1000 resultados para project organizing
Resumo:
This paper presents a biased random-key genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. Active schedules are constructed using a priority-rule heuristic in which the priorities of the activities are defined by the genetic algorithm. A forward-backward improvement procedure is applied to all solutions. The chromosomes supplied by the genetic algorithm are adjusted to reflect the solutions obtained by the improvement procedure. The heuristic is tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
This paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm.
Resumo:
The evolution of new technology and its increasing use, have for some years been making the existence of informal learning more and more transparent, especially among young and older adults in both Higher Education and workplace contexts. However, the nature of formal and non-formal, course-based, approaches to learning has made it hard to accommodate these informal processes satisfactorily, and although technology bring us near to the solution, it has not yet achieved. TRAILER project aims to address this problem by developing a tool for the management of competences and skills acquired through informal learning experiences, both from the perspective of the user and the institution or company. This paper describes the research and development main lines of this project.
Resumo:
Dissertação apresentada como requisito parcial para obtenção do grau de Mestre em Estatística e Gestão de Informação
Resumo:
This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
Este projeto foi realizado na Empresa Fernando Jesus Mourão & Cª Lda, durante o ano de 2012, e teve como objetivo a melhoria do processo produtivo. Esta melhoria assentou na identificação de possíveis pontos de desperdício, no estudo e avaliação de soluções e por fim na definição de propostas de melhoria globais que visem ajustar o fluxo do processo produtivo à procura e simultaneamente minimizar custos operacionais. De forma a atingir estas metas, foi feito um levantamento exaustivo do processo produtivo e das respetivas operações. Neste estudo, apesar do elevado numero de oportunidades de melhoria, foi possível identificar duas áreas que se revelaram criticas e fundamentais para a introdução da filosofia de melhoria continua na empresa. Estas áreas que são o objeto de estudo desta dissertação são: o corte laser e a organização do pavilhão 3. Uma vez identificados as áreas críticas, procedeu-se a uma análise e definição das ações de melhoria a empreender de modo a melhorar o fluxo produtivo e a sua organização, e simultaneamente reduzir custos. Na área de corte laser procurou-se implementar a filosofia de produção “Lean” nomeadamente através da ferramenta de análise PDCA (Plan-Do-Check-Act), como ferramenta auxiliar do estudo para elaborar um plano de ação, implementar as ações, analisar os resultados e procurar a manutenção dos mesmos. Na intervenção do pavilhão 3 foi usada a técnica dos 5S para organizar e agilizar o funcionamento do mesmo. Todo o trabalho assenta na filosofia Lean e nos seus princípios, tendo-se por isso utilizado as ferramentas especificas Lean na concretização das tarefas executadas no seu âmbito. Para medir os resultados, antes e depois das ações implementadas, foi utilizada o indicador de eficiência (Overall Equipment Effectiveness) para o caso do processo de corte laser. Após a implementação das medidas definidas no processo de corte laser foi possível observar uma melhoria do indicador OEE de cerca de 20 por cento. Por outro lado as melhorias implementadas através da ferramenta dos 5S no pavilhão 3, trouxe ganhos visíveis de aumento de produtividade que beneficiaram o tempo de resposta da empresa.
Resumo:
Dissertação apresentada como requisito parcial para obtenção do grau de Mestre em Ciência e Sistemas de Informação Geográfica
Resumo:
Dissertação apresentada como requisito parcial para obtenção do grau de Mestre em Ciência e Sistemas de Informação Geográfica
Resumo:
Volatile organic compounds are a common source of groundwater contamination that can be easily removed by air stripping in columns with random packing and using a counter-current flow between the phases. This work proposes a new methodology for the column design for any particular type of packing and contaminant avoiding the necessity of a pre-defined diameter used in the classical approach. It also renders unnecessary the employment of the graphical Eckert generalized correlation for pressure drop estimates. The hydraulic features are previously chosen as a project criterion and only afterwards the mass transfer phenomena are incorporated, in opposition to conventional approach. The design procedure was translated into a convenient algorithm using C++ as programming language. A column was built in order to test the models used either in the design or in the simulation of the column performance. The experiments were fulfilled using a solution of chloroform in distilled water. Another model was built to simulate the operational performance of the column, both in steady state and in transient conditions. It consists in a system of two partial non linear differential equations (distributed parameters). Nevertheless, when flows are steady, the system became linear, although there is not an evident solution in analytical terms. In steady state the resulting system of ODE can be solved, allowing for the calculation of the concentration profile in both phases inside the column. In transient state the system of PDE was numerically solved by finite differences, after a previous linearization.
Resumo:
International Workshop on solutions that Enhance Informal LEarning Recognition – WEILER 2013
Resumo:
Remote labs offer many unique advantages to students as they provide opportunities to access experiments and learning scenarios that would be otherwise unavailable. At the same time, however, these opportunities introduce real challenges to the institutions hosting the remote labs. This paper draws on the experiences of the REXNET project consortium to expose a number of these issues as a means of furthering the debate on the value of remote labs and the best practices in deploying them. The paper presents a brief outline of the various types of remote lab scenarios that might be deployed. It then describes the key human and technological actors that have an interest in or are intrinsic to a remote lab instance, with a description of the role of each actor and their interest. Some relationships between these various actors are then discussed with some factors that might influence those relationships. Finally some general issues are briefly described.
Resumo:
The European Project Semester at ISEP (EPS@ISEP) is a one semester project-based learning programme addressed to engineering students from diverse scientific backgrounds and nationalities. The students, organized in multicultural teams, are challenged to solve real world multidisciplinary problems, accounting for 30 ECTU. The EPS package, although focused on project development (20 ECTU), includes a series of complementary seminars aimed at fostering soft, project-related and engineering transversal skills (10 ECTU). This paper presents the study plan, resources, operation and results of the EPS@ISEP that was created in 2011 to apply the best engineering education practices and promote the internationalization of ISEP. The results show that the EPS@ISEP students acquire during one semester the scientific, technical and soft competences necessary to propose, design and implement a solution for a multidisciplinary problem.
Resumo:
Trabalho de Projeto apresentado ao Instituto Superior de Contabilidade e Administração do Porto para a obtenção do grau de Mestre em Marketing Digital, sob orientação do Mestre António da Silva Vieira
Resumo:
Os programas de melhoria contínua dos processos são cada vez mais a aposta das empresas para fazer face ao mercado. Através da implementação destes programas é possível conferir simplicidade e padronização aos processos e consequentemente reduzir os custos com desperdícios internos relacionados com a qualidade dos mesmos. As ferramentas de melhoria da qualidade e as ferramentas associadas ao Lean Thinking representam um pilar importante no sucesso de qualquer programa de melhoria contínua dos processos. Estas ferramentas constituem meios úteis na análise, controlo, organização de dados importantes para a correta tomada de decisão nas organizações. O presente projeto tem como principal objetivo a conceção e implementação de um programa de melhoria da qualidade na Eurico Ferreira, S.A., tendo por base a avaliação da satisfação do cliente e a aplicação dos 5S. Neste contexto, o trabalho teve como fundamentação teórica a Gestão da Qualidade, Lean Thinking e algumas ferramentas de ambas as matérias. Posteriormente foi selecionada a área de negócio da empresa a abordar. Após a seleção, realizou-se um diagnóstico inicial do processo identificando os diversos pontos de melhoria onde foram aplicadas algumas ferramentas do Lean Thinking, nomeadamente o Value Stream Mapping e a metodologia 5S. Com a primeira foi possível construir um mapa do estado atual do processo, no qual estavam representados todos os intervenientes assim como o fluxo de materiais e de informação ao longo do processo. A metodologia 5S permitiu atuar sobre os desperdícios, identificando e implementando diversas melhorias no processo. Concluiu-se que a implementação das ferramentas contribuiu eficientemente para a melhoria contínua da qualidade nos processos, tendo sido decisão da coordenação alargar o âmbito do projeto aos restantes armazéns do centro logístico da empresa. Pode afirmar-se com recurso à satisfação do cliente expressa através da evolução favorável do Service-level agreement que as ferramentas implementadas têm gerado resultados muito positivos no curto prazo.
Resumo:
Current engineering education challenges require approaches that promote scientific, technical, design and complementary skills while fostering autonomy, innovation and responsibility. The European Project Semester (EPS) at Instituto Superior de Engenharia do Porto (ISEP) (EPS@ISEP) is a one semester project-based learning programme (30 European Credit Transfer Units (ECTU)) for engineering students from diverse scientific backgrounds and nationalities that intends to address these goals. The students, organised in multidisciplinary and multicultural teams, are challenged to solve real multidisciplinary problems during one semester. The EPS package, although on project development (20 ECTU), includes a series of complementary seminars aimed at fostering soft, project-related and engineering transversal skills (10 ECTU). Hence, the students enrolled in this programme improve their transversal skills and learn, together and with the team of supervisors, subjects distinct from their core training. This paper presents the structure, implementation and results of the EPS@ISEP that was created in 2011 to apply the best engineering practices and promote internationalisation and engineering education innovation at ISEP.