Ultimate Load Behavior of Full-Scale Highway Truss Bridges, Summary Report, HR-169, 1975


Autoria(s): Desconhecido
Data(s)

01/09/1975

Resumo

As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. One of these, an old pin-connected, high-truss, single-lane bridge, was selected for a comprehensive testing program which included ultimate load tests, service load tests, and a supplementary test program. A second bridge was used for a limited service load test program. The results of the research are detailed in two interim reports. The first interim report outlines the ultimate load tests and the second interim report details the results of the service load and supplementary test program. This report presents a summary of these findings along with recommendations for implementation of the findings.

Formato

pdf

Identificador

http://publications.iowa.gov/17307/1/IADOT_hr169summary_Ultimate_Load_Behavior_Full_Scale_Hwy_Trss_Brid_1975.pdf

(1975) Ultimate Load Behavior of Full-Scale Highway Truss Bridges, Summary Report, HR-169, 1975. Transportation, Department of

Idioma(s)

en

Relação

http://publications.iowa.gov/17307/

Palavras-Chave #Transportation #Bridges and tunnels #Roads and highways #Research #Design and Construction
Tipo

Departmental Report

NonPeerReviewed