885 resultados para Projects in dispute
                                
Resumo:
From an analysis of a learning model based on the theory of information processing four hypothesis were developed for improving the design of laboratory courses. Three of these hypotheses concerned specific procedures to minimise the load on students' working memories (or working spaces) and the fourth hypothesis was concerned with the value of mini-projects in enhancing meaningful learning of the knowledge and skills underpinning the set experiments. A three-year study of a first year undergraduate chemistry laboratory course at a Scottish university has been carried out to test these four hypotheses. This paper reports the results of the study relevant to the three hypotheses about the burden on students' working spaces. It was predicted from the learning model that the load on students working space should be reduced by appropriate changes to the written instructions and the laboratory organisation and by the introduction of prelab-work and prelab-training in laboratory techniques. It was concluded from research conducted over the three years period that all these hypothesised changes were effective both in reducing the load on students' working spaces and in improving their attitudes to the laboratory course.
                                
Resumo:
The main aim of this study was to develop the project management framework model which would serve as the new model to follow for upcoming projects at the Lappeenranta cement plant. The other goal was to execute the SNCR (selective non catalytic reduction) project successfully so that the nitrogen oxides emissions are below the stated emission limit when the new emission limit comes into effect beginning in July, 2008. Nitrogen oxides, project management aspects, SNCR and the invested system are explained in the theory part. In the practical part of the study, the SNCR project in the Lappeenranta cement plant was executed and the findings were documented. In order to reach the aim of this study, a framework of project management was made. The framework is based on the executed SNCR project, previous projects in the cement plant and on the available literature relating to the subject matter. The developed project turned out to be successful.
                                
Resumo:
The purpose of this paper is to show the perceptions of the academic staff of classical languages (ancient Greek and Latin) concerning use of online activities during their courses. The study was carried out in three countries: Greece (three major Universities), Spain (University of Barcelona) and the United States (University of California, Berkeley) with the participation of thirty-three academic instructors. Depending on the level of use and acceptance of the ICT and following G. Moore¿s classification, we separated the participating academics in three groups: the conservatives, the mainstream and the early adopters. The fact that the smallest group is the third clearly shows the necessity for teachers¿ preparation and training before introducing innovative projects in the classroom. Since the starting point for the application of innovation in the classroom is the teacher, policy makers should focus on helping them become conscious of changes in teaching methods and include their opinion during the design of innovative projects.
                                
Resumo:
The purpose of this paper is to show the perceptions of the academic staff of classical languages (ancient Greek and Latin) concerning use of online activities during their courses. The study was carried out in three countries: Greece (three major Universities), Spain (University of Barcelona) and the United States (University of California, Berkeley) with the participation of thirty-three academic instructors. Depending on the level of use and acceptance of the ICT and following G. Moore¿s classification, we separated the participating academics in three groups: the conservatives, the mainstream and the early adopters. The fact that the smallest group is the third clearly shows the necessity for teachers¿ preparation and training before introducing innovative projects in the classroom. Since the starting point for the application of innovation in the classroom is the teacher, policy makers should focus on helping them become conscious of changes in teaching methods and include their opinion during the design of innovative projects.
                                
Resumo:
Workflow management systems aim at the controlled execution of complex application processes in distributed and heterogeneous environments. These systems will shape the structure of information systems in business and non-business environments. E business and system integration is a fertile soil for WF and groupware tools. This thesis aims to study WF and groupware tools in order to gather in house knowledge of WF to better utilize WF solutions in future, and to focus on SAP Business Workflow in order to find a global solution for Application Link Enabling support for system integration. Piloting this solution in Nokia collects the experience of SAP R/3 WF tool for other development projects in future. The literary part of this study will guide to the world of business process automation providing a general description of the history, use and potentials of WF & groupware software. The empirical part of this study begins with the background of the case study describing the IT environment initiating the case by introducing SAP R/3 in Nokia, the communication technique in use and WF tool. Case study is focused in one solution with SAP Business Workflow. This study provides a concept to monitor communication between ERP systems and to increase the quality of system integration. Case study describes a way create support model for ALE/EDI interfaces. Support model includes monitoring organization and the workflow processes to solve the most common IDoc related errors.
                                
Resumo:
ABSTRACT In Brazil, specifically in São Paulo State, there are guidelines based on the high diversity of tropical forests that instructs the restoration projects in the state (current SMA 32/2014). The main goal of this study was verify the importance and effectiveness of the high diversity of arboreal species originated from a reforestation, and its influence in a woody regenerating composition. We developed a phytosociologic study in a woody regenerating stratum of a nine year old reforestation at a Private Reserve of Natural Heritage (RPPN), in Mogi-Guaçu, São Paulo State. All specimens with height > 30 cm and Diameter at Breast Height (DBH) < 5 cm were evaluated. The woody regenerating diversity was smaller than the overstory diversity and the species composition was similar to the overstory. The Simpson index (1-D) was 0.85, Shannon index (H') was 2.46 and the Pielou index (J') was 0.60. The zoochoric dispersion syndrome was major among the species. Our results suggest that the use of high diversity of native seedlings in a reforestation leads to high diversity of species in woody regeneration stratum, after one decade of planting.
                                
Resumo:
Open source and open source software development have been interesting phenomena during the past decade. Traditional business models do not apply with open source, where the actual product is free. However, it is possible to make business with open source, even successfully, but the question is: how? The aim of this study is to find the key factors of successfully making business out of commercial open source software development. The task is achieved by finding the factors that influence open source projects, finding the relation between those factors, and find out why some factors explain the success more than others. The literature review concentrates first on background of open innovation, open source and open source software. Then business models, critical success factors and success measures are examined. Based on existing literature a framework was created. The framework contains categorized success factors that influence software projects in general as well as open source software projects. The main categories of success factors in software business are divided into community management, technology management, project management and market management. In order to find out which of the factors based on the existing literature are the most critical, empirical research was done by conducting unstructured personal interviews. The main finding based on the interviews is that the critical success factors in open source software business do not differ from those in traditional software business or in fact from those in any other business. Some factors in the framework came out in the interviews that can be considered as key factors: establishing and communicating hierarchy (community management), localization (technology management), good license know-how and IPR management (project management), and effective market management (market management). The critical success factors according to the interviewees are not listed in the framework: low price, good product and good business model development.
                                
Resumo:
According to several surveys and observations, the percentage of successfully conducted IT projects without over-budgeting and delays in time schedule are extremely low. Many projects also are evaluated as failures in terms of delivered functionality. Nuldén (1996) compares IT projects with bad movies; after watching for 2 hours, one still tries to finish it even though one understands that it is a complete waste of time. The argument for that is 'I've already invested too much time to terminate it now'. The same happens with IT projects: sometimes the company continues wasting money on these projects for a long time, even though there are no expected benefits from these projects. Eventually these projects are terminated anyway, but until this moment, the company spends a lot. The situation described above is a consequence of “escalation of commitment” - project continuation even after a manager receives negative feedback of the project’s success probability. According to Keil and Mähring (2010), even though escalation can occur in any type of project, it is more common among complex technological projects, such as IT projects. Escalation of commitment very often results in runaway projects. In order to avoid it, managers use de-escalation strategies, which allow the resources to be used in more effective. These strategies lead to project termination or turning around, which stops the flow of wasted investments. Numbers of researches explore escalation of commitment phenomena based on experiments and business cases. Moreover, during the last decade several frameworks were proposed for de-escalation strategy. However, there is no evidence of successful implementation of the de-escalation of commitment strategy in the literature. In addition, despite that fact that IT project management methodologies are widely used in the companies, none of them cover the topic of escalation of commitment risks. At the same time, there are no researches proposing the way to implement de-escalation of commitment strategy into the existing project management methodology The research is focused on a single case of large ERP implementation project by the consulting company. Hence, the main deliverables of the study include suggestions of improvement in de-escalation methods and techniques in the project and in the company. Moreover, the way to implement these methods into existing project management methodology and into the company general policies is found.
                                
Resumo:
With information technology (IT) playing an increasing important role in driving the business, the value of IT investment is often challenged because not all of those investment decisions are made in a reasonable way or aligned with business strategies. IT investment portfolio management (PfM) is an effective way to prioritize and select the right IT projects to invest in, by taking all the project proposals into consideration as a whole, based on their business value, risks, costs, and interrelationships. There are different decision models to prioritise projects, and the Analytic Hierarchy Process (AHP) is one of the most commonly-used methods and is discussed in this master thesis. At the same time, there are IT projects on different levels for a multinational company, from global to local. For instance, many of them are probably proposed by joint ventures on local level. In the oil & gas industry, joint ventures are often formed especially in the area of the upstream (exploration & production). How to involve those projects into the IT investment PfM approach of the parent company is a challenge, because the parent company cannot make the decisions on its own. It needs to prioritize all projects in an adequate way, communicate with JVs and influence them. Also, different control levels on JVs need to be considered. This paper hence attempts to introduce a tailored approach of IT investment PfM for a multinational oil & gas company to address the issues around JVs.
                                
Resumo:
This thesis examines partnerships in sustainable urban development projects. Achievement of urban development requires the involvement of several parties. The cooperation of the actors of sustainable urban development is achieved by forming partnerships. The purpose of this study is to find solutions and best practices for the management of partnerships in sustainable residential development projects by examining partnerships and their success factors in sustainable urban development. The impact of the roles, responsibilities and interactions of actors taking part in the processes of creating sustainable urban development in outcomes of these development projects and thus on the overall success of accomplishing sustainable development raises the question of how to manage these collaborations. In order to be able to find the best ways of organizing sustainable urban development projects, it is crucial to have the knowledge of how the interactions between all the parties involved in the development can be managed successfully to give the best outcomes. The main research question of this study is: What are the characteristics of successful partnerships in sustainable urban development projects? In order to answer this question, the success factors in partnerships between actors of sustainable urban development are analyzed. In addition, challenges related to these partnerships are examined to get a more comprehensive view of the features of these collaborative ventures and the obstacles that have to be overcome to ensure the successfulness of cooperation. The research approach is multiple case study comprising four cases. The empirical data has been gathered through theme interviews from four different sustainable residential district projects in Sweden and Finland. A comparative analysis of the cases is performed, based on which seven success factors of partnerships in sustainable urban development supported by the prevailing theories are formulated. In addition, challenges faced by projects regarding the partnerships are discussed.
                                
Resumo:
The objective of this Master’s Thesis was to research factors influencing and enhancing individual level knowledge sharing in offshore projects which often involve uncertainty of the knowledge provider’s own future. The purpose was to understand why individuals are willing to share their knowledge under these kinds of circumstances. In addition the goal was to identify obstacles to interpersonal knowledge sharing in order to understand how to mitigate their influence. The research was conducted as a qualitative multiple case study in a global IT company, and the data was gathered using semi-structured personal theme interviews within two different offshore projects. In order to a gain a wider perspective on the matter, some management representatives were interviewed as well. Data was analysed with the inductive content analysis method. Results of the study indicate that individuals are willing to share their knowledge despite of uncertainty if they are motivated, if they are provided with opportunities to do so, and if they have skills, competence and experience to share their knowledge. A strong knowledge sharing culture in the organization or team also works as a strong incentive for individual level knowledge sharing. The findings suggest that even under uncertain conditions it is possible to encourage people to share their knowledge if uncertainty can be decreased to a bearable level, a robust and personal connection and relationship between the knowledge provider and acquirer can be created and suitable opportunities for knowledge sharing are provided. In addition, based on the results the support and commitment of management and HR in addition to favourable environmental circumstances play an essential role in building a bridge between the knowledge provider and acquirer in order to create a virtual environment and space for knowledge sharing: Ba.
                                
Resumo:
The objective of this thesis was to form an understanding about the common gaps in learning from projects, as well as possible approaches to bridging them. In the research focus were the questions on how project teams create knowledge, which fac- tors affect the capture and re-use of this knowledge and how organizations can best capture and utilize this project-based knowledge. The method used was qualitative metasummary, a literature-based research method that has previously been mainly applied in the domains of nursing and health care research. The focus was laid on firms conducting knowledge-intensive business in some form of matrix organization. The research produced a theoretical model of knowledge creation in projects as well as a typology of factors affecting transfer of project-based knowledge. These include experience, culture and leadership, planning and controlling, relationships, project review and documentation. From these factors, suggestions could be derived as to how organizations should conduct projects in order not to lose what has been learned.
                                
Resumo:
This work focuses on the 159.5 kW solar photovoltaic power plant project installed at the Lappeenranta University of Technology in 2013 as an example of what a solar plant project could be in Finland. The project consists of a two row carport and a flat roof installation on the roof of the university laboratories. The purpose of this project is not only its obvious energy savings potential but also to serve as research and teaching laboratory tool. By 2013, there were not many large scale solar power plants in Finland. For this reason, the installation and data experience from the solar power plant at LUT has brought valuable information for similar projects in northern countries. This work includes a first part for the design and acquisition of the project to continue explaining about the components and their installation. At the end, energy produced by this solar power plant is studied and calculated to find out some relevant economical results. For this, the radiation arriving to southern Finland, the losses of the system in cold weather and the impact of snow among other aspects are taken into account.
                                
Resumo:
The investments have always been considered as an essential backbone and so-called ‘locomotive’ for the competitive economies. However, in various countries, the state has been put under tight budget constraints for the investments in capital intensive projects. In response to this situation, the cooperation between public and private sector has grown based on public-private mechanism. The promotion of favorable arrangement for collaboration between public and private sectors for the provision of policies, services, and infrastructure in Russia can help to address the problems of dry ports development that neither municipalities nor the private sector can solve alone. Especially, the stimulation of public-private collaboration is significant under the exposure to externalities that affect the magnitude of the risks during all phases of project realization. In these circumstances, the risk in the projects also is becoming increasingly a part of joint research and risk management practice, which is viewed as a key approach, aiming to take active actions on existing global and specific factors of uncertainties. Meanwhile, a relatively little progress has been made on the inclusion of the resilience aspects into the planning process of a dry ports construction that would instruct the capacity planner, on how to mitigate the occurrence of disruptions that may lead to million dollars of losses due to the deviation of the future cash flows from the expected financial flows on the project. The current experience shows that the existing methodological base is developed fragmentary within separate steps of supply chain risk management (SCRM) processes: risk identification, risk evaluation, risk mitigation, risk monitoring and control phases. The lack of the systematic approach hinders the solution of the problem of risk management processes of dry port implementation. Therefore, management of various risks during the investments phases of dry port projects still presents a considerable challenge from the practical and theoretical points of view. In this regard, the given research became a logical continuation of fundamental research, existing in the financial models and theories (e.g., capital asset pricing model and real option theory), as well as provided a complementation for the portfolio theory. The goal of the current study is in the design of methods and models for the facilitation of dry port implementation through the mechanism of public-private partnership on the national market that implies the necessity to mitigate, first and foremost, the shortage of the investments and consequences of risks. The problem of the research was formulated on the ground of the identified contradictions. They rose as a continuation of the trade-off between the opportunities that the investors can gain from the development of terminal business in Russia (i.e. dry port implementation) and risks. As a rule, the higher the investment risk, the greater should be their expected return. However, investors have a different tolerance for the risks. That is why it would be advisable to find an optimum investment. In the given study, the optimum relates to the search for the efficient portfolio, which can provide satisfaction to the investor, depending on its degree of risk aversion. There are many theories and methods in finance, concerning investment choices. Nevertheless, the appropriateness and effectiveness of particular methods should be considered with the allowance of the specifics of the investment projects. For example, the investments in dry ports imply not only the lump sum of financial inflows, but also the long-term payback periods. As a result, capital intensity and longevity of their construction determine the necessity from investors to ensure the return on investment (profitability), along with the rapid return on investment (liquidity), without precluding the fact that the stochastic nature of the project environment is hardly described by the formula-based approach. The current theoretical base for the economic appraisals of the dry port projects more often perceives net present value (NPV) as a technique superior to other decision-making criteria. For example, the portfolio theory, which considers different risk preference of an investor and structures of utility, defines net present value as a better criterion of project appraisal than discounted payback period (DPP). Meanwhile, in business practice, the DPP is more popular. Knowing that the NPV is based on the assumptions of certainty of project life, it cannot be an accurate appraisal approach alone to determine whether or not the project should be accepted for the approval in the environment that is not without of uncertainties. In order to reflect the period or the project’s useful life that is exposed to risks due to changes in political, operational, and financial factors, the second capital budgeting criterion – discounted payback period is profoundly important, particularly for the Russian environment. Those statements represent contradictions that exist in the theory and practice of the applied science. Therefore, it would be desirable to relax the assumptions of portfolio theory and regard DPP as not fewer relevant appraisal approach for the assessment of the investment and risk measure. At the same time, the rationality of the use of both project performance criteria depends on the methods and models, with the help of which these appraisal approaches are calculated in feasibility studies. The deterministic methods cannot ensure the required precision of the results, while the stochastic models guarantee the sufficient level of the accuracy and reliability of the obtained results, providing that the risks are properly identified, evaluated, and mitigated. Otherwise, the project performance indicators may not be confirmed during the phase of project realization. For instance, the economic and political instability can result in the undoing of hard-earned gains, leading to the need for the attraction of the additional finances for the project. The sources of the alternative investments, as well as supportive mitigation strategies, can be studied during the initial phases of project development. During this period, the effectiveness of the investments undertakings can also be improved by the inclusion of the various investors, e.g. Russian Railways’ enterprises and other private companies in the dry port projects. However, the evaluation of the effectiveness of the participation of different investors in the project lack the methods and models that would permit doing the particular feasibility study, foreseeing the quantitative characteristics of risks and their mitigation strategies, which can meet the tolerance of the investors to the risks. For this reason, the research proposes a combination of Monte Carlo method, discounted cash flow technique, the theory of real options, and portfolio theory via a system dynamics simulation approach. The use of this methodology allows for comprehensive risk management process of dry port development to cover all aspects of risk identification, risk evaluation, risk mitigation, risk monitoring, and control phases. A designed system dynamics model can be recommended for the decision-makers on the dry port projects that are financed via a public-private partnership. It permits investors to make a decision appraisal based on random variables of net present value and discounted payback period, depending on different risks factors, e.g. revenue risks, land acquisition risks, traffic volume risks, construction hazards, and political risks. In this case, the statistical mean is used for the explication of the expected value of the DPP and NPV; the standard deviation is proposed as a characteristic of risks, while the elasticity coefficient is applied for rating of risks. Additionally, the risk of failure of project investments and guaranteed recoupment of capital investment can be considered with the help of the model. On the whole, the application of these modern methods of simulation creates preconditions for the controlling of the process of dry port development, i.e. making managerial changes and identifying the most stable parameters that contribute to the optimal alternative scenarios of the project realization in the uncertain environment. System dynamics model allows analyzing the interactions in the most complex mechanism of risk management process of the dry ports development and making proposals for the improvement of the effectiveness of the investments via an estimation of different risk management strategies. For the comparison and ranking of these alternatives in their order of preference to the investor, the proposed indicators of the efficiency of the investments, concerning the NPV, DPP, and coefficient of variation, can be used. Thus, rational investors, who averse to taking increased risks unless they are compensated by the commensurate increase in the expected utility of a risky prospect of dry port development, can be guided by the deduced marginal utility of investments. It is computed on the ground of the results from the system dynamics model. In conclusion, the outlined theoretical and practical implications for the management of risks, which are the key characteristics of public-private partnerships, can help analysts and planning managers in budget decision-making, substantially alleviating the effect from various risks and avoiding unnecessary cost overruns in dry port projects.
                                
Resumo:
Wind power is a rapidly developing, low-emission form of energy production. In Fin-land, the official objective is to increase wind power capacity from the current 1 005 MW up to 3 500–4 000 MW by 2025. By the end of April 2015, the total capacity of all wind power project being planned in Finland had surpassed 11 000 MW. As the amount of projects in Finland is record high, an increasing amount of infrastructure is also being planned and constructed. Traditionally, these planning operations are conducted using manual and labor-intensive work methods that are prone to subjectivity. This study introduces a GIS-based methodology for determining optimal paths to sup-port the planning of onshore wind park infrastructure alignment in Nordanå-Lövböle wind park located on the island of Kemiönsaari in Southwest Finland. The presented methodology utilizes a least-cost path (LCP) algorithm for searching of optimal paths within a high resolution real-world terrain dataset derived from airborne lidar scannings. In addition, planning data is used to provide a realistic planning framework for the anal-ysis. In order to produce realistic results, the physiographic and planning datasets are standardized and weighted according to qualitative suitability assessments by utilizing methods and practices offered by multi-criteria evaluation (MCE). The results are pre-sented as scenarios to correspond various different planning objectives. Finally, the methodology is documented by using tools of Business Process Management (BPM). The results show that the presented methodology can be effectively used to search and identify extensive, 20 to 35 kilometers long networks of paths that correspond to certain optimization objectives in the study area. The utilization of high-resolution terrain data produces a more objective and more detailed path alignment plan. This study demon-strates that the presented methodology can be practically applied to support a wind power infrastructure alignment planning process. The six-phase structure of the method-ology allows straightforward incorporation of different optimization objectives. The methodology responds well to combining quantitative and qualitative data. Additional-ly, the careful documentation presents an example of how the methodology can be eval-uated and developed as a business process. This thesis also shows that more emphasis on the research of algorithm-based, more objective methods for the planning of infrastruc-ture alignment is desirable, as technological development has only recently started to realize the potential of these computational methods.
 
                    