tali standard. La letteratura scientifica pur indicando range di possibili valori di riferimento da adottare, nel dimensionamento degli impianti, lascia un ampio margine di discrezionalità al progettista. La presente tesi si pone pertanto, a partire da tali valori di letteratura, di andare a definire da un lato le caratteristiche quali-quantitative del refluo in ingresso e dall’altro i valori di riferimento da adottare in sede di progettazione per perseguire gli obiettivi precedentemente indicati. La prima parte, di valenza generale, oltre alla caratterizzazione dell’influente descrive nel dettaglio le diverse fasi del processo e il loro dimensionamento che in tutte le sezioni, ad eccezione del biologico, viene effettuato attraverso equazioni semplificate mettendo a confronto e analizzando i parametri progettuali proposti da letteratura. Per quanto riguarda il comparto biologico la maggior complessità del fenomeno da descrivere rende difficile la valutazione delle grandezze che caratterizzano il funzionamento mediante l’utilizzo di equazioni semplificate. Per questo si è deciso di modellare questo comparto, unito a quello della sedimentazione, attraverso un software (WEST) che permette non solo di simulare il processo ma anche, attraverso le analisi di scenario, di determinare quelli che sono i valori progettuali puntuali che consentono di ottenere da un lato una minimizzazione dei costi dell’impianto, sia costruttivi che gestionali, e dall’altro la massimizzazione delle rese depurative. Nello specifico si è fatto riferimento ad impianto fanghi attivi a schema semplificato con potenzialità fissata pari a 10000 AE. Il confronto con i dati di esercizio di alcuni impianti di analoga tipologia ha evidenziato che una buona capacità dello strumento di modellazione utilizzato di descrivere i processi. E’ possibile quindi concludere che tali strumenti, affiancati ad una lettura critica dei risultati ottenuti possono essere ottimi strumenti di supporto sia in fase di progettazione che in prospettiva di gestione dell’impianto al fine di ottimizzare i processi e quindi i costi.