Feasibility Study of Dynamic Overload and Ultimate Load Tests of Full-Scale Highway Bridges, HR-160, 1973


Autoria(s): Desconhecido
Data(s)

01/01/1973

Resumo

As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges are scheduled for removal. Five of these are old high-truss single-lane bridges, each bridge having several simple spans. The other bridge is a fairly modern (1955) double 4-span continuous beam-and-slab composite highway bridge. The availability of these bridges affords an unusual opportunity for study of the behavior of full-scale bridges. Because of the magnitude of the potential testing program, a feasibility study was initiated and the results are presented in this two-part final report. Part I summarizes the findings and Part II presents the supporting detailed information.

Formato

pdf

Identificador

http://publications.iowa.gov/17306/1/IADOT_hr160_Feasibility_Study_Dynamic_Overload_Ultimate_Load_Test_Hwy_Bridges_1973.pdf

(1973) Feasibility Study of Dynamic Overload and Ultimate Load Tests of Full-Scale Highway Bridges, HR-160, 1973. Transportation, Department of

Idioma(s)

en

Relação

http://publications.iowa.gov/17306/

Palavras-Chave #Transportation #Bridges and tunnels #Roads and highways #Research #Design and Construction
Tipo

Departmental Report

NonPeerReviewed