920 resultados para Project 2004-032-A : Construction Industry Business Environment (CIBE)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The failure of learning from our mistakes or those of others, has generated unnecessary waste of time and costs, in the construction industry, due to its project based, fragmented and unstable nature. Lessons Learned, as an important way of improving projects performance, is analyzed in this study, with the aim to explore the current practice of Lessons Learned in the UAE construction industry. A literature review has revealed what “Lessons Learned” is under different contexts, and focused on various factors influencing a Lessons Learned Programme. The research method of a series of structured interviews, followed by an on line questionnaire, is adopted in this study. It was found that although the concept of Lessons Learned is quite familiar by most of professionals in the project management in the UAE construction industry, Lessons Learned practice is mainly performed in an informal way (individually or ad hoc). As for barriers for Lessons Learned practice, Culture factors, such as “Afraid to be blamed for mistakes” and “lack of learning culture” (1st and 2nd rank) influence significantly in Lessons Learned practice. It is also found that a formal lessons learned programme does exist in some organizations. However, with the lack of a dedicated Lessons Learned repository and Lessons Learnt system, Lessons Learned has yet a long way to reach its potential.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Outcome of the research is to identify significant factors influencing the productivity and performance of the road construction industry in Sri Lanka and to compare the identified factors with the Australian construction industry. Also to recommend strategies to improve productivity and performance of the Sri Lankan Industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The literature has emphasized that absorptive capacity (AC) leads to performance, but in projects its influences still unclear. Additionally, the project success is not well understood by the literature, and AC can be an important mechanism to explain it. Therefore, the purpose of this study is to investigate the effect of absorptive capacity on project performance in the construction industry of São Paulo State. We study this influence through potential and realized absorptive capacity proposed by Zahra and George (2002). For achieving this goal, we use a combination of qualitative and quantitative research. The qualitative research is based on 15 interviews with project managers in different sectors to understand the main constructs and support the next quantitative phase. The content analysis was the technique used to analyze those interviews. In quantitative phase through a survey questionnaire, we collected 157 responses in the construction sector with project managers. The confirmatory factor analysis and hierarchical linear regression were the techniques used to assess the data. Our findings suggest that the realized absorptive capacity has a positive influence on performance, but potential absorptive capacity and the interactions effect have no influence on performance. Moreover, the planning and monitoring have a positive impact on budget and schedule, and customer satisfaction while risk coping capacity has a positive impact on business success. In academics terms, this research enables a better understanding of the importance of absorptive capacity in the construction industry and it confirms that knowledge application in processes and routines enhances performance. For management, the absorptive capacity enables the improvements of internal capabilities reflected in the increased project management efficiency. Indeed, when a company manages project practices efficiently it enhances business and project performance; however, it needs initially to improve its internal abilities to enrich processes and routines through relevant knowledge.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this paper is to investigate the cost management practices of building industry companies of Parana that follow the typology of Porter's strategies. The sample comprises member companies of the Association of Construction Industries of the State of Parana (PR-SINDUSCON) operating in the segment of residential buildings. The data were collected by means of questionnaires sent to 317 SINDUSCON members. 69 were returned and 54 used for our research. Exploratory Factorial Analysis of the data allowed us to identify two groups of cost management practices. Analyses suggest equality between the adopted cost management practices and the Cost Control Planning (CCP) practices among the companies of the Group 1, regardless of the generic strategy adopted. The companies of the Group 2 that adopted the differentiation strategy seem to use mainly the ACR cost management practice. Our findings differ from those obtained by Chenhall insofar as companies that adopt low cost strategies tend to use managerial controls focused on cost control and rigid budgetary controls.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is characterised by fragmentation and suffers from lack of collaboration, often adopting adversarial working practices to achieve deliverables. For the UK Government and construction industry, BIM is a game changer aiming to rectify this fragmentation and promote collaboration. However it has become clear that there is an essential need to have better controls and definitions of both data deliverables and data classification. Traditional methods and techniques for collating and inputting data have shown to be time consuming and provide little to improve or add value to the overall task of improving deliverables. Hence arose the need in the industry to develop a Digital Plan of Work (DPoW) toolkit that would aid the decision making process, providing the required control over the project workflows and data deliverables, and enabling better collaboration through transparency of need and delivery. The specification for the existing Digital Plan of Work (DPoW) was to be, an industry standard method of describing geometric, requirements and data deliveries at key stages of the project cycle, with the addition of a structured and standardised information classification system. However surveys and interviews conducted within this research indicate that the current DPoW resembles a digitised version of the pre-existing plans of work and does not push towards the data enriched decision-making abilities that advancements in technology now offer. A Digital Framework is not simply the digitisation of current or historic standard methods and procedures, it is a new intelligent driven digital system that uses new tools, processes, procedures and work flows to eradicate waste and increase efficiency. In addition to reporting on conducted surveys above, this research paper will present a theoretical investigation into usage of Intelligent Decision Support Systems within a digital plan of work framework. Furthermore this paper will present findings on the suitability to utilise advancements in intelligent decision-making system frameworks and Artificial Intelligence for a UK BIM Framework. This should form the foundations of decision-making for projects implemented at BIM level 2. The gap identified in this paper is that the current digital toolkit does not incorporate the intelligent characteristics available in other industries through advancements in technology and collation of vast amounts of data that a digital plan of work framework could have access to and begin to develop, learn and adapt for decision-making through the live interaction of project stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article explores the notion that the workplace is a learning environment, and that the line manager is a key player determining its effectiveness. The work discusses how performance management systems may be used to clarify expectations made of line managers with regard to employee development. The work, in addition, suggests that line manager people management expertise may be a factor inhibiting workplace development for subordinates, and makes a number of suggestions about how to prepare the line manager for effective employee development. Key issues are illustrated by reference to a case study example. The case demonstrates that a high profile management development programme within a major international organisation failed to meet all objectives because of the unwillingness of the line management team to participate in the development of subordinates back in the workplace.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis addresses the economic impacts of construction safety in Greece. The research involved the development of a methodology for determining the overall costs of safety, namely the sum of the costs of accidents and the costs of safety management failures (with or without accident) including image cost. Hitherto, very little work has been published on the cost of accidents in practical case studies. Moreover, to the author’s belief, no research has been published that seeks to determine in real cases the costs of prevention. The methodology developed is new, transparent, and capable of being replicated and adapted to other employment sectors and to other countries. The methodology was applied to three construction projects in Greece to test the safety costing methodology and to offer some preliminary evidence on the business case for safety. The survey work took place between 1999 and 2001 and involved 27 months of costing work on site. The study focuses on the overall costs of safety that apply to the main (principal) contractor. The methodology is supported by 120 discrete cost categories, and systematic criteria for determining which costs are included (counted) in the overall cost of safety. A quality system (in compliance with ISO9000 series) was developed to support the work and ensure accuracy of data gathering. The results of the study offer some support for the business case for safety. Though they offer good support for the economics of safety as they demonstrate need for cost effectiveness. Subject to important caveats, those projects that appeared to manage safety more cost-effectively achieved the lowest overall safety cost. Nevertheless, results are significantly lower than of other published works for two main reasons; first costs due to damages with no potential to injury were not included and second only costs to main constructor were considered. Study’s results are discussed and compared with other publish works.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the U.S., construction accidents remain a significant economic and social problem. Despite recent improvement, the Construction industry, generally, has lagged behind other industries in implementing safety as a total management process for achieving zero accidents and developing a high-performance safety culture. One aspect of this total approach to safety that has frustrated the construction industry the most has been “measurement”, which involves identifying and quantifying the factors that critically influence safe work behaviors. The basic problem attributed is the difficulty in assessing what to measure and how to measure it—particularly the intangible aspects of safety. Without measurement, the notion of continuous improvement is hard to follow. This research was undertaken to develop a strategic framework for the measurement and continuous improvement of total safety in order to achieve and sustain the goal of zero accidents, while improving the quality, productivity and the competitiveness of the construction industry as it moves forward. The research based itself on an integral model of total safety that allowed decomposition of safety into interior and exterior characteristics using a multiattribute analysis technique. Statistical relationships between total safety dimensions and safety performance (measured by safe work behavior) were revealed through a series of latent variables (factors) that describe the total safety environment of a construction organization. A structural equation model (SEM) was estimated for the latent variables to quantify relationships among them and between these total safety determinants and safety performance of a construction organization. The developed SEM constituted a strategic framework for identifying, measuring, and continuously improving safety as a total concern for achieving and sustaining the goal of zero accidents.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The UK construction industry is notorious for the sheer amount of disputes which are likely to arise on each building and engineering project. Despite numerous creative attempts at “dispute avoidance” and “dispute resolution”, this industry is still plagued with these costly disputes. Whilst both academic literature and professional practices have investigated the causes of disputes and the mechanisms for avoidance/resolution of these disputes, neither has studied in any detail the nature of the construction disputes and why they develop as they do once a construction lawyer is engaged. Accordingly, this research explores the question of what influences the outcome of a construction dispute and to what extent do construction lawyers control or direct this outcome? The research approach was ethnographic. Fieldwork took place at a leading construction law firm in London over 18 months. The primary focus was participant observation in all of the firm’s activities. In addition, a database was compiled from the firm’s files and archives, thus providing information for quantitative analysis. The basis of the theoretical framework, and indeed the research method, was the Actor‐Network Theory (ANT). As such, this research viewed a dispute as a set of associations – an entity which takes form and acquires its attributes as a result of its relations with other entities. This viewpoint is aligned with relational contract theories, which in turn provides a unified platform for exploring the disputes. The research investigated the entities and events which appeared to influence the dispute’s identity, shape and outcome. With regard to a dispute’s trajectory, the research took as its starting point that a dispute follows the transformation of “naming, blaming, claiming…”, as identified by Felstiner, Abel and Sarat in 1980. The research found that construction disputes generally materialise and develop prior to any one of the parties approaching a lawyer. Once the lawyer is engaged, we see the reverse of the trajectory “naming, blaming, claiming…” this being: “claiming, blaming, naming…” The lawyers’ role is to identify or name (or rename) the dispute in the best possible light for their client in order to achieve the desired outcome – the development of which is akin to the design process. The transformation of a dispute and the reverse trajectory is by no means linear, but rather, iterative and spatial as it requires alliances, dependencies and contingencies to assemble and take the shape it does. The research concludes that construction disputes are rarely ever completely “resolved” as such. Whilst an independent third party may hand down a judgment, or the parties may reach a settlement agreement, this state is only temporal. Some construction disputes dissipate whist others reach a state of hibernation for a period of time only to pick up momentum and energy some years later. Accordingly, this research suggests that the concept of “dispute resolution” does not exist in the UK construction industry. The ultimate goal should be for parties to reach this ultimate and perpetual state of equilibrium as quickly and as cost effectively as possible: “dispute dissolution”, the slowing down of the dispute’s momentum. Rather than focusing on the design and assemblage of the dispute, the lawyers’ role therein is, or should be, to assist with the “disassembling” of the dispute.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The university sector offers innovative research initiatives which industry should be tapping. Michael Craven, Senior Research Fellow at the University of Nottingham, reports on a unique collaboration between academia and industry that is helping companies assess the value of medical technology.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Effective performance measurement drives performance and supports the development of construction. Only minimal literature measuring construction performance, efficiency and effectiveness simultaneously can be identified. A global relational two-stage data envelopment analysis (DEA) method is here proposed in order to produce effective and informative performance results. A relational two-stage DEA method systematically measures overall efficiency for a whole construction system and also yields scores for the individual stages of construction. The DEA results can be directly compared through global benchmark technology. The Australian construction industry is employed in order to implement the new method, in which profitability performance as a vital indicator of business survival, and its two dimensions of efficiency and effectiveness, are measured. The construction profitability performance and efficiency measures obtained provide evidence of underperformance and a slight imbalance in Australia between 1991 and 2012, while the measures obtained for the effectiveness factor indicate better achievement. The approach here developed promotes progress in modelling two-stage performance measurement and it can be replicated worldwide by construction projects, organizations or industries in order to quantify their performance, identify internal inefficiency components and recognize competitive advantages for promoting sustainable development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - The purpose of this paper is to investigate and analyse the perceptions of South Australian construction practitioners on drivers affecting the implementation of reverse logistics (RL). In this context, RL is defined as the process of moving goods from their typical final destination for the purpose of capturing value or ensuring proper disposal.

Design/methodology/approach - Semi-structured interviews were conducted with eight practitioners to collect data and the interview transcripts were analysed using the NVivo (version 10) package. Cluster analysis was used to cross-validate the findings and provide an in-depth insight into the findings.

Findings - The findings indicate that most of the drivers identified in earlier research are relevant for the construction industry. In addition, the study identified some new drivers that are categorised as "targeted demands by an exclusive clientele". These drivers were found to be complementary to the economic, environmental and social drivers as previously conceptualised. In addition, a set of factors affecting the strength of drivers that had been overlooked in previous studies emanated from the interview analysis. These include the type of project and the attributes of clients, both of which strongly affect the drivers of RL implementation in construction.

Research limitations/implications - The major limitations are the relatively small size of the sample of interviewees and having interviewees from one geographic area with specific socio-economic characteristics.

Practical implications
- The identified drivers and the clustering of RL themes could be used by practitioners as a "road map" for the development of appropriate solutions to successfully promote RL within the construction industry. Organisational energies could thus be channelled towards the drivers that need the most improvement.

Originality/value - The study contributes to this research sphere by employing cluster analysis to customise and contextualise the drivers that were previously identified. The study goes beyond the extant literature by discovering the prominent effects of these drivers on the impact of targeted demands by an exclusive clientele. This could be of great value in terms of creating avenues for future investigations on the topic.