919 resultados para OPM3 (Organizational Project Management Model Maturity)
Resumo:
In R&D organizations multiple projects are executed concurrently. Problems arises in managing shared resources since they are needed by multiple projects simultaneously. The objective of this thesis was to study how the project and resource management could be developed in a public sector R&D organization. The qualitative research was carried out in the Magnetic Measurements section at CERN where the section measures magnets for particle accelerators and builds state of the art measurement devices for various needs. Hence, the R&D and measurement projects are very time consuming and very complex. Based on the previous research and the requirements from the organization the best alter- native for resource management was to build a project management information system. A centralized database was constructed and on top of it was built an application for interacting and visualizing the project data. The application allows handling project data, which works as a basis for resource planning before and during the projects are executed. It is one way to standardize the work-flow of projects, which strengthens the project process. Additionally, it was noted that the inner customer’s database, the measurement system and the new application needed to be integrated. Further integration ensures that the project data is received efficiently from customers and available not only within the application but also during the concrete work. The research results introduced a new integrated application, which centralizes the project information flow with better visibility.
Resumo:
The purpose of this thesis is to explore a different kind of digital content management model and to propose a process in order to manage properly the content on an organization’s website. This process also defines briefly the roles and responsibilities of the different actors implicated. In order to create this process, the thesis has been divided into two parts. First, the theoretical analysis helps to find the two main different content management models, content management adaptation and content management localization model. Each of these models, have been analyzed through a SWOT model in order to identify their particularities and which of them is the best option according to particular organizational objectives. In the empirical part, this thesis has measured the organizational website performance comparing two main data. On one hand, the international website is analyzed in order to identify the results of the content management standardization. On the other hand, content management adaptation, also called content management localization model, is analyzed by looking through the key measure of the Dutch page from the same organization. The resulted output is a process model for localization as well as recommendations on how to proceed when creating a digital content management strategy. However, more research is recommended to provide more comprehensive managerial solutions.
Resumo:
This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.
Resumo:
The case company in this study is a large industrial engineering company whose business is largely based on delivering a wide-range of engineering projects. The aim of this study is to create and develop a fairly simple Excel-based tool for the sales department. The tool’s main function is to estimate and visualize the profitability of various small projects. The study also aims to find out other possible and more long-term solutions for tackling the problem in the future. The study is highly constructive and descriptive as it focuses on the development task and in the creation of a new operating model. The developed tool focuses on estimating the profitability of the small orders of the selected project portfolio currently on the bidding-phase (prospects) and will help the case company in the monthly reporting of sales figures. The tool will analyse the profitability of a certain project by calculating its fixed and variable costs, then further the gross margin and operating profit. The bidding phase of small project is a phase that has not been covered fully by the existing tools within the case company. The project portfolio tool can be taken into use immediately within the case company and it will provide fairly accurate estimate of the profitability figures of the recently sold small projects.
Resumo:
This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.
Resumo:
The Chinese welding industry is growing every year due to rapid development of the Chinese economy. Increasingly, companies around the world are looking to use Chinese enterprises as their cooperation partners. However, the Chinese welding industry also has its weaknesses, such as relatively low quality and weak management. A modern, advanced welding management system appropriate for local socio-economic conditions is required to enable Chinese enterprises to enhance further their business development. The thesis researches the design and implementation of a new welding quality management system for China. This new system is called ‗welding production quality control management model in China‘ (WQMC). Constructed on the basis of analysis of a survey and in-company interviews, the welding management system comprises the following different elements and perspectives: a ‗Localized congenital existing problem resolution strategies‘ (LCEPRS) database, a ‗human factor designed training system‘ (HFDT) training strategy, the theory of modular design, ISO 3834 requirements, total welding management (TWM), and lean manufacturing (LEAN) theory. The methods used in the research are literature review, questionnaires, interviews, and the author‘s model design experiences and observations, i.e. the approach is primarily qualitative and phenomenological. The thesis describes the design and implementation of a HFDT strategy in Chinese welding companies. Such training is an effective way to increase employees‘ awareness of quality and issues associated with quality assurance. The study identified widely existing problems in the Chinese welding industry and constructed a LCEPRS database that can be used in efforts to mitigate and avoid common problems. The work uses the theory of modular design, TWM and LEAN as tools for the implementation of the WQMC system.
Resumo:
Ce rapport de recherche porte sur une étude s’intéressant au transfert des connaissances tacites chez les gestionnaires, c’est-à-dire le partage de ces connaissances et leur utilisation informelle, durant une situation de coordination dans un service municipal. La thèse est articulée autour des questions suivantes : Quelles sont les situations de coordination vécues par les gestionnaires municipaux? Quelles sont les sources de connaissances tacites partagées et utilisées? Quelles sont les relations de connaissances mobilisées de façon informelle lors du transfert des connaissances tacites? Quels sont les facteurs encourageant ou inhibant le transfert informel des connaissances tacites? À partir d’un modèle basé sur une approche situationnelle (Taylor, 1989 et 1991), nous avons revu la documentation touchant nos questions de recherche. Nous avons défini notamment la récursivité des connaissances et le réseau de connaissances, de même que présenté le modèle de la conversion des connaissances (Nonaka, 1994) et celui de l’actualisation de soi (St-Arnaud, 1996). Nous avons questionné 22 répondants à l’aide d’instruments de mesure qui combinent les techniques de l’incident critique, de l’entrevue cognitive et réflexive, le questionnement sur les réseaux organisationnels et l’observation participante. Tels des filets, ces instruments ont permis de traquer et d’obtenir des données d’une grande richesse sur les connaissances tacites et les comportements informels durant le transfert de connaissances en situation de coordination. Ces données ont été analysées selon une approche méthodologique essentiellement qualitative combinant l’analyse de contenu, la schématisation heuristique et l’analyse des réseaux sociaux. Nos résultats montrent que la complexité d’une situation de coordination conditionne le choix des mécanismes de coordination. De plus, les sources de connaissances sont, du point de vue individuel, le gestionnaire et ses artefacts, de même que son réseau personnel avec ses propres artefacts. Du point de vue collectif, ces sources sont réifiées dans le réseau de connaissances. Les connaissances clés d’une situation de coordination sont celles sur le réseau organisationnel, le contexte, les expériences en gestion et en situation complexe de coordination, la capacité de communiquer, de négocier, d’innover et celle d’attirer l’attention. Individuellement, les gestionnaires privilégient l’actualisation de soi, l’autoformation et la formation contextualisée et, collectivement, la coprésence dans l’action, le réseautage et l’accompagnement. Cette étude fournit un modèle valide du transfert contextualisé des connaissances qui est un cas de coordination complexe d’activités en gestion des connaissances. Ce transfert est concomitant à d’autres situations de coordination. La nature tacite des connaissances prévaut, de même que le mode informel, les médias personnels et les mécanismes d’ajustement mutuel. Les connaissances tacites sont principalement transférées au début des processus de gestion de projet et continuellement durant la rétroaction et le suivi des résultats. Quant aux connaissances explicites, les gestionnaires les utilisent principalement comme un symbole à la fin des processus de gestion de projet. Parmi les personnes et les groupes de personnes d’une situation de transfert contextualisé des connaissances, 10 % jouent des rôles clés, soit ceux d’experts et d’intermédiaires de personnes et d’artefacts. Les personnes en périphérie possèdent un potentiel de structuration, c’est-à-dire de connexité, pour assurer la continuité du réseau de connaissances organisationnel. Notre étude a élargi le modèle général de la complexité d’une situation (Bystrom, 1999; Choo, 2006; Taylor, 1986 et 1991), la théorie de la coordination (Malone et Crowston, 1994), le modèle de la conversion des connaissances (Nonaka, 1994), celui de l’actualisation de soi (St-Arnaud, 1996) et la théorie des réseaux de connaissances (Monge et Contractor, 2003). Notre modèle réaffirme la concomitance de ces modèles généraux selon une approche constructiviste (Giddens, 1987) où la dualité du structurel et la compétence des acteurs sont confirmées et enrichies.
Resumo:
Die Dissertation befasst sich mit der Einführung komplexer Softwaresysteme, die, bestehend aus einer Kombination aus parametrisierter Standardsoftware gepaart mit Wettbewerbsvorteil sichernden Individualsoftwarekomponenten, keine Software-Engineering-Projekte im klassischen Sinn mehr darstellen, sondern einer strategieorientierten Gestaltung von Geschäftsprozessen und deren Implementierung in Softwaresystemen bedürfen. Die Problemstellung einer adäquaten Abwägung zwischen TCO-optimierender Einführung und einer gleichzeitigen vollständigen Unterstützung der kritischen Erfolgsfaktoren des Unternehmens ist hierbei von besonderer Bedeutung. Der Einsatz integrierter betriebswirtschaftlicher Standardsoftware, mit den Möglichkeiten einer TCO-Senkung, jedoch ebenfalls der Gefahr eines Verlustes von Alleinstellungsmerkmalen am Markt durch Vereinheitlichungstendenzen, stellt ein in Einführungsprojekten wesentliches zu lösendes Problem dar, um Suboptima zu vermeiden. Die Verwendung von Vorgehensmodellen, die sich oftmals an klassischen Softwareentwicklungsprojekten orientieren oder vereinfachte Phasenmodelle für das Projektmanagement darstellen, bedingt eine fehlende Situationsadäquanz in den Detailsituationen der Teilprojekte eines komplexen Einführungsprojektes. Das in dieser Arbeit entwickelte generische Vorgehensmodell zur strategieorientierten und partizipativen Einführung komplexer Softwaresysteme im betriebswirtschaftlichen Anwendungsbereich macht - aufgrund der besonders herausgearbeiteten Ansätze zu einer strategieorientierten Einführung, respektive Entwicklung derartiger Systeme sowie aufgrund der situationsadäquaten Vorgehensstrategien im Rahmen der Teilprojektorganisation � ein Softwareeinführungsprojekt zu einem Wettbewerbsfaktor stärkenden, strategischen Element im Unternehmen. Die in der Dissertation diskutierten Überlegungen lassen eine Vorgehensweise präferieren, die eine enge Verschmelzung des Projektes zur Organisationsoptimierung mit dem Softwareimplementierungsprozess impliziert. Eine Priorisierung der Geschäftsprozesse mit dem Ziel, zum einen bei Prozessen mit hoher wettbewerbsseitiger Priorität ein organisatorisches Suboptimum zu vermeiden und zum anderen trotzdem den organisatorischen Gestaltungs- und den Systemimplementierungsprozess schnell und ressourcenschonend durchzuführen, ist ein wesentliches Ergebnis der Ausarbeitungen. Zusätzlich führt die Ausgrenzung weiterer Prozesse vom Einführungsvorgang zunächst zu einem Produktivsystem, welches das Unternehmen in den wesentlichen Punkten abdeckt, das aber ebenso in späteren Projektschritten zu einem System erweitert werden kann, welches eine umfassende Funktionalität besitzt. Hieraus ergeben sich Möglichkeiten, strategischen Anforderungen an ein modernes Informationssystem, das die kritischen Erfolgsfaktoren eines Unternehmens konsequent unterstützen muss, gerecht zu werden und gleichzeitig ein so weit als möglich ressourcenschonendes, weil die Kostenreduktionsaspekte einer Standardlösung nutzend, Projekt durchzuführen. Ein weiterer wesentlicher Aspekt ist die situationsadäquate Modellinstanziierung, also die projektspezifische Anpassung des Vorgehensmodells sowie die situationsadäquate Wahl der Vorgehensweisen in Teilprojekten und dadurch Nutzung der Vorteile der verschiedenen Vorgehensstrategien beim konkreten Projektmanagement. Der Notwendigkeit der Entwicklung einer Projektorganisation für prototypingorientiertes Vorgehen wird in diesem Zusammenhang ebenfalls Rechnung getragen. Die Notwendigkeit der Unternehmen, sich einerseits mit starken Differenzierungspotenzialen am Markt hervorzuheben und andererseits bei ständig sinkenden Margen einer Kostenoptimierung nachzukommen, lässt auch in Zukunft das entwickelte Modell als erfolgreich erscheinen. Hinzu kommt die Tendenz zu Best-Of-Breed-Ansätzen und komponentenbasierten Systemen im Rahmen der Softwareauswahl, die eine ausgesprochen differenzierte Vorgehensweise in Projekten verstärkt notwendig machen wird. Durch die in das entwickelte Modell integrierten Prototyping-Ansätze wird der auch in Zukunft an Bedeutung gewinnenden Notwendigkeit der Anwenderintegration Rechnung getragen.
Resumo:
Actualmente se considera que las organizaciones con resultados positivos y rendimientos crecientes tienen aspectos y características particulares que las diferencian de aquellas organizaciones que no obtienen los mejores resultados en el mercado. Para que las organizaciones sean saludables deben garantizar el bienestar del empleado y comprometerse con el mejoramiento continuo del mismo. Es así como surgen las escalas de medidas de bienestar, las cuales contribuyen directamente al bienestar del empleado y sus resultados positivos dentro de la organización. Este estudio hace referencia a las medidas de bienestar más utilizadas en un periodo de diez años (2002-2012), con el propósito de establecer la relación entre las medidas de bienestar, el bienestar de los empleados y las organizaciones saludables. Para determinar dicha relación, se llevó a cabo un análisis detallado de los estudios realizados sobre las escalas de medidas de bienestar utilizadas durante el periodo de tiempo 2002 y 2012. Los resultados arrojados señalan que las medidas de bienestar más utilizadas durante este periodo son: Satisfacción laboral, Clima organizacional, Engagement y Calidad de vida laboral, mientras que las cuatro medidas de bienestar menos utilizadas son: Remuneración y Bienestar subjetivo.
Resumo:
Este proyecto busca determinar que utilización se hace de los conceptos de caos y complejidad en las empresas del sector financiero colombiano, para así encontrar la relación entre estos conceptos y la ocurrencia de eventos en la economía actual. Se adoptó un método descriptivo, donde se tomará como unidad de análisis una empresa representativa del sector financiero de Colombia. La compañía escogida para el análisis fue Bancolombia, la cual debido a su larga trayectoria dentro de la economía colombiana, ha demostrado un buen desempeño y el logro de sus objetivos a nivel nacional e internacional. El análisis realizado permitió tener una visión amplia y representativa del significado que el caos y la complejidad tienen para el sector financiero; y como sus respectivos conceptos se aplican a la hora de enfrentar condiciones extremas en la industria o la economía. Pero también como el comportamiento de variables pertenecientes a otras industrias, tienen la capacidad de afectar e influir en el normal comportamiento de la compañía. Se concluyó además que Bancolombia en épocas de crisis logra ser mucho más realista al afrontar los momentos. Las crisis se muestran como caos dentro de un sistema simple y organizado que afecta a sus diferentes variables no lineales, y que puede llegar a una interacción entre otros sistemas, produciendo así comportamientos críticos y complicados. Se muestra también que la complejidad dentro de un sistema financiero es una creación de interacciones simples que muestran un parámetro claro, casi deducible, que al interactuar entre todas se convierte en complejidad para las organizaciones como Bancolombia.
Estado situacional de los modelos basados en agentes y su impacto en la investigación organizacional
Resumo:
En un mundo hiperconectado, dinámico y cargado de incertidumbre como el actual, los métodos y modelos analíticos convencionales están mostrando sus limitaciones. Las organizaciones requieren, por tanto, herramientas útiles que empleen tecnología de información y modelos de simulación computacional como mecanismos para la toma de decisiones y la resolución de problemas. Una de las más recientes, potentes y prometedoras es el modelamiento y la simulación basados en agentes (MSBA). Muchas organizaciones, incluidas empresas consultoras, emplean esta técnica para comprender fenómenos, hacer evaluación de estrategias y resolver problemas de diversa índole. Pese a ello, no existe (hasta donde conocemos) un estado situacional acerca del MSBA y su aplicación a la investigación organizacional. Cabe anotar, además, que por su novedad no es un tema suficientemente difundido y trabajado en Latinoamérica. En consecuencia, este proyecto pretende elaborar un estado situacional sobre el MSBA y su impacto sobre la investigación organizacional.
Resumo:
Las organizaciones en la actualidad deben encontrar diferentes maneras de sobrevivir en un tiempo de rápida transformación. Uno de los mecanismos usados por las empresas para adaptarse a los cambios organizacionales son los sistemas de control de gestión, que a su vez permiten a las organizaciones hacer un seguimiento a sus procesos, para que la adaptabilidad sea efectiva. Otra variable importante para la adaptación es el aprendizaje organizacional siendo el proceso mediante el cual las organizaciones se adaptan a los cambios del entorno, tanto interno como externo de la compañía. Dado lo anterior, este proyecto se basa en la extracción de documentación soporte valido, que permita explorar las interacciones entre estos dos campos, los sistemas de control de gestión y el aprendizaje organizacional, además, analizar el impacto de estas interacciones en la perdurabilidad organizacional.
Resumo:
Planning a project with proper considerations of all necessary factors and managing a project to ensure its successful implementation will face a lot of challenges. Initial stage in planning a project for bidding a project is costly, time consuming and usually with poor accuracy on cost and effort predictions. On the other hand, detailed information for previous projects may be buried in piles of archived documents which can be increasingly difficult to learn from the previous experiences. Project portfolio has been brought into this field aiming to improve the information sharing and management among different projects. However, the amount of information that could be shared is still limited to generic information. This paper, we report a recently developed software system COBRA to automatically generate a project plan with effort estimation of time and cost based on data collected from previous completed projects. To maximise the data sharing and management among different projects, we proposed a method of using product based planning from PRINCE2 methodology. (Automated Project Information Sharing and Management System -�COBRA) Keywords: project management, product based planning, best practice, PRINCE2
Resumo:
Studies of construction labour productivity have revealed that limited predictability and multi-agent social complexity make long-range planning of construction projects extremely inaccurate. Fire-fighting, a cultural feature of construction project management, social and structural diversity of involved permanent organizations, and structural temporality all contribute towards relational failures and frequent changes. The main purpose of this paper is therefore to demonstrate that appropriate construction planning may have a profound synergistic effect on structural integration of a project organization. Using the general systems theory perspective it is further a specific objective to investigate and evaluate organizational effects of changes in planning and potentials for achieving continuous project-organizational synergy. The newly developed methodology recognises that planning should also represent a continuous, improvement-leading driving force throughout a project. The synergistic effect of the process planning membership duality fostered project-wide integration, eliminated internal boundaries, and created a pool of constantly upgrading knowledge. It maintained a creative environment that resulted in a number of process-related improvements from all parts of the organization. As a result labour productivity has seen increases of more than 30%, profits have risen from an average of 12% to more than 18%, and project durations have been reduced by several days.
Resumo:
The term commercial management has been used for some time, similarly the job title commercial manager. However, as of yet, little emphasis has been placed on defining. This paper presents the findings from a two-year research initiative that has compared and contrasted the role of commercial managers from a range of organisations and across industry sectors, as a first step in developing a body of knowledge for commercial. It is argued that there are compelling arguments for considering commercial management, not solely as atask undertaken by commercial managers, but as a discipline in itself: a discipline that, arguably, bridges traditional project management and organisational theories. While the study has established differences in approach and application both between and within industry sectors, it has established sufficient similarity and synergy in practice to identify a specific role of commercial management in project-based organisations. These similarities encompass contract management and dispute resolution; the divergences include a greater involvement in financial and value management in construction and in bid management in defence/aerospace.