Feasibility Study of Dynamic Overload and Ultimate Load Tests of Full-Scale Highway Bridges, HR-160, 1973
| Data(s) |
01/01/1973
|
|---|---|
| Resumo |
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges are scheduled for removal. Five of these are old high-truss single-lane bridges, each bridge having several simple spans. The other bridge is a fairly modern (1955) double 4-span continuous beam-and-slab composite highway bridge. The availability of these bridges affords an unusual opportunity for study of the behavior of full-scale bridges. Because of the magnitude of the potential testing program, a feasibility study was initiated and the results are presented in this two-part final report. Part I summarizes the findings and Part II presents the supporting detailed information. |
| Formato |
|
| Identificador |
(1973) Feasibility Study of Dynamic Overload and Ultimate Load Tests of Full-Scale Highway Bridges, HR-160, 1973. Transportation, Department of |
| Idioma(s) |
en |
| Relação |
http://publications.iowa.gov/17306/ |
| Palavras-Chave | #Transportation #Bridges and tunnels #Roads and highways #Research #Design and Construction |
| Tipo |
Departmental Report NonPeerReviewed |